Epson 4880 C Service Manual
Have a look at the manual Epson 4880 C Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1734 Epson manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 311 13. Peel off the acetate tape binding the FFC to release the FFC. (Refer to Figure 4-146.) 14. Release the four Harness, CSICs and the I/H Lever Sensor (Left) harness from the two clamps and the acetate tape. (Refer to Figure 4-147.) Figure 4-146. Releasing Harnesses_5 Figure 4-147. Releasing Harnesses_6 Step 13 Acetate Tape Clamps Step 14 Acetate Tape
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 312 15. Move Carriage Unit to center of printer. (Refer to 4.2.4.3 C593_SUB Board (p234).) 16. Remove the two screws securing rear side of I/H Right Unit. (Refer to Figure 4-148.) „C.B.S. 3x6: 2 pcs. 17. Remove the two screws securing the front side of I/H Right Unit. (Refer to Figure 4-149.) „C.B.S. 3x12: 2pcs. Figure 4-148. Screws Securing Rear Side of I/H Right Unit Figure 4-149. Screws Securing Front Side of I/H Right Unit C.B.S. 3x6 I/H Right Unit C.B.S. 3x12 I/H Right Unit
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 313 18. Pull the I/H Right Unit forward from the printer following the order below while pulling the Harness, CSIC and I/H Lever Sensor (Right) harness from the hole in the frame. (Refer to Figure 4-150.) 18-1. To avoid interference of the printer frame hole and I/H Right Unit shaft, shift the I/H Right Unit to the left. 18-2. With the right side of the Paper Eject Unit lifted up, pull the I/H Right Unit forward from the printer. 19. Pick up and release the two hooks securing the I/H Lever Sensor (Right) and then remove the I/H Lever Sensor (Right). (Refer to Figure 4-151.) 20. Disconnect connector from I/H Lever Sensor (Right). (Refer to Figure 4-151.)Figure 4-150. I/H Right Unit Removal Figure 4-151. I/H Lever Sensor (Right) Removal The four grounding springs on the top of the I/H Right Unit make contact with the printer frame, so install the I/H Right Unit while lightly holding down the grounding springs so as not to deform them. Grounding Springs Step 18-1 Shaft and Frame interference 1 2 3 Paper Eject Unit Pull harness through this hole Hooks I/H Lever Sensor (Right) Connector
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 314 21. Remove the two screws securing Cover, Holder, IC, Right and remove Cover, Holder, IC, Right. (Refer to Figure 4-152.) „C.B.S. 3x6: 2 pcs. Figure 4-152. Cover, Holder, IC, Right Removal „When the Ink Lever is installed against the angle set location as shown in the illustration, confirm that the two holes of Fan Gear, 34 form a line parallel to the bottom of Frame, Holder, IC. „Align the two dowels on holder side with the two positioning holes on the Cover, Holder, IC, Right. (Refer to Figure 4-152.) Ink Lever Holes Parallel Alignment Angle Set Location Fan Gear, 34 Frame, Holder, IC Dowels and Positioning Holes C.B.S. 3x6 Cover, Holder, IC, Right
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 315 22. Loosen the four Coupling Screw, M7 securing the four Tube, Supply, Inks and then disconnect Tube, Supply, Ink from I/H Right Unit. Figure 4-153. I/H Right Unit Removal When performing the following steps, be careful of the points below. „Ink may leak or splatter, so have cleaning rags ready and prevent ink from getting on the surrounding work area. „Prevent dust and dirt from getting inside the Tube, Supply, Ink.„Confirm that O-Ring, Coupling M7 has been installed. „The Tube, Supply, Ink has been marked with its color. Install while confirming that the mark matches the receptacle. „Use the following order to install the Tube, Supply, Ink while routing it to the installation location. LM (M)→ LC(C) →PK (MK) → LK (Y) „Refer to Figure 4-153 and properly route Tube, Supply, Ink. „Firmly insert Tube, Supply, Ink into receptacles and tighten Coupling Screw, M7. „To prevent ink leakage and damage on the Coupling screw, be sure to tighten the Coupling Screw, M7 with the prescribed torque and the tool specified below. •Tool: Torque Wrench 1.25/1.75 (1277142) •Tightning torque: 1.25 ( ± 0.25) kgf • cm O-Ring, Coupling M7 Coupling Screw, M7 Locations where ink tubes are routed Tube, Supply, Ink
