    							A30808-X5130-B120-l-8920Issue 1, May 1986
    EXPANSION CABINET REF.
    L--M--e--\---- -,-,------
    -----
    BASIC‘CABINET REF.
    A5U38-1-4:3:86Figure 2.03Power/Ground Distribution for the SATURN IIE System (Expansion Cabinet)
    2-7 (2-8 blank) 
    						
    							SATURN IIE EPABXA30808-X5130-B120-l-8928Installation Test Procedures
    issue 1. May 1986
    3.01General. The SATURN HE System must be connectedto an earth ground (i.e., metallic cold water pipe or master groundbusbar) in addition to the safety ground in the ac power cord.
    A G-gauge (twisted copper wire) conductor should be connect-ed between the grounding lug E5 located on the bottom of thecabinet frame and the snlccted earth ground (refer to Section
    3.00 in the SATURN HE EPABX Installation Procedures prac-
    tice for details). The following tests must be performed to en-
    sure that proper earth ground connections have been
    accomplished, and that ground connections within the cabinet
    assembly have not been damaged or loosened during shipment.
    WARNiNGHazardous 
    voltsgos txkt within the equipment csbinef. Ee
    extremely ca-ej’Ll when performing t~s%i~g/l’roubiesh~otingprocedures with the equipment panel(s) removed.
    3.02System Grcund Test. Before proceeding with the test’
    procedures indicated in Table 3.00, check that the earth
    ground connections are secure and ground conductors are
    firmly positioned on grounding lug E5 at 
    ihe bottom of the
    cabinet frame.
    3.03Shelf Ground Continuity Test. Each LTU shelf assem-
    bly within the cabinet assembly is grounded via two vertical
    busbars. Beiore proceeding with the test procedures indicat-
    ed in Table 3.01, check that each shelf backplane is iniercon-netted with the busbar flanges and adequately secured into
    position.
    Table 3.00 
    System Ground Test
    PROCEDURE
    VERlFlCATlONIF VERlFlCATIONIS NOT OBTAINED
    .lIf connected, remove ac power cord
    from commercial power outlet.
    2Short digital multimeter tesi leads
    together and noie resistance of test
    leads.
    3Set digital multimeter to lowestResistance measured should beIf a reading greater 
    ihan 2 ohms is
    resistance range and connect itsbetweem 0 and 2 ohms greater thanobtained, the faulty ground con-leads between the U-ground pin ofthe measured test lead resistance.nection must be isolated and cor-the ac power cord and the U-groundrected befora continuing wi?h the
    socket in the commercial powerinstallation test procedures
    outlet (refer to Figure 3.00 for details).
    4Repeat procedure with second acSame as step 3 above.Same as step 3 above.
    power cord if optional expansion
    cabinet is incorporated into system.
    Table 3.01 Shelf Ground Continuity Test
    STEP
    PROCEDUREVERIFICATIONIF 
    VERIFICATiONIS NOT OBTAINED
    1If connected, remove ac power cord
    from commercial power outlet.
    2Set digital multimeter to lowestResistance measured should beIf a reading greator than 1 ohm is
    resistance range and connect itsbetween 0 and 1 ohm greater thanobtained, the faulty ground connec-leads between ground lug E5 locatedthe measured multimeter test leadtion must be corrected before con-at the bottom of the cabinet frame,resistance.tinuing the installation test pro-and one of the busbar/backplanecedures.
    attaching screws for each existing
    LTU shelf (refer to Figure 3.01)
    3-l 
    						
    							SATURN IIE EPABXA30808-X5130-B120-l-8928Installation Test ProceduresIssue 1, May 1986
    BASIC Cabinet
    GND
    LUGFuse Box
    Facility
    (ES) ,
    5, B DPower co
    PSUfllOVAC~$GOi-fZElElNeulral
    Ground
    hlatn Cabmel
    (Rear View)
    Recommended: B-gauge
    (iwtsted Copper Wire)
    conductor not exceedmgi26 feet m length.
    I(Ootlonall
    I.1
    fMaster Ground Busbar
    Earth GroundNote: Single Point Ground (SPG) configuration 
    IS shownFigure 3.00 System Ground Test Connections
    3-2 
    						
    							SATURN IIE EPABX
    Installation Test ProceduresA30808-X5130-8120-1-8928Issue 1, May 1986
    Busbar/
    Backplane-Attaching
    Screws
    GND
    LugNo. E5 ’
    7-
    Recommended: 6 Guage
    (twisted copper wire) conductor
    not exceeding 126 feet in length.I(Rear View)
    Busbar Grounded at
    Fuse Box Facility\
    IL---_-IPower
    Cord Plug
    7Master Ground Busbar
    Earth Ground
    Note: Single Point Ground 
    (SPG) configuration is shownFigure 3.01 Shelf Ground Continuity Test Connections
    3-3 (3-4 blank) 
    						
