Epson 4880 C Service Manual
Have a look at the manual Epson 4880 C Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1734 Epson manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 2914.2.8.2 Valve Assy., Head1. Remove the Carriage Cover. (Refer to 4.2.4.3 C593_SUB Board (p234).) 2. Loosen the eight Coupling Screw, M7s that secure the Tube, Supply, Ink to remove the Tube, Supply, Ink from the Head Unit.Figure 4-115. Tube, Supply, Ink Removal When performing the following work, remove ink out of the ink route before removing the Valve Assy., Head. Refer to Chapter 5 “Adjustment” (p.366) to know how to remove ink. When performing the following steps, pay attention to the followings: „Prepare pieces of cloth in case the ink leaks or spatters around the printer. „Do not allow dust or foreign matters to get into the Tube, Supply, Ink. „Do not bend the Tube, Supply, Ink or damage it with frame edges. Coupling Screw, M7Tube, Supply, Ink Head Unit
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 292 „Make sure that the O-ring, Coupling M7 is attached approximately 2mm away from the end point of the Tube, Supply, Ink. „The ink color marked on the Tube, Supply, Ink indicates its own color. Make sure that the marked color corresponds to the color of the socket before attaching the Tube, Supply, Ink. „Attach the Tube, supply, Ink from the left in the order below and route it, referring to the figure below. LK (Y) → LM (M) → LC (C) → PK (MK) → MK → C → M → Y „Insert the Tube, Supply, Ink all the way seated, then tighten the Coupling Screw, M7. Approximately 2mm O-ring, coupling M7 LK (Y) LM (M) LC (C) PK (MK) MK C M Y M „To prevent from both ink leak and damage on the joint screw, be sure to tighten the Coupling Screw, M7 with prescribed torgue and the tool sperified below. •Tool: Torque Wrench 1.25/1.75 (1277142) •Tightning torque: 1.25 ( ± 0.25) kgf • cm
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 293 3. Remove the Head Unit from the Carriage Unit. (Refer to 4.2.7.1 Carriage Unit (p266).) 4. Separate the Carriage, C from the Carriage, B. (Refer to 4.2.8.1 Printhead (p285).) 5. Draw out the Plate, Damper with a plier or a similar tool. (Refer to Figure 4-116.) 6. Remove the Valve Assy., Head by following the steps below. (Refer to Figure 4-117.) 6-1. Slide the joint section on the Valve Assy., Head, which connects Tube, Supply, Ink, to remove the joint section. 6-2. Release the tab and remove the Valve Assy., Head in the direction of an allow.Figure 4-116. Plate, Damper Drawing Figure 4-117. Valve Assy., Head Removal When performing the following work, pay attention to the followings: „Do not hold the film area of the Valve Assy., Head. „Do not damage or deform the joint section on the Valve Assy., Head which connects the Tube, Supply, Ink. Be sure to refer to Chapter 5 “Adjustment” (p.366) and perform specified adjustments after replacing or removing the Valve Assy., Head. Plate, Damper1 Joint Section 1 2 Tab Valve Assy., Head Film Area (both sides)
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 2944.2.8.3 Gutter, Ink1.Remove Fan, Blower (p244). 2. Remove the two screws securing Duct, Air, D and remove Duct, Air, D. (Refer to Figure 4-118.) „C.B.S. (P2) 3x6: 2 pcs. 3. Remove the two screws securing Duct, Air, A and remove Duct, Air, A. (Refer to Figure 4-119.) „C.B.S. (P2) 3x6: 2 pcs. 4. Remove the screw securing Gutter, Waste Ink. (Refer to Figure 4-119.) „C.B.S. (P2) 3x6: 1 pc. 5. Slide the Gutter, Waste Ink to the left, move it downward and then remove it to the left side. (Refer to Figure 4-119.)Figure 4-118. Duct, Air, D Removal Figure 4-119. Duct, Air, A and Gutter, Waste Ink Removal When removing the Gutter, Ink, prepare pieces of cloth in case the waste ink leaks or splatter inside the printer. Make sure that the ink is not ejected from the ink ejection route during the work.„Insert the shaft of the Duct, Air, D into the bearing hole of Gutter, Ink to position the Duct, Air, D. „Secure with screws after confirming that Gutter, Waste Ink is closely fitted to the printer frame. Duct, Air, D Step 2Duct, Air, A Gutter, Waste Ink Step 5 Step 4 Step 3 Closely Fitted Location
