Cisco 6500e Manual
Here you can view all the pages of manual Cisco 6500e Manual. The Cisco manuals for Ethernet Switch are available online for free. You can easily download all the documents as PDF.
Page 191
1-69 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Attaching the Interface Cables To install a copper SFP transceiver, follow these steps: Step 1Attach an ESD-preventive wrist strap to your wrist and to the ESD ground connector on the chassis or to a properly grounded bare metal surface. CautionTo avoid ESD damage, handle the SFP by its sides; do not touch the connector pins. Step 2Remove the new copper SFP from its protective packaging. Step 3Check...
Page 192
1-70 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Attaching the Interface Cables Figure 1-39 Installing the Copper SFP Transceiver Step 6 Connect the network interface cable RJ-45 plug to the SFP RJ-45 connector. Step 7Observe the port status LED: The LED turns green when the SFP transceiver and the target device have an established link. The LED turns amber while the port discovers the network topology and searches for loops. This process takes...
Page 193
1-71 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Attaching the Interface Cables To install and cable a XENPAK transceiver uplink port, follow these steps: Step 1Attach an ESD-preventive wrist strap to your wrist and to the ESD ground connector or to a properly grounded bare metal surface. Step 2Loosen the two screws that secure the uplink port cover plate to the supervisor engine faceplate and remove the cover plate. Save the cover plate for future...
Page 194
1-72 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Attaching the Interface Cables Step 7Tighten the two captive installation screws to secure the XENPAK transceiver in the socket. Avoid cross-threading or overtightening the captive screws. NoteFor optical XENPAK transceivers, before removing the dust plugs and making any optical connections, observe the following guidelines: Always keep the protective dust plugs on the unplugged fiber-optic cable...
Page 195
1-73 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Attaching the Interface Cables Figure 1-42 Cabling a CX4 (Copper) XENPAK Transceiver Installing and Cabling 10GBASE-X X2 Transceiver Uplink Ports The 10-Gigabit X2 transceiver can have either a spring-loaded latch sleeve or a latch sleeve that is not spring loaded. Both transceiver types are functionally identical. CautionThe X2 transceiver is a static-sensitive device. Always use an ESD wrist strap...
Page 196
1-74 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Attaching the Interface Cables Step 4To install the X2 transceiver, do the following: a.Insert the X2 transceiver into the transceiver socket on the supervisor engine faceplate. (See Figure 1-43, top view.) Continue sliding the X2 transceiver into the socket until the X2 transceiver EMI gasket is flush against the system module faceplate. The X2 transceiver connector is now mated to the socket...
Page 197
1-75 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Attaching the Interface Cables Step 5If you are cabling an optical X2 transceiver, perform the following substeps. If you are cabling a CX4 X2 transceiver, go to Step 6. NoteBefore removing the dust plugs and making any optical connections, observe the following guidelines: Always keep the protective dust plugs on the unplugged fiber-optic cable connectors and the transceiver optical bores until you...
Page 198
1-76 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Attaching the Interface Cables Step 6Plug the InfiniBand cable connector into the CX4 X2 transceiver connector. (See Figure 1-45.) Make sure that the InfiniBand cable connector is aligned with the X2 transceiver. Figure 1-45 Cabling a CX4 (Copper) 10-Gigabit X2 Transceiver Step 7 Carefully route the InfiniBand network cable through the cable management brackets on your system. Figure 1-46 shows how...
Page 199
1-77 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Attaching the Interface Cables Figure 1-46 InfiniBand Cable Support 140034 CX4 X2 moduleHorizontal cable management bracket Vertical cable management bracket 4X InfiniBand connector InfiniBand network cable OR
Page 200
1-78 Catalyst 6500 Series Switches Installation Guide OL-5781-08 Chapter 1 Installing the Switch Attaching the Interface Cables Using the Catalyst 6509-V-E Cable Management System The optional cable management system on the Catalyst 6509-V-E switch chassis has the capacity to hold several hundred Catagory 5, 6, or 6a copper network interface cables or fiber-optic network interface cables. In order to maximize the capacity of this cable management system, observe the following guidelines: In a...