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 3164.2.8.6 Box Assy., Flushing / Pump Unit1.Remove Cover, Side, Right (p217). 2.Remove Motor Assy., PG (p274). 3. Move the Carriage Unit to center of printer. (Refer to 4.2.4.3 C593_SUB Board (p234).) 4. Remove the screw securing the Box Assy., Flushing. (Refer to Figure 4-154.) „C.B.S. 3x8: 1 pcs. 5. Slide the Box Assy., Flushing to the right and release the rib as shown in Figure 4-154 ( ), lift the wast ink pipe upward to pull it out ( ), then remove the Box Assy., Flushing while tilting it forward to avoid interference with the printer frame ( ). Figure 4-154. Box Assy., Flushing Removal When removing the Box Assy., Flushing and Pump Unit, ink may leak from the Box Assy., Flushing ink discharge port or the Pump Unit waste ink tube. Have cleaning rags ready and prevent ink from getting on the surrounding work area.„Pass the Box Assy., Flushing waste ink pipe through the hole in the bottom of the frame. „Make sure the Box Assy., Flushing rib is fitted into the Induction Duct positioning hole. 1 3 C.B.S. 3x8 2 Waste Ink Pipe Location of interference Box Assy., Flushing RibInduction Duct
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 317 6. Remove the two screws securing the Shaft, Transmission, PG Unit and then remove the Shaft, Transmission, PG Unit by pulling it out of the hole in the frame. (Refer to Figure 4-155.) „C.B.S. 3x6: 2 pcs. Figure 4-155. Shaft, Transmission, PG Unit Removal Be careful not to scratch the Shaft, Transmission, PG Unit gear by bumping it against the frame.„Align Shaft, Transmission, PG Unit positioning hole with dowel on frame. (Refer to Figure 4-155.) „Make sure that the Pump Phase Sensor harness is routed over the Shaft, Transmission, PG Unit shaft. (Refer to Figure 4-155.) Dowel and Positioning Hole C.B.S. 3x6 Harness
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 318 7. While keeping the sheet turned aside, remove Extension Spring, 0.262 from the tabs of Mount Assy., Plate, Motor, ASF, SP and Lever, Lock, DE. (Refer to Figure 4-156.) 8. Pull the Lever, Lock, Planetary toward the outside of the printer, release the hook on top and then pull out of the Lever, Lock, DE. (Refer to Figure 4-157.)Figure 4-156. Extension Spring, 0.262 Removal Figure 4-157. Lever, Lock, Planetary Removal When performing the following steps, be careful of the points below. „Do not lose Extension Spring, 0.262. „Use care not to pull Extension Spring, 0.262 too much, or it may loose the spring force. „Do not touch the Cleaner, Head or allow it to contact other parts. (This could lower print quality due to not wiping ink normally.)After installing the Lever, Lock, Planetary, confirm that Lever, Lock, DE moves smoothly by the tension of Extension Spring, 0.262. (Check three times.) Cleaner, Head Sheet Extension Spring, 0.262 Lever, Lock, DE Tads Lever, Lock, Planetary
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 319 9. Remove the Lever, Lock, DE by following the steps below. (Refer to Figure 4-158.) 9-1. Slide it to the right. 9-2. Bend it toward the center. 9-3. Remove the left end from the installation hole. 9-4. Remove Lever, Lock, DE while extracting the flag at the right end from the hole in the frame. Figure 4-158. Lever, Lock, DE Removal Installation Hole Step 9-1 Step 9-3 Step 9-2 Flag Step 9-4
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 320 10. Disconnect the connector from the Pump Phase Sensor from behind the printer. (Refer to Figure 4-159.) 11. Free all the harnesses from the U-shaped notch of the Frame, Base, Side, Right. (Refer to Figure 4-159.) 12. Remove the four screws securing the Pump Unit. (Refer to Figure 4-160.) „C.B.S. 3x6: 3 pcs. „C.B.S. 3x8: 1 pc. 13. Shift the Pump Unit to the right side and disconnect the linkage with Combination Gear, 13.6, 28.8. (Refer to Figure 4-161.) 14. Remove Pump Unit toward rear. (Refer to Figure 4-161.) Figure 4-159. Disconnecting the Pump Phase Sensor ConnectorFigure 4-160. Screws Securing Pump Unit Figure 4-161. Pump Unit Removal Connector Releasing Harnesses Pump Unit C.B.S. 3x8 C.B.S. 3x6 Linkage Location Combination Gear, 13.6, 28.8