INSTALLATION Cold and warm starts both display the same type of information on the SAT. This consists of a listing of the version of the firmware loaded in the CPU/Memory CP, followed by a configuration listing of all CPs recognized by the system. The CPU/Memory CP is not in the configuration listing; however, it is located in slot 1 of Cabinet 1. Table 2-C provides a listing of SAT messages cool or warm start. The displayed message is and port translations. that may be displayed during a a result of CP...
Page 62
INSTALLATION The SAT message for a cold or warm start appears after the system has performed all self-tests and reading of its configuration. Typical cold start SAT message is as follows. The example is for a 2-cabinet system. Typical Release 3 Version 3 Cold Start Message RESTART TS ROM pair 1:version 3.5 * FC ROM pair 1:version 3.13 l FC ROM pair 2:version 3.13’ FC ROM pair 3:version 3.13 * COLD START Default Password in Effect SLOT 1 2 3 4 5 6 7 8 9 10 11 12 CABINET 1 CABINET 2 CABINET 3 ZTN85 06...
Page 63
INSTALLATION Check Performance of Cabinet Components Each CP has three colored LEDs on the front panel that indicate whether it is functioning properly or not.When a cold start is performed, the system undergoes a series of self-tests and loads default translations. Upon initial power application, each CP tests itself. The red LED on the CP lights to indicate that the test is in progress. Once the CP passes its initial tests, the red LED goes off. Then, after the main processor recognizes the CP and can...
Page 64
INSTALLATION Table 2-D. Circuit Pack LED Status Indications Circuit Pack TypeLEDs if NormalLEDs if Failed Service Circuit (ZTN85Steady Green andSteady Red or or ZTN131 [R3])Flashing orAmber Off Steady Amber CPU/Memory (ZTN129Flashing GreenSteady Green or ZTN130 [R3]) or Off All OtherSteady GreenSteady Red (Amber Also lighted (see Note below) when CP in use) Note:The red and green LEDs can both be lighted at the same time. In normal operation, a lighted red LED indicates that an alarm has been recorded...
Page 65
INSTALLATION If all the CPs are operating properly, only the green LED on the CPU/Memory CP and the amber LED on the Service Circuit should be flashing. If any other CP has a no-lighted LED, the CP may need to be reseated. All port CPs green LED remains dark until at least one port on the CP has been translated. Except for the CPU/Memory CP and Service Circuit CPs, power can be left on while a CP is reseated. To reseat a CP, do the following: 1. 2. 3. 4. 5. 6. 7. See CAUTION. Make sure your hands are...
Page 66
INSTALLATION Figure 2-15.Typical System 25 Port Circuit Pack Report Problems Follow local procedures to report faulty or damaged equipment. 2-42November 1995
Page 67
INSTALLATION Initialize System Instructions for initializing the system(based on the completed implementationforms) are provided in the Administration Manual (555-540-500). Note:Before trunks using DS1 Signaling are administered, all link level parameters such as signaling and framing and all link level alarms must be cleared. If this is not possible, PBXs at each end will not work.If this condition exists, clear a maintenance busy condition that exists at each end. INSTALL CROSS-CONNECT EQUIPMENT Before...
Page 68
INSTALLATION Install TAE, 617A Panels, and Fanning Strips To install this equipment, proceed as follows: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. For each RJ21X, RJ2GX, and RJ48X 700A Jack 1/2-inch from the edge of switch cabinet(s). Mount the first 617A Panel. network interface, install one the backboard closest to the Position and mount the first 50A Fanning Strip next to the 617A Panel. The edges should overlap so that the same screws will go through the overlapping key slots in the 50A Fanning Strip and...
Page 69
INSTALLATION FIRST 108 ETUPLYWOOD BACKBOARD 1/2 ADDL 700A BLOCK ADDL ETUADDL 700A BLOCK ADDL 700A BLOCK ADDL 617A PANELADDL 617A PANELADDL 617A PANELADDL 617A PANELADDL 700A BLOCKADDL ETU 700A BLOCKADDL ETU700A BLOCK TO SWITCH CABINET D-RINGS AS REQD FIRST 617APANEL FIRST 50A FANNING STRIPFLOORFREE HANGING OCTOPUS CABLE WITH 65 FREE LENGTH Figure 2-16.SIP and TAE Backboard Layout 2-45
Page 70
INSTALLATION NOTE: GREATER THAN 48 FOR 5-PANEL ARRANGEMENT FIRST 108 ETU Figure 2-17.Alternate SIP and TAE Backboard Layout 2-46