Home
>
ATT
>
Communications System
>
ATT DEFINITY Communications System Generic 3 Planning And Configuration Instructions Manual
ATT DEFINITY Communications System Generic 3 Planning And Configuration Instructions Manual
Here you can view all the pages of manual ATT DEFINITY Communications System Generic 3 Planning And Configuration Instructions Manual. The ATT manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 101
HARDWARE AND SOFTWARE DETERMINATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Cabinet Determination (DEFINITY Generic 1 and Generic 3) DEFINITY Communications Systems G1 and G3 have a duplication option for the control cabinet (that is, control circuits are duplicated). These systems also have an option for duplicating the expansion cabinet (that is, a second port cabinet can be added). A DEFINITY system is ordered according to the need for duplication, the number of ports required, and future growth expecta-...
Page 102
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaHARDWARE AND SOFTWARE DETERMINATION Multi-Carrier Cabinet Configuration A multi-carrier cabinet configuration can be selected from the following equipment arrangements. The G3r data is given in the following table separately from the G1 and G3i data. The G3r data has special considerations and limitations: dThe PPN cabinet is the first cabinet and is available only in the multi-carrier cabinet. dThe PPN cabinet supports only one port network. dThe PPN cabinet is...
Page 103
HARDWARE AND SOFTWARE DETERMINATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa bbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbb Max Attribute Carriers Port Slots* PEC for AC for DC bbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbb PPN With Duplication Duplication Equipment 63201 Control A + Dup. Control B 18 (16) 6300-05A PRC03 PRC05 Control A + Dup. B + Port C 38 (36) 6300-05B PRC03 PRC05 Control A + Dup. B + Ports C, D 58 (56)...
Page 104
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaHARDWARE AND SOFTWARE DETERMINATION Single-Carrier Cabinet Configuration A single-carrier cabinet configuration can be selected from the following equipment arrange- ments. The G3r data is given in the following table separately from the G1 and G3i data. Note:The G3r PPN is only available as a multi-carrier cabinet. The G3r EPN is, however, available in single-carrier cabinets....
Page 105
HARDWARE AND SOFTWARE DETERMINATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Ordering Information Enter the quantities of equipment to be ordered on the Order Summary Sheet which follows (make additional copies of the sheet if needed). The sheets, when completed, can be attached to the order. Use the information listed on the various tables in the manual to complete the entries. To ensure all equipment and facilities are ordered, complete the following checklist. Are the following pieces of equipment/facilities...
Page 106
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaHARDWARE AND SOFTWARE DETERMINATION ORDER SUMMARY SHEET bbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbb Price Element Code (PEC) Description Quantity bbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbb bbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbb bbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbb bbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbbb...
Page 107
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaENVIRONMENTAL REQUIREMENTS ENVIRONMENTAL REQUIREMENTS General This section provides information about the floor and wall space required for system and associ- ated peripheral equipment installed in the equipment room. Specifications for temperature, humi- dity, air purity, and lighting levels are also included. Floor Plans and Layouts Floor plan arrangements will vary depending on the size and shape of the equipment room and the amount of growth...
Page 108
ENVIRONMENTAL REQUIREMENTSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Earthquake Protection When earthquake or disaster bracing is required by law, or when local engineering feels that bracing is necessary, the system cabinet can be bolted to the floor. Figure 14 shows the zones in the North American continent where bracing may be desirable. Note:A greater susceptibility of an area to earthquakes is indicated by a higher number in Figure 14. In the United States, 0 represents the lowest susceptibility...
Page 109
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaENVIRONMENTAL REQUIREMENTS PRINTER (OPTIONAL)MANAGER ITERMINALPROCESSOR PORTNETWORKCABINET(S)(FRONT)CABLE SLACKMANAGER(NOTE 6)CROSS- CONNECTFIELDCHAIR NOTES 3 AND 4TRUNK/AUXILIARYFIELD (NOTE 5)W ALLNOTES:POWER OUTLETS SHOULD BE LOCATED OUTSIDE THE CROSS-CONNECT FIELD AREA.POWER OUTLET(S) MUST NOT BE UNDER SWITCH CONTROL AND MUST NOT BE SHAREDWITH OTHER EQUIPMENT.PROCESSOR PORT NETWORK CABINETS REQUIRE A SPECIAL 120-VOLT, 60-HZ, 15-AMPOR...
Page 110
ENVIRONMENTAL REQUIREMENTSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa PRINTER (OPTIONAL)MANAGER ITERMINALCHAIR TRUNK/AUXILIARYFIELD (NOTE 7)W ALLNOTES:POWER OUTLETS MUST NOT BE UNDER SWITCH CONTROL, MUST NOT BE SHARED WITH OTHEREQUIPMENT, AND SHOULD BE LOCATED OUTSIDE THE CROSS-CONNECT FIELD AREA.PROCESSOR PORT NETWORK CABINET REQUIRES A SPECIAL 120-VOLT, 60-HZ, 50-AMP POWEROUTLET (NEMA 5-50R RECEPTACLE, OR EQUIVALENT).AUXILIAR Y CABINET REQUIRES A SPECIAL 120-VOLT, 60-HZ, 20-AMP POWER OUTLET(NEMA...