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 295 6. Remove the screw securing Gutter, Ink. (Refer to Figure 4-120.) „C.B. (P1) 3x4: 1 pc. 7. Remove Gutter, Ink by following the steps below. (Refer to Figure 4-121.) 7-1. Slide Gutter, Ink to left side. 7-2. Move Gutter, Ink right side downward. 7-3. Pull out Gutter, Ink left lower side toward you. Figure 4-120. Screw Securing Gutter, Ink Figure 4-121. Gutter, Ink Removal Make sure that Push Spring, Absorbent Pad, Gutter is attached to Gutter, Ink. If it has removed, install it as shown in the figure below. Push Spring, Absorbent Pad, Gutter Assembly Catch Assembly Catch Gutter, Ink C.B. (P1) 3x41 2 3
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 2964.2.8.4 I/H Left Unit / I/H Lever Sensor (Left)1.Remove Panel, Front/Panel Unit (p219). 2. Open Cover, I/H, Left. 3. Hold both ends of Cover, I/H, Left and disengage each side from the hinge sockets. (Refer to Figure 4-122.) 4. Remove the screw securing the I/C, Lock Lever, Knob, Left and then remove the I/C, Lock Lever, Knob, Left. (Refer to Figure 4-123.) „C.B.P. 3x6: 1 pc. Figure 4-122. Cover, I/H, Left Removal Figure 4-123. I/C, Lock Lever, Knob, Left Removal When performing the following work, remove ink out of the the ink path before removing the IH Left Unit. Refer to Chapter 5 “Adjustment” (p.366) to know how to remove ink.The I/C, Lock Lever, Knob, Left has upward and downward directions. Install it in the correct direction. Release Mark: TopSet Mark: Bottom Hinge Sockets I/C, Lock Lever, Knob, Left C.B.P. 3x6
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 297 5. Remove the four screws securing Guide, I/H, Left and remove Guide, I/ H, Left by pulling forward. (Refer to Figure 4-124.) „C.B.S. 3x6: 4 pcs. 6. Remove the screw securing Installation Plate, I/H Guide, A and remove Installation Plate, I/H Guide, A. (Refer to Figure 4-125.) „C.B.S. 3x6: 1pc. Figure 4-124. Guide, I/H, Left Removal Figure 4-125. Installation Plate, I/H Guide, A Removal Guide, I/H, Left C.B.S. 3x6 C.B.S. 3x6 Installation Plate, I/H Guide, A Dowels and Positioning Holes C.B.S. 3x6
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 298 7. Remove the screw securing Installation Plate, I/H Guide, C and remove Installation Plate, I/H Guide, C. „C.B.S. 3x6: 1 pc. Figure 4-126. Installation Plate, I/H Guide, C Removal „The shapes of Installation Plate, I/H Guide, A and Installation Plate, I/H Guide, C differ, so be careful when installing them. „Align Installation Plate, I/H Guide, A and Installation Plate, I/H Guide, C dowels (2 each) with frame positioning holes (2 each). (Refer to Figure 4-125 and 4-126.) Installation Plate, I/H Guide, A Installation Plate, I/H Guide, C Installation Plate, I/H Guide, C Dowels and Positioning Holes C.B.S. 3x6
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 299 8. Peel acetate tape and release the four Tube, Supply, Ink from the notch of the frame. (Refer to Figure 4-127.) 9. Remove the two screws securing the front side of I/H Left Unit. (Refer to Figure 4-128.) „C.B.S. 3x6: 2 pcs.Figure 4-127. Releasing the Tube, Supply, Ink Figure 4-128. I/H Left Unit Front Side_1 When performing the following step, be careful not to bend the Tube, Supply, Ink or scratch it with the edge of the frame. The width of the frame notch allows passage of one tube at a time. Be sure to release each tube in order.„When installing “Tube, Supply, Ink” to the frame, secure it with acetate tape. „The Tube, Supply, Ink should be slackened to the direction (center of the printer) as shown in Figure 4-127. „For the 4-color model, place all the eight “Tube, Supply, Ink in the notch on the left frame, and secure them with acetate tape. Acetate Tape Tube, Supply, Ink Notch Slack Direction I/H Left Unit C.B.S. 3x6
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 300 10. Remove the six screws securing the I/H Left Unit to the pinter. „C.B.S. 3x8: 6 pcs. 11. Disconnect the FFCs from the CN1 to CN3 connectors on the “C593_SUB- D Board”, and pull out the FFCs toward the left side of the printer frame. 12. Peel off the acetate tape that secures the front side of the I/H Left Unit. 13. Remove the four screws securing rear side of I/H Left Unit. (Refer to Figure 4-130.) „C.B.S. 3x6: 4 pcs. Figure 4-129. I/H Left Unit Front Side_2 Figure 4-130. Screws Securing Rear Side of I/H Left Unit Harnesses are routed through the area of screws as shown by the arrows in Figure 4-130. When installing the unit, install it without pinching harnesses by the screw after removing the Cover, Motor, PF. Refer to 4.2.6.4 ASF Phase Sensor (p263). Step 12 Acetate TapeC.B.S. 3x8 C.B.S. 3x6 Cover, Motor, PF