Epson Aculaser M 2000 Service Manual
Here you can view all the pages of manual Epson Aculaser M 2000 Service Manual. The Epson manuals for Printer are available online for free. You can easily download all the documents as PDF.
Page 191
EPSON AcuLaser C9200NRevision D DISASSEMBLY AND ASSEMBLY Main Unit Disassembly/Reassembly 191 Confidential4. Reinstall the Stopper [7]. When reinstalling the Stopper, use care so that both ends of the Stopper will not open but stay parallel as shown in the figure above. Keep using the Stopper after once stretched out may cause uneven pitch or other image troubles. Ó · [7] 4038F2C115DA 5. Reinstall the Gear [8]. 6. Connect the Connector and the Flat Cable. † When reinstalling the Gear [8], make...
Page 192
EPSON AcuLaser C9200NRevision D DISASSEMBLY AND ASSEMBLY Main Unit Disassembly/Reassembly 192 Confidential7. Install the Photoconductor Unit Guide Rail [9]. Make sure that the two Claws [10] at rear end of the rail are fit in the locating hole on the Main Unit. 8. Reinstall the Transfer Belt Unit. 9. Reinstall the Front Door. 10.Make skew adjustment of the PH Unit. When installing the PH Unit, make sure to conduct PH Unit skew adjustment regardless of whether the Unit is new or...
Page 193
EPSON AcuLaser C9200NRevision D DISASSEMBLY AND ASSEMBLY Main Unit Disassembly/Reassembly 193 Confidential4.3.4 Group 4CONTENT DISASSEMBLY FLOWCHART Parts/Units to be Disassembled Guide Rear Left Cover + Front Left CoverExit TrayUpper Cover + Control PanelDC Power Supply (PU1) ABCD Rear Left Cover Upper Cover + Control Panel C Exit Tray B Front Left Cover A A DC Power Supply (PU1) D C1C2 D1D2 B1 A1 B2 C3 D3 B3 C4 D4D5 Rear Left Cover + Front Left Cover (P. 194) Right Rear Cover + Rear Cove r (P....
Page 194
EPSON AcuLaser C9200NRevision D DISASSEMBLY AND ASSEMBLY Main Unit Disassembly/Reassembly 194 Confidential Rear Left Cover + Front Left Cover 1. Remove two Screws [2], and remove the Rear Left Cover [3]. 2. Open the Front Door [1]. 3. Remove two Screws [4], and remove the Front Left Cover [5]. A1 B1 C1 D1 [1] [2] [3][4] [5] Right Rear Cover + Rear Cover 1. Open the Right Door [1]. 2. Remove three Screws [2], and remove the Right Rear Cover [3]. 3. Remove nine Screws [4], and remove the Rear Cover...
Page 195
EPSON AcuLaser C9200NRevision D DISASSEMBLY AND ASSEMBLY Main Unit Disassembly/Reassembly 195 Confidential Exit Tray 1. Open the Upper Fusing Cover [2]. 2. Remove two Claws [3], and remove the Upper Fusing Cover [2]. B3 C3 D3 [2] [3] [3] 4039F2C019DA 3. Remove two Screws [5], and remove the Exit Sensor Holder [6]. 4. Remove three Screws [7], and remove the Exit Tray [8]. [5] [6] [7] [8]
Page 196
EPSON AcuLaser C9200NRevision D DISASSEMBLY AND ASSEMBLY Main Unit Disassembly/Reassembly 196 Confidential Upper Cover + Control Panel 1. Remove four Screws [1]. C4 D4 [1][1] 2. Remove the Ground terminal [2]. 3. Remove the Connector [3], then remove the Upper Cover [4]. 4. Remove five Screws [5], then remove the Control Panel [6]. Be careful when removing the Ground terminal because the edge of the Faston terminal is sharp. Make sure to work with gloves on to avoid getting injured. [2] [3] [5]...
Page 197
EPSON AcuLaser C9200NRevision D DISASSEMBLY AND ASSEMBLY Main Unit Disassembly/Reassembly 197 Confidential DC Power Supply (PU1) 1. Remove nine Screws [1] and the Connector [2], then remove the protective sheet of the DC Power Supply [3]. D5 [2] [1] [1] [3] 2. Remove all the Connectors on the DC Power Supply. 3. Remove eight Screws [4], and remove the DC Power Supply [5]. [5] [4] [4]
Page 198
EPSON AcuLaser C9200NRevision D DISASSEMBLY AND ASSEMBLY Main Unit Disassembly/Reassembly 198 Confidential4.3.5 Group 5CONTENT Parts/Units to be Disassembled Guide Controller Board (PWB-P)Mechanical Control Board (PWB-M)RTC Board (PWB-R) ABC RTC Board (PWB-R) C B Mechanical Control Board (PWB-M) Controller Board (PWB-P) A
Page 199
EPSON AcuLaser C9200NRevision D DISASSEMBLY AND ASSEMBLY Main Unit Disassembly/Reassembly 199 ConfidentialDISASSEMBLY FLOWCHART B1 A1 C5 C1 B2B3B4 A2C2 C3C4B5 Rear Left Cover + Front Left Cover (P. 200) Start Controller Board (PWB-P) (P. 200) RTC Board (PWB-R) (P. 205) Mechanical Control Board (PWB-M) (P. 203)Exit Tray(P. 201) Controller Board Mounting Bracket (P. 202)
Page 200
EPSON AcuLaser C9200NRevision D DISASSEMBLY AND ASSEMBLY Main Unit Disassembly/Reassembly 200 Confidential Rear Left Cover + Front Left Cover 1. Remove two Screws [2], and remove the Rear Left Cover [3]. 2. Open the Front Door [1]. 3. Remove two Screws [4], and remove the Front Left Cover [5]. A1 B1 C1 [1] [2] [3][4] [5] Controller Board (PWB-P) 1. Remove six Screws [1]. A2 B2 C2