Home > Epson > Printer > Epson 4880 C Service Manual

Epson 4880 C Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Epson 4880 C Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1734 Epson manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 506
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 311 13. Peel off the acetate tape binding the FFC to release the FFC.
    (Refer to Figure 4-146.)
    14. Release the four Harness, CSICs and the I/H Lever Sensor (Left) 
    harness from the two clamps and the acetate tape.
    (Refer to Figure 4-147.)
    Figure 4-146. Releasing Harnesses_5
    Figure 4-147. Releasing Harnesses_6
    Step 13
    Acetate Tape
    Clamps
    Step 14
    Acetate Tape 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 312 15. Move Carriage Unit to center of printer.
    (Refer to 4.2.4.3 C593_SUB Board (p234).)
    16. Remove the two screws securing rear side of I/H Right Unit.
    (Refer to Figure 4-148.)
    „C.B.S. 3x6: 2 pcs.
    17. Remove the two screws securing the front side of I/H Right Unit.
    (Refer to Figure 4-149.)
    „C.B.S. 3x12: 2pcs.
    Figure 4-148. Screws Securing Rear Side of I/H Right Unit
    Figure 4-149. Screws Securing Front Side of I/H Right Unit
    C.B.S. 3x6
    I/H Right Unit
    C.B.S. 3x12
    I/H Right Unit 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 313 18. Pull the I/H Right Unit forward from the printer following the order below 
    while pulling the Harness, CSIC and I/H Lever Sensor (Right) harness 
    from the hole in the frame. (Refer to Figure 4-150.)
    18-1. To avoid interference of the printer frame hole and I/H Right Unit 
    shaft, shift the I/H Right Unit to the left.
    18-2. With the right side of the Paper Eject Unit lifted up, pull the I/H 
    Right Unit forward from the printer.
    19. Pick up and release the two hooks securing the I/H Lever Sensor (Right) 
    and then remove the I/H Lever Sensor (Right). (Refer to Figure 4-151.)
    20. Disconnect connector from I/H Lever Sensor (Right). 
    (Refer to Figure 4-151.)Figure 4-150. I/H Right Unit Removal
    Figure 4-151. I/H Lever Sensor (Right) Removal
    The four grounding springs on the top of the I/H Right Unit 
    make contact with the printer frame, so install the I/H Right 
    Unit while lightly holding down the grounding springs so as 
    not to deform them.
    Grounding Springs
    Step 18-1
    Shaft and Frame interference
    1
    2
    3
    Paper Eject Unit
    Pull harness through this hole
    Hooks
    I/H Lever Sensor (Right)
    Connector 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 314 21. Remove the two screws securing Cover, Holder, IC, Right and remove 
    Cover, Holder, IC, Right. (Refer to Figure 4-152.)
    „C.B.S. 3x6: 2 pcs.
    Figure 4-152. Cover, Holder, IC, Right Removal
    „When the Ink Lever is installed against the angle set 
    location as shown in the illustration, confirm that the two 
    holes of Fan Gear, 34 form a line parallel to the bottom 
    of Frame, Holder, IC.
    „Align the two dowels on holder side with the two 
    positioning holes on the Cover, Holder, IC, Right.
    (Refer to Figure 4-152.)
    Ink Lever
    Holes
    Parallel Alignment
    Angle Set Location
    Fan Gear, 34
    Frame, Holder, IC
    Dowels and Positioning Holes
    C.B.S. 3x6
    Cover, Holder, IC, Right 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 315 22. Loosen the four Coupling Screw, M7 securing the four Tube, Supply, 
    Inks and then disconnect Tube, Supply, Ink from I/H Right Unit.
    Figure 4-153. I/H Right Unit Removal
    When performing the following steps, be careful of the 
    points below.
    „Ink may leak or splatter, so have cleaning rags ready and 
    prevent ink from getting on the surrounding work area.
    „Prevent dust and dirt from getting inside the Tube, 
    Supply, Ink.„Confirm that O-Ring, Coupling M7 has been installed.
    „The Tube, Supply, Ink has been marked with its color. 
    Install while confirming that the mark matches the 
    receptacle.
    „Use the following order to install the Tube, Supply, Ink 
    while routing it to the installation location.
    LM (M)→ LC(C) →PK (MK) → LK (Y)
    „Refer to Figure 4-153 and properly route Tube, Supply, 
    Ink.
    „Firmly insert Tube, Supply, Ink into receptacles and 
    tighten Coupling Screw, M7.
    „To prevent ink leakage and damage on the Coupling  
    screw, be sure to tighten the Coupling Screw, M7 with 
    the prescribed torque and the tool specified below.
    •Tool: Torque Wrench 1.25/1.75 (1277142)
    •Tightning torque: 1.25 ( ± 0.25) kgf • cm
    O-Ring, Coupling M7
    Coupling Screw, M7
