Page 52
INSTALLATION Required Circuit Pack Positions The required CP positions for Cabinet 1 are: SLOTCP 1ZTN129 or ZTN130 (R3) I2IZTN85 or ZTN131 (R3) Also, all DID Trunk circuit packs should be installed in Cabinet 1. There are no other restrictions on CP position in a single-cabinet or multicabinet system; however, you should refer to the power supply unit load requirements for the maximum unit loads for each CP type within a single cabinet. Caution:Be careful not to exceed unit load restrictions on each...
Page 53
INSTALLATION Install 4A Retainer Clips The 4A retainer clips must be installed on each of the 12 receptacles on the lower rear panel of the cabinets.To install a clip, position it and insert the legs in the cabinet as shown in Figure 2-12. Figure 2-12.4A Retainer Clip Installation 2-29
Page 54
INSTALLATION Connect Cabinets The Time Division Multiplex (TDM) bus extender cable and the intercabinet #6 AWG ground wire must be connected between cabinets. The TDM bus terminates on each side of the cabinet, and the intercabinet #6 AWG ground wire connects to the ground block at the rear of each cabinet. Note:Make certain that the address plug is installed in the rear pin field of each cabinet (see Figure 2-13). TDM Bus Connections One end of the TDM bus is terminated by resistors mounted on the...
Page 55
INSTALLATION side up). 3.Install the upper rear panels.Route the extender cable between the slots formed by the upper and lower rear panels. 2-31
Page 56
INSTALLATION TDM BUS TERM CARD ADDR PLUG TDM B EXTEN CABLE ADD PLU PLUG Figure ~CABINET 3 ON/OFF .SWITCH AC POWER # 6 AWG BUILDING GROUND WIRE CABINET 2 AC POWER . #6 AWG 2-13.TDM Bus Terminations (Rear View of 3-Cabinet System) 2-32
Page 57
INSTALLATION Ground Wire Connections The cabinets are connected to the single-point ground with #6 AWG copper wires. (Building ground requirements aredescribed in Preinstallation Requirements in this section.) Warning:The cabinet power switches must be set to off. 1.In 2- or 3-cabinet systems, connect a #6 AWG wire between the ground blocks of Cabinets 1 and 2 and Cabinets 1 and 3. 2. Connect a #6 AWG wire between the ground block of Cabinet 1 and the single-point ground. (See Figures 2-9 and 2-1 3.)...
Page 58
INSTALLATION 5.Starting with Cabinet 2 or 3, turn on the power switch on each cabinet [Cabinet 1 must be last). IMPORTANT: If power to Cabinet 1 is not turned cold start initialization may not occur properly. 6.Check to be sure that the cabinet fans are rotating. Connect Administration Equipment on last, the Connect the SAT and DTU to their respective modular jacks on an 858A Adapter at the SIP. If the SIP has not yet been installed, connect an octopus cable to Cabinet 1, slot 1. Make temporary...
Page 59
INSTALLATION Cold Start the System To ensure that the system recognizes the current position of the CPs, you must cold start the system before beginning initialization. A cold start causes the system to check all slots for valid CP types and assign default translations to ail ports (except auxiliary trunk ports). A limited cold start is available. The limited cold start does not assign default translations to ports. The limited cold start is useful if the customer’s dial plan is significantly different...
Page 60
INSTALLATION 7. The system will respond with: Action= 8. Enter 20 for a cold start. The system will respond with: Save/Restore: Action=20 Data= 9. Enter D. The system will complete the word Data followed by the = sign. 10.Enter 1 for a cold start or 2 for a limited cold start. The system will respond with: Save/Restore: Action=20 Data=1 (or You are about to initiate a cold start . c to continue, any other key to abort 11.Enter c to initiate the cold start. Data=2) Typing errors can be erased by pressing...