Epson 4880 C Service Manual
Have a look at the manual Epson 4880 C Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1734 Epson manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 231 11. Release the four hooks securing the Guide Rail and remove the Guide Rail. (Refer to Figure 4-36.) 12. Remove the two screws securing the Bracket and remove the Bracket.(Refer to Figure 4-37.) „C.B.S. 3x8: 2 pcs.Figure 4-36. Guide Rail Removal Figure 4-37. Bracket Removal Secure the two Guide Rail hooks to the two C593 MAIN Board installation holes.Install while aligning the two Bracket dowels with the two C593 MAIN Board positioning holes. Hooks Installation Holes Dowels Positioning Holes 1 2 3 Guide Rail C.B.S 3x8 Bracket
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 232 13. Remove the seven screws securing C593 MAIN Board. „C.B.S. 3x8: 8 pcs. 14. Slide C593 MAIN Board forward and remove the C593 MAIN Board as keeping IEEE1394 connector clear of the plate. Figure 4-38. C593 MAIN Board Removal „Do not place the circuit board (solder side) directly on a conductive surface. „Circuit boards supplied as service parts have been equipped with lithium battery. Do not place the circuit board (solder side) directly on a conductive surface or let conductive material come in contact with the circuit. To do so may cause short out. Be sure to refer to Chapter 5 “Adjustment” (p.366) and perform specified adjustments after replacing the C593 MAIN Board. C.B.S. 3x8 C.B.S. 3x8 IEEE1394 Connector
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 2334.2.4.2 Power Supply Board / Power Supply Cooling Fan1. Remove the PCB Unit.(Refer to 4.2.4.1 C593 MAIN Board (p226).) 2. Disconnect the following connectors/harnesses from the Power Supply Board. 3. Disconnect the connectors of the “Power Supply Cooling Fan” from the “C593 MAIN Board”. (Refer to 4.2.4.1 C593 MAIN Board (p226).) 4. Remove the two screws that secure the Power Supply Cooling Fan, and remove the Power Supply Cooling Fan. „C.B.S. 3x18: 2 pcs. 5. Remove the five screws securing the Power Supply Board and remove the Power Supply Board. „C.B.S. 3x8: 5 pcs.Figure 4-39. Power Supply Cooling Fan Removal Figure 4-40. Power Supply Board Removal When removing the Power Supply Board, wait 5 minutes after unplugging the AC power cord before starting work to allow discharge of residual charge in the electrolytic capacitors. For your safety, never touch the primary smoothing capacitor (C6). Do not place the Power Supply Board (solder side) directly on a conductive surface. Table 4-5. Connectors Connected to Power Supply Board Connector No. Color Number of Pins Connection Socket CN1 White 2 AC Inlet CN2 White 14 C593 MAIN Board (CN1) C.B.S. 3x18 C.B.S. 3x8 C.B.S. 3x8 Connectors
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 2344.2.4.3 C593_SUB Board1. Open Cover, Printer. 2. Release the carriage lock and move the Carriage Unit to the position shown in Figure 4-41. (Refer to 4.2.1.2 Carriage Unit Lock Release/Lock Set Method (p208).) 3. Remove the three screws securing the Carriage Cover and remove the Carriage Cover upward. (Refer to Figure 4-42.) „C.B.P. 3x8: 3 pc.Figure 4-41. Moving the Carriage Unit Figure 4-42. Carriage Cover Removal When performing the following steps, remove protective equipment if it is installed and make sure to release the Carridge Unit lock with the Transport Retaining Lever. Refer to 4.2.1.1 Release of the Transport Retaining Lever (p207). Slot Carriage Unit C.B.P. 3x8 C.B.P. 3x8Carriage Cover
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 235 4. Disconnect all connectors/harnesses on the C593_SUB Board. (Refer to Figure 4-43.) 5. Remove the screw securing C593_SUB Board and then remove C593_SUB Board. (Refer to Figure 4-43.) „C.B.P. 3x8: 1 pc. Figure 4-43. C593_SUB Board Removal Table 4-6. Connectors/Harnesses Connected to C593_SUB Board Connector No. Color Number of Pins Connection Socket CN1 - 30 C593_SUB-D Board (CN4) CN2 White 2 Cutter Solenoid CN3 White 5 Multi Sensor CN4 - 5 CR Encoder Board Be sure to fasten both the grounding plate and the C593_SUB Board together with screws. Grounding Plate C.B.S. 3x8 C593_SUB Board Harnesses Connector Connector
