Home
>
ATT
>
Communications System
>
ATT DEFINITY Communications System Generic 3 Planning And Configuration Instructions Manual
ATT DEFINITY Communications System Generic 3 Planning And Configuration Instructions Manual
Here you can view all the pages of manual ATT DEFINITY Communications System Generic 3 Planning And Configuration Instructions Manual. The ATT manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 141
UPGRADES AND ADDITIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa System 75 XE Upgrade To DEFINITY Generic 1 PPN Without Duplication The System 75 XE Versions 2 (V2) or 3 (V3) upgrade to DEFINITY Generic 1 requires the follow- ing: dReplacing the J58890G-1 Control Cabinet with a J58890L-1 Basic Control Cabinet con- taining the following ÐTape Drive circuit pack TN774 ÐProcessor TN773 ÐMemory TN770 ÐNetwork Control TN777 dReplacing the TDM cables with WP91716 L3 TDM cables if required dAdding a...
Page 142
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaUPGRADES AND ADDITIONS System 75 XE Upgrade to DEFINITY Generic 1 PPN With Duplication The System 75 XE Versions 2 (V2) or 3 (V3) upgrade to DEFINITY Generic 1 with duplication requires the following: dReplacing the J58890G-1 Control Cabinet with a J58890L-1 Basic Control Cabinet con- taining the following: ÐTape Drive circuit pack TN774 ÐProcessor circuit pack TN773 ÐMemory circuit pack TN770 ÐNetwork Control circuit pack TN777 dReplacing the TDM...
Page 143
UPGRADES AND ADDITIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa System 75 XE Upgrade to DEFINITY Generic 1 EPN Without Duplication The System 75 XE is upgraded to the EPN Cabinet Without Duplication as follows: dReplace the Control Cabinet J58890G-1 with an Expansion Control Cabinet J58890N-1 dReplace the TDM cables with WP91716 L3 TDM cables if required dAdd and restructure port circuit packs System 75 XE Upgrade to DEFINITY Generic 1 EPN With Duplication The System 75 Single-Carrier Cabinet is...
Page 144
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaUPGRADES AND ADDITIONS Circuit Pack Additions and Replacements The following circuit packs, although not required for the basic upgrade, may need to be added or replaced for additional features: dTN722ÐProvides connection capability to DS1, alternate/voice data (AVD), and Digital Multiplexed Interface (DMI) facilities. dTN767 DS1 InterfaceÐProvides connection capability to ISDN feature in addition to the features supported by the TN722. dTN725...
Page 145
UPGRADES AND ADDITIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Port Circuit Pack Upgrades for DEFINITY Generic 3r It may be necessary, depending on the features required for a particular upgrade, to upgrade some of the port circuit packs. Table U lists the port circuit packs that may need to be upgraded to a later vintage of the same circuit pack or to a different circuit pack, along with the cir- cumstances that make the upgrade necessary. TABLE U. Port Circuit Pack Upgrades...
Page 146
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaUPGRADES AND ADDITIONS DEFINITY Generic 1 Upgrade to DEFINITY Generic 3r PPN When upgrading an existing system to a DEFINITY G3r PPN, with or without duplication, only new shipments of PPNs are supported, so existing cabinets cannot be upgraded regardless of type. Please note that the PPN of a G3r system is only housed in a multi-carrier cabinet. DEFINITY Generic 1 PPN Upgrade to DEFINITY Generic 3r EPN MCC Without Duplication The DEFINITY...
Page 147
UPGRADES AND ADDITIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa dOne current limiter (CFY1) circuit pack is installed on the Expansion Control Carrier in cabinet position A. dReapply the TDM/LAN bus cables or terminator. dThe AUX connection previously made to the A position Control Carrier can also be reused to the new A position Expansion Control Carrier. Note, however, that the AUX connection will no longer support the Initialization and Administration System (INADS) link. The terminal...
Page 148
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaUPGRADES AND ADDITIONS DEFINITY Generic 1 EPN SCC Upgrade to DEFINITY Generic 3r EPN SCC Without Duplication The DEFINITY Generic 1 EPN SCC upgrade to DEFINITY Generic 3r EPN SCC requires the fol- lowing: dRemove TN776 Expansion Interface circuit pack (located in port slot 1 of cabinet position A Expansion Control Cabinet J58890N). This will not be reused. dInstall TN570 Expansion Interface circuit pack in port slot 1 of cabinet position A...
Page 149
UPGRADES AND ADDITIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa dPort circuit packs that were removed can be reinstalled in the Expansion Control Cabinet. Port circuit packs that must be upgraded for G3r functionality can be installed at this time. See Table U for a list of the circuit packs and their replacements. dOne current limiter (CFY1) circuit pack is installed on the Expansion Control Cabinet in cabinet position A. dThe AUX connection previously made to the A position Control Cabinet can...
Page 150
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaUPGRADES AND ADDITIONS DEFINITY Generic 1 PPN SCC Upgrade to DEFINITY Generic 3r EPN SCC With Duplication The DEFINITY Generic 1 PPN SCC upgrade to DEFINITY Generic 3r EPN SCC requires the fol- lowing: dRemove all port circuit packs in the cabinet position A Control Cabinet J58890L. These will be reused in the carrier replacement. dRemove all port circuit packs in the cabinet position B Control Cabinet J58890M. These will be reused in the...