Home > ATT > Communications System > ATT System 25 Installation And Maintenance Manual

ATT System 25 Installation And Maintenance Manual

Here you can view all the pages of manual ATT System 25 Installation And Maintenance Manual. The ATT manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 61

INSTALLATION
Cold and warm starts both display the same type of information on the SAT. This
consists of a listing of the version of the firmware loaded in the CPU/Memory
CP, followed by a configuration listing of all CPs recognized by the system. The
CPU/Memory CP is not in the configuration listing; however, it is located in slot 1
of Cabinet 1.
Table 2-C provides a listing of SAT messages
cool or warm start. The displayed message is
and port translations.
that may be displayed during a
a result of CP...

Page 62

INSTALLATION
The SAT message for a cold or warm start appears after the system has
performed all self-tests and reading of its configuration. Typical cold start SAT
message is as follows. The example is for a 2-cabinet system.
Typical Release 3 Version 3 Cold Start Message
RESTART
TS ROM pair
1:version 3.5 *
FC ROM pair
1:version 3.13 l
FC ROM pair
2:version 3.13’
FC ROM pair
3:version 3.13 *
COLD START
Default Password in Effect
SLOT
1
2
3
4
5
6
7
8
9
10
11
12
CABINET 1
CABINET 2 CABINET 3
ZTN85 06...

Page 63

INSTALLATION
Check Performance of Cabinet Components
Each CP has three colored LEDs on the front panel that indicate whether it is
functioning properly or not.When a cold start is performed, the system
undergoes a series of self-tests and loads default translations.
Upon initial power application, each CP tests itself. The red LED on the CP
lights to indicate that the test is in progress. Once the CP passes its initial
tests, the red LED goes off. Then, after the main processor recognizes the
CP and can...

Page 64

INSTALLATION
Table 2-D.
Circuit Pack LED Status Indications
Circuit Pack TypeLEDs if NormalLEDs if Failed
Service Circuit (ZTN85Steady Green andSteady Red or
or ZTN131 [R3])Flashing orAmber Off
Steady Amber
CPU/Memory (ZTN129Flashing GreenSteady Green
or ZTN130 [R3])
or Off
All OtherSteady GreenSteady Red
(Amber Also lighted
(see Note below)
when CP in use)
Note:The red and green LEDs can both be lighted at the same
time. In normal operation, a lighted red LED indicates that
an alarm has been recorded...

Page 65

INSTALLATION
If all the CPs are operating properly, only the green LED on the CPU/Memory CP
and the amber LED on the Service Circuit should be flashing. If any other CP
has a no-lighted LED, the CP may need to be reseated. All port CPs green LED
remains dark until at least one port on the CP has been translated.
Except for the CPU/Memory CP and Service Circuit CPs, power can be left on
while a CP is reseated. To reseat a CP, do the following:
1.
2.
3.
4.
5.
6.
7.
See CAUTION. Make sure your hands are...

Page 66

INSTALLATION
Figure 2-15.Typical System 25 Port Circuit Pack
Report Problems
Follow local procedures to report faulty or damaged equipment.
2-42November 1995 

Page 67

INSTALLATION
Initialize System
Instructions
for initializing the system(based on the completed
implementationforms) are provided in the Administration Manual
(555-540-500).
Note:Before trunks using DS1 Signaling are administered, all link
level parameters such as signaling and framing and all link
level alarms must be cleared. If this is not possible, PBXs at
each end will not work.If this condition exists, clear a
maintenance busy condition that exists at each end.
INSTALL CROSS-CONNECT EQUIPMENT
Before...

Page 68

INSTALLATION
Install TAE, 617A Panels, and Fanning Strips
To install this equipment, proceed as follows:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
For each RJ21X, RJ2GX, and RJ48X
700A Jack 1/2-inch from the edge of
switch cabinet(s).
Mount the first 617A Panel.
network interface, install one
the backboard closest to the
Position and mount the first 50A Fanning Strip next to the 617A
Panel. The edges should overlap so that the same screws will go
through the overlapping key slots in the 50A Fanning Strip and...

Page 69

INSTALLATION
FIRST
108 ETUPLYWOOD
BACKBOARD
1/2
ADDL 700A
BLOCK
ADDL
ETUADDL 700A
BLOCK
ADDL 700A
BLOCK
ADDL
617A
PANELADDL
617A
PANELADDL
617A
PANELADDL
617A
PANELADDL 700A
BLOCKADDL
ETU
700A
BLOCKADDL
ETU700A
BLOCK
TO SWITCH
CABINET
D-RINGS AS REQD
FIRST
617APANEL FIRST 50A
FANNING
STRIPFLOORFREE HANGING OCTOPUS
CABLE WITH 65 FREE LENGTH
Figure 2-16.SIP and TAE Backboard Layout
2-45 

Page 70

INSTALLATION
NOTE: GREATER
THAN 48 FOR
5-PANEL
ARRANGEMENT
FIRST
108
ETU
Figure 2-17.Alternate SIP and TAE Backboard Layout
2-46 
Start reading ATT System 25 Installation And Maintenance Manual

Related Manuals for ATT System 25 Installation And Maintenance Manual

All ATT manuals