    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 2914.2.8.2  Valve Assy., Head1. Remove the Carriage Cover.
    (Refer to 4.2.4.3 C593_SUB Board (p234).)
    2. Loosen the eight Coupling Screw, M7s that secure the Tube, Supply, 
    Ink to remove the Tube, Supply, Ink from the Head Unit.Figure 4-115. Tube, Supply, Ink Removal
    
    
    
    
    When performing the following work, remove ink out of the 
    ink route before removing the Valve Assy., Head. Refer to 
    Chapter 5 “Adjustment” (p.366) to know how to remove ink.
    
    When performing the following steps, pay attention to the 
    followings:
    „Prepare pieces of cloth in case the ink leaks or spatters 
    around the printer.
    „Do not allow dust or foreign matters to get into the 
    Tube, Supply, Ink.
    „Do not bend the Tube, Supply, Ink or damage it with 
    frame edges.
    Coupling Screw, M7Tube, Supply, Ink
    Head Unit 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 292
    „Make sure that the O-ring, Coupling M7 is attached 
    approximately 2mm away from the end point of the 
    Tube, Supply, Ink.
    „The ink color marked on the Tube, Supply, Ink 
    indicates its own color. Make sure that the marked color 
    corresponds to the color of the socket before attaching 
    the Tube, Supply, Ink.
    „Attach the Tube, supply, Ink from the left in the order 
    below and route it, referring to the figure below.
    LK (Y) 
    → LM (M) 
    → LC (C) 
    → PK (MK) 
    → MK 
    → C →
     M 
    → 
    Y 
    „Insert the Tube, Supply, Ink all the way seated, then 
    tighten the Coupling Screw, M7.
    Approximately 2mm
    O-ring, coupling M7
    LK (Y)
    LM (M)
    LC (C)
    PK (MK)
    MK
    C
    M
    Y
    M
    „To prevent from both ink leak and damage on the joint 
    screw, be sure to tighten the Coupling Screw, M7 with 
    prescribed torgue and the tool sperified below.
    •Tool: Torque Wrench 1.25/1.75 (1277142)
    •Tightning torque: 1.25 ( ± 0.25) kgf • cm 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 293 3. Remove the Head Unit from the Carriage Unit.
    (Refer to 4.2.7.1 Carriage Unit (p266).)
    4. Separate the Carriage, C from the Carriage, B.
    (Refer to 4.2.8.1 Printhead (p285).)
    5. Draw out the Plate, Damper with a plier or a similar tool.
    (Refer to Figure 4-116.)
    6. Remove the Valve Assy., Head by following the steps below.
    (Refer to Figure 4-117.)
    6-1. Slide the joint section on the Valve Assy., Head, which connects 
    Tube, Supply, Ink, to remove the joint section.
    6-2. Release the tab and remove the Valve Assy., Head in the 
    direction of an allow.Figure 4-116. Plate, Damper Drawing
    Figure 4-117. Valve Assy., Head Removal
    When performing the following work, pay attention to the 
    followings:
    „Do not hold the film area of the Valve Assy., Head.
    „Do not damage or deform the joint section on the Valve 
    Assy., Head which connects the Tube, Supply, Ink.
    
    
    
    
    