    Locations where ink tubes are routed
    Tube, Supply, Ink 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 3164.2.8.6  Box Assy., Flushing / Pump Unit1.Remove Cover, Side, Right (p217).
    2.Remove Motor Assy., PG (p274).
    3. Move the Carriage Unit to center of printer. 
    (Refer to 4.2.4.3 C593_SUB Board (p234).)
    4. Remove the screw securing the Box Assy., Flushing.
     (Refer to Figure 4-154.)
    „C.B.S. 3x8: 1 pcs.
    5. Slide the Box Assy., Flushing to the right and release the rib as shown in 
    Figure 4-154 ( ), lift the wast ink pipe upward to pull it out ( ), then 
    remove the Box Assy., Flushing while tilting it forward to avoid 
    interference with the printer frame ( ).
    Figure 4-154. Box Assy., Flushing Removal
    When removing the Box Assy., Flushing and Pump Unit, 
    ink may leak from the Box Assy., Flushing ink discharge 
    port or the Pump Unit waste ink tube. Have cleaning rags 
    ready and prevent ink from getting on the surrounding work 
    area.„Pass the Box Assy., Flushing waste ink pipe through 
    the hole in the bottom of the frame.
    „Make sure the Box Assy., Flushing rib is fitted into the 
    Induction Duct positioning hole.
    1
    3
    C.B.S. 3x8
    2
    Waste Ink Pipe
    Location of interference
    Box Assy., Flushing
    RibInduction Duct 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 317 6. Remove the two screws securing the Shaft, Transmission, PG Unit and 
    then remove the Shaft, Transmission, PG Unit by pulling it out of the hole 
    in the frame. (Refer to Figure 4-155.)
    „C.B.S. 3x6: 2 pcs.
    Figure 4-155. Shaft, Transmission, PG Unit Removal
    Be careful not to scratch the Shaft, Transmission, PG Unit 
    gear by bumping it against the frame.„Align Shaft, Transmission, PG Unit positioning hole 
    with dowel on frame. (Refer to Figure 4-155.)
    „Make sure that the Pump Phase Sensor harness is 
    routed over the Shaft, Transmission, PG Unit shaft. 
    (Refer to Figure 4-155.)
    Dowel and Positioning Hole
    C.B.S. 3x6
    Harness 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 318 7. While keeping the sheet turned aside, remove Extension Spring, 0.262 
    from the tabs of Mount Assy., Plate, Motor, ASF, SP and Lever, Lock, 
    DE. (Refer to Figure 4-156.)
    8. Pull the Lever, Lock, Planetary toward the outside of the printer, release 
    the hook on top and then pull out of the Lever, Lock, DE. 
    (Refer to Figure 4-157.)Figure 4-156. Extension Spring, 0.262 Removal
    Figure 4-157. Lever, Lock, Planetary Removal
    When performing the following steps, be careful of the 
    points below.
    „Do not lose Extension Spring, 0.262.
    „Use care not to pull Extension Spring, 0.262 too much, 
    or it may loose the spring force.
    „Do not touch the Cleaner, Head or allow it to contact 
    other parts. (This could lower print quality due to not 
    wiping ink normally.)After installing the Lever, Lock, Planetary, confirm that 
    Lever, Lock, DE moves smoothly by the tension of 
    Extension Spring, 0.262. (Check three times.)
    Cleaner, Head
    Sheet
    Extension Spring, 0.262
    Lever, Lock, DE
    Tads
    Lever, Lock, Planetary 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 319 9. Remove the Lever, Lock, DE by following the steps below.
    (Refer to Figure 4-158.)
    9-1. Slide it to the right.
    9-2. Bend it toward the center.
    9-3. Remove the left end from the installation hole.
    9-4. Remove Lever, Lock, DE while extracting the flag at the right end 
    from the hole in the frame.
    Figure 4-158. Lever, Lock, DE Removal
    Installation Hole
    Step 9-1
    Step 9-3
    Step 9-2
    Flag
    Step 9-4 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 320 10. Disconnect the connector from the Pump Phase Sensor from behind the 
    printer. (Refer to Figure 4-159.)
    11. Free all the harnesses from the U-shaped notch of the Frame, Base, Side, 
    Right. (Refer to Figure 4-159.)
    12. Remove the four screws securing the Pump Unit. (Refer to Figure 4-160.)
    „C.B.S. 3x6: 3 pcs.
    „C.B.S. 3x8: 1 pc.
    13. Shift the Pump Unit to the right side and disconnect the linkage with 
    Combination Gear, 13.6, 28.8. (Refer to Figure 4-161.)
    14. Remove Pump Unit toward rear. (Refer to Figure 4-161.)
    Figure 4-159. Disconnecting the Pump Phase Sensor ConnectorFigure 4-160. Screws Securing Pump Unit
    Figure 4-161. Pump Unit Removal
    Connector
    Releasing Harnesses
    Pump Unit
    C.B.S. 3x8
     C.B.S. 3x6
    Linkage Location
    Combination Gear, 13.6, 28.8 
    						
    All Epson manuals Comments (17)

    Related Manuals for Epson 4880 C Service Manual