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 2364.2.4.4 C511_SUB-B Board1.Remove Cover, Side, Right (p217). 2. Disconnect all connectors/harnesses on the C511_SUB-B Board.Note 1: CN100, CN101 have connector lock mechanisms that must be released to disconnect FFC. Refer to “Check Point“ on Release the harness lock as shown in the figure below. Be sure to lock it when reassembling. P.236. 2: Refer to Figure 4-44 for connector positions. 3: When connecting harnesses to the C511_SUB-B Board, connect them in the order shown in Table 4-7. 4: For the 4-color model, the CN39, CN42, CN43, CN45, and CN36 connectors are not used. Figure 4-44. C511_SUB-B Board Connector Positions Table 4-7. Connectors/Harnesses Connected to C511_SUB-B Board Connection Order Connector No. Color/ Mark Number of Pins Connection Socket 1 CN103 - 17 Panel Unit (CN1) 2 CN46 - 7 Porous Pad Assy., Ink Eject 3 CN39 LK 7 CSIC_R1 Board (Light Black) 4 CN42 LC 7 CSIC_R2 Board (Light Cyan) 5 CN43 LM 7 CSIC_R3 Board (Light Magenta) 6 CN45 LLK 7 CSIC_R4 Board (Light Light Black) 7 CN22 Blue 2 P-Cover Open Sensor 8 CN36 White 2 I/H Lever Sensor (Right) 9 CN26 Black 2 Paper Eject Release Sensor 10 CN25 Red 2 ASF Paper Sensor 11 CN27 Yellow 2 Rear Hand Insertion Sensor 12 CN29 - 3 PE Sensor 13 CN31 Yellow 3 HP Sensor 14 CN33 White 3 P_THICK Sensor (0.3) 15 CN34 Black 3 P_THICK Sensor (0.8) 16 CN55 Blue 3 Pump Phase Sensor 17 CN102 - 17 C593 MAIN Board (CN48) 18 CN100 - 30 C593 MAIN Board (CN54) 19 CN101 - 30 C593 MAIN Board (CN51) Release the harness lock as shown in the figure below. Be sure to lock it when reassembling.Each Harness, CSIC (CN39, CN42, CN43, CN45) is marked with its corresponding ink name. Refer to Table 4-7 and connect the harnesses properly. CN36CN34CN31CN29CN33CN26 CN22 CN55 CN27 CN39 CN42 CN103 CN102 CN45 CN43 CN46 CN101CN100CN25 Ink Names
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 237 3. Remove the four screws securing C511_SUB-B Board and remove C511_SUB-B Board. „C.B.P. 3x6: 4 pcs. Figure 4-45. C511_SUB-B Board Removal C.B.P. 3x6
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 2384.2.4.5 C593_SUB-C Board1.Remove Cover, Side, Left (p216). 2. Release the FFC from the three clamps. 3. Disconnect all connectors/harnesses on the C593_SUB-C Board.Note 1: Refer to Figure 4-47 for connector positions.The CN 45 is not used. 2: When connecting harnesses to the C593_SUB-C Board, connect them in the order shown in Table 4-8. Figure 4-46. Releasing FFC Figure 4-47. C593_SUB-C Board Connector Locations Table 4-8. Connectors/Harnesses Connected to C593_SUB-C Board Connection Order Connector No. Color/ Mark Number of Pins Connection Socket 1 CN38 MB 7 CSIC_L1 Board (Matte Black) 2 CN40 C 7 CSIC_L2 Board (Cyan) 3 CN41 M 7 CSIC_L3 Board (Magenta) 4 CN44 Y 7 CSIC_L4 Board (Yellow) 5 CN201 - 28 C593 MAIN Board (CN53) 6 CN200 - 15 C593 MAIN Board (CN52) 7 CN24 White 4 PF Linear Encoder Sensor 8 CN37 Black 2 I/H Lever Sensor (Left) 9 CN30 Yellow 3 ASF Phase Sensor 10 CN28 White 2 Paper Eject Phase Sensor 11 CN32 Red 3 PG Phase Sensor Each Harness, CSIC (CN38, CN40, CN41, CN44) is marked with its corresponding ink name. Refer to Table 4-8 and connect the harnesses properly. Ink Names Clamps FFC CN45CN24CN37 CN28CN200CN201CN30CN44 CN41 CN40 CN38 CN32
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 239 4. Remove the three screws securing C593_SUB-C Board and remove C593_SUB-C Board. „C.B.S. 3x6: 3 pcs. Figure 4-48. SUB-C Board Removal C.B.S. 3x6
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 2404.2.4.6 C593_SUB-D Board1.Remove Panel, Front/Panel Unit (p219). 2. Disconnect all the connectors/harnesses on the C593_SUB-D Board.Note 1: Refer to Figure 4-47 for connector positions.The CN 45 is not used. 2: When connecting harnesses to the C593_SUB-D Board, connect them in the order shown in Table 4-9.3. Remove the four screws securing C593_SUB-D Board and remove C593_SUB-D Board. „C.B.P. 3x6: 4 pcs.Figure 4-49. C593_SUB-D Board Connector Positions Figure 4-50. C593_SUB-D Board Removal Table 4-9. Connectors/Harnesses Connected to C593_SUB-D BoardConnection Order Connector No. Color/ Mark Number of Pins Connection Socket 1 CN1 - 31 C593 MAIN Board (CN7) 2 CN2 - 31 C593 MAIN Board (CN8) 3 CN3 - 30 C593 MAIN Board (CN9) 4 CN4 - 30 C593 SUB Board (CN1) 5 CN5 - 31 Print Head Board (CN1) 6 CN6 - 31 Print Head Board (CN2) Each Harness, Head, Intermit and Harness, Head is marked with its connector No. Refer to Table 4-9 and connect the harnesses properly. Connector Numbers CN3 CN1 CN6 CN4CN5 CN2 C.B.S. 3x6