    Be sure to refer to Chapter 5 “Adjustment” (p.366) and 
    perform specified adjustments after replacing or removing 
    the Valve Assy., Head.
    Plate, Damper1
    Joint Section
    1
    2
    Tab
    Valve Assy., Head
    Film Area 
    (both sides) 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 2944.2.8.3  Gutter, Ink1.Remove Fan, Blower (p244).
    2. Remove the two screws securing Duct, Air, D and remove Duct, Air, D. 
    (Refer to Figure 4-118.)
    „C.B.S. (P2) 3x6: 2 pcs.
    3. Remove the two screws securing Duct, Air, A and remove Duct, Air, A. 
    (Refer to Figure 4-119.)
    „C.B.S. (P2) 3x6: 2 pcs.
    4. Remove the screw securing Gutter, Waste Ink. (Refer to Figure 4-119.)
    „C.B.S. (P2) 3x6: 1 pc.
    5. Slide the Gutter, Waste Ink to the left, move it downward and then 
    remove it to the left side. (Refer to Figure 4-119.)Figure 4-118. Duct, Air, D Removal
    Figure 4-119. Duct, Air, A and Gutter, Waste Ink Removal
    When removing the Gutter, Ink, prepare pieces of cloth in 
    case the waste ink leaks or splatter inside the printer. Make 
    sure that the ink is not ejected from the ink ejection route 
    during the work.„Insert the shaft of the Duct, Air, D into the bearing hole 
    of Gutter, Ink to position the Duct, Air, D.
    „Secure with screws after confirming that Gutter, Waste 
    Ink is closely fitted to the printer frame.
    Duct, Air, D
    Step 2Duct, Air, A
    Gutter, Waste Ink
    Step 5
    Step 4
    Step 3
    Closely Fitted Location 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 295 6. Remove the screw securing Gutter, Ink.
     (Refer to Figure 4-120.)
    „C.B. (P1) 3x4: 1 pc.
    7. Remove Gutter, Ink by following the steps below. (Refer to Figure 4-121.)
    7-1. Slide Gutter, Ink to left side.
    7-2. Move Gutter, Ink right side downward.
    7-3. Pull out Gutter, Ink left lower side toward you.
    Figure 4-120. Screw Securing Gutter, Ink
    Figure 4-121. Gutter, Ink Removal
    Make sure that Push Spring, Absorbent Pad, Gutter is 
    attached to Gutter, Ink. If it has removed, install it as 
    shown in the figure below.
    Push Spring, Absorbent Pad, Gutter
    Assembly Catch
    Assembly Catch
    Gutter, Ink
    C.B. (P1) 3x41
    2
    3 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 2964.2.8.4  I/H Left Unit / I/H Lever Sensor (Left)1.Remove Panel, Front/Panel Unit (p219).
    2. Open Cover, I/H, Left.
    3. Hold both ends of Cover, I/H, Left and disengage each side from the 
    hinge sockets. (Refer to Figure 4-122.)
    4. Remove the screw securing the I/C, Lock Lever, Knob, Left and then 
    remove the I/C, Lock Lever, Knob, Left. 
    (Refer to Figure 4-123.)
    „C.B.P. 3x6: 1 pc.
    Figure 4-122. Cover, I/H, Left Removal
    Figure 4-123. I/C, Lock Lever, Knob, Left Removal
    When performing the following work, remove ink out of the 
    the ink path before removing the IH Left Unit. Refer to 
    Chapter 5 “Adjustment” (p.366) to know how to remove ink.The I/C, Lock Lever, Knob, Left has upward and downward 
    directions. Install it in the correct direction.
    Release Mark: TopSet Mark: Bottom
    Hinge Sockets
    I/C, Lock Lever, Knob, Left
    C.B.P. 3x6 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 297 5. Remove the four screws securing Guide, I/H, Left and remove Guide, I/
    H, Left by pulling forward. (Refer to Figure 4-124.)
    „C.B.S. 3x6: 4 pcs.
    6. Remove the screw securing Installation Plate, I/H Guide, A and remove 
    Installation Plate, I/H Guide, A. 
    (Refer to Figure 4-125.)
    „C.B.S. 3x6: 1pc.
    Figure 4-124. Guide, I/H, Left Removal
    Figure 4-125. Installation Plate, I/H Guide, A Removal
    Guide, I/H, Left
    C.B.S. 3x6
    C.B.S. 3x6
    Installation Plate, I/H Guide, A
    Dowels and Positioning Holes
    C.B.S. 3x6 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 298 7. Remove the screw securing Installation Plate, I/H Guide, C and remove 
    Installation Plate, I/H Guide, C.
    „C.B.S. 3x6: 1 pc.
    Figure 4-126. Installation Plate, I/H Guide, C Removal
    „The shapes of Installation Plate, I/H Guide, A and 
    Installation Plate, I/H Guide, C differ, so be careful 
    when installing them.
    „Align Installation Plate, I/H Guide, A and Installation 
    Plate, I/H Guide, C dowels (2 each) with frame 
    positioning holes (2 each).
    (Refer to Figure 4-125 and  4-126.)
    Installation Plate, I/H Guide, A
    Installation Plate, I/H Guide, C
    Installation Plate, I/H Guide, C
    Dowels and Positioning Holes
    C.B.S. 3x6 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 299 8. Peel acetate tape and release the four Tube, Supply, Ink from the notch 
    of the frame. (Refer to Figure 4-127.)
    9. Remove the two screws securing the front side of I/H Left Unit.
    (Refer to Figure 4-128.)
    „C.B.S. 3x6: 2 pcs.Figure 4-127. Releasing the Tube, Supply, Ink
    Figure 4-128. I/H Left Unit Front Side_1
    When performing the following step, be careful not to bend 
    the Tube, Supply, Ink or scratch it with the edge of the 
    frame.
    
    The width of the frame notch allows passage of one tube at a 
    time. Be sure to release each tube in order.„When installing “Tube, Supply, Ink” to the frame, secure 
    it with acetate tape.
    „The Tube, Supply, Ink should be slackened to the 
    direction (center of the printer) as shown in Figure 4-127.
    „For the 4-color model, place all the eight “Tube, Supply, 
    Ink in the notch on the left frame, and secure them with 
    acetate tape.
    Acetate Tape
    Tube, Supply, Ink
    Notch
    Slack Direction
    I/H Left Unit
    C.B.S. 3x6 
    						
    							EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 300 10. Remove the six screws securing the I/H Left Unit to the pinter.
    „C.B.S. 3x8: 6 pcs.
    11. Disconnect the FFCs from the CN1 to CN3 connectors on the “C593_SUB-
    D Board”, and pull out the FFCs toward the left side of the printer frame.
    12. Peel off the acetate tape that secures the front side of the I/H Left Unit.
    13. Remove the four screws securing rear side of I/H Left Unit.
    (Refer to Figure 4-130.)
    „C.B.S. 3x6: 4 pcs.
    Figure 4-129. I/H Left Unit Front Side_2
    Figure 4-130. Screws Securing Rear Side of I/H Left Unit
    Harnesses are routed through the area of screws as shown 
    by the arrows in Figure 4-130.
    When installing the unit, install it without pinching 
    harnesses by the screw after removing the Cover, Motor, 
    PF. Refer to 4.2.6.4 ASF Phase Sensor (p263). 
    Step 12
    Acetate TapeC.B.S. 3x8
    C.B.S. 3x6
    Cover, Motor, PF 
    						
    All Epson manuals Comments (17)