    							I-_SATURN 
    IIE EPABX
    installation Test ProceduresA30808-X5130-BlZO-l-8928Issue 1, May 1986
    SECTION 4.00 POWER-UP TESTS
    4.01General. The SATURN IIE System makes use of dis-
    tributed power in the equipment cabinet. Several power sup-
    plies are used in the system. These power supplies provide
    +5Vdc, -SVdc, +12Vdc, -12Vdc, -48Vdc, 90Vac-20Hz ringing
    voltage and message waiting voltage, from a 11OVac 60Hzinput power source. After satisfactorily performing the ground
    tests 
    indicaied in Section 3.00, the following tests must be per-
    formed to ensure that proper power cable connections have
    been accomplished and that the power supplies inside the
    cabinet assembly have not been damaged during shipment.WARNING
    Hazardous voltages exist within the equipment cabinet. Beextremely careful when performing testin@roubkshootjng’pmcedures with the equipment panel(s) removed.
    4.02Power-Up/Output Voltage Tests. Before proceeding with
    the test procedures indicated in Table 4.00, check that all pow-
    er cable assemblies are properly secured into their correspond-
    ing locations. Note that the test procedures in Table 4.00 include
    procedures for testing the optional MSM, when equipped in thesystem.
    Table 4.60 Power-Up/Output Voltage Test
    YiEPPROCEDtJREf not previously done, extract each
    ‘CB in the system from its respec-ive backplane connector in basic
    md LTU shelves.
    Check that all circuit breakers on the‘SU are in the off positions and that311 fuses are inserted in their cor-,esponding locations.
    Jsing the digital multimeter (or an
    3c polarity indicator), verify that the:ommercial ac power receptacleJsed for powering the systsm has theIroper polarity.
    Connect the 
    ac power cord(s) to thezommercial ac power receptacle(s).
    ?lace the following circuit breakerson the PSU to the on (up) position:
    a) Basic PS
    b) 
    -48PSOc) -48PSl (if equipped)
    d) LTUPSO (if equipped)
    e) 
    LTUPSl (if equipped)
    9 LTUPS2 (if equipped)
    If the optional MSM module is
    equipped in the system, proceed 
    2sfollows:
    2) If not previously done, connect
    and insert battery pack into
    the MSM assembly.
    b)Press the BATTERY TEST
    switch on the PSU and
    release after verification has
    been obtained.VERIFICATION
    ‘olarity indication must coincide with=igures 3.00 and 3.01.
    The associated green LED should
    light steadily.IF VERIFICATION
    IS NOT 
    08TAlNEDif polarity indication does not coin-
    cide, correct before proceeding with
    the remainder of test in this 
    lable.If the green LED remains 
    cxtin-guished, the battery pack is below
    acceptable voltage limits. Let MSM
    charge battery pack and retry test af-
    ter 30 minutes have elapsed. If green
    LED remains extinguished, the bat-
    tery pack is defective and requires
    replacement.
    ‘l-1 
    						
    							SATURN IlE EPABX
    Installation Test ProceduresA30808-X5130-8120-1-8928issue 1, May 1986
    Table 4.00 Power-Up/Output Voltage 
    Test (Continued)
    SE?PROCEDUREVEfiIFICATIONIF VERIFICATION
    IS NOT OBTAINED
    c) On the PSU, place the circuitThe red LED designated BATTERYIf the red LED remains extinguished,
    breaker designated BASIC PS
    TEST.should be steadily lit.replace the MSM.
    in the off (down) position.
    The red BATTERY TEST LED should1d) On the PSU, place the circuitIf the red LED remains steadily lit,
    breaker designated BASIC PSbe extinguished.either the cabinet ac power cord is
    to the on (up) position.not connected to the commercial ac
    power receptacle or a local ac pow-
    er failure has occurred.
    7Set digital multimeter to appropriateNOTEdc voltage scale for the followingIf further troubleshooting information
    tests.
    is required during these testing
    procedures, refer to SATURN 
    IIEEPABXMaintenanceand
    Troubleshooting Practice.
    8ATo measure the unloaded basic shelf
    input voltages, proceed as follows:
    a) On basic backplane shown inVoltage measured should read 
    be-If reading is not within tolerance, ad-Figure 4.00, take reading be-tween +4.5 and +5.5 Vdc.just +5V ADJUST potentiometer on
    tween terminal El, E2, E3 orPSU. If still out-of-tolerance replace
    E4 and ground.
    PSU.b) On basic backplane connectorVoltage measured should read 
    bo-If reading is not within to!erance,J46, shown in Figure 4.00, taketween -43 and -53Vdc.
    check the -48P-BASIC fuse in PSU.
    readings beiween pins 2 and 3.If fuse is good, replace -48PSO.
    c) Set digital multimeter to 
    ap-Voltage measured should be be-If the voltage is not present, check
    propriate Vat scale and taketween 75 and 100 Vat.and replace RGEN fuse or RAC BAS-reading between pins 1 and 2IC fuse on PSU. If fuses are good,
    of J46.
    replace RGEN PCB. If voltage still notpresent, replace PSU.
    d) Set digital multimeter to appropri-ate Vdc scale and take readings
    between the following pins on
    basic backplane connector J47
    (shown in Figure 4.00):
    1) Pins 1 and 3.
    2) Pins 2 and 3.Voltage measured should be be-If reading is not within tolerance,
    tween -4.9 and 
    -5.2Vdcreplace the PSU.
    Voltage measured should be 
    be-If reading is not within tolerance,
    tween -43 and -53Vdccheck the -488 BASIC fuse on PSU.
    If the fuse is good, replace -48PS0.
    e) On basic backplane connector
    J48, shown in Figure 4.00, take
    readings between the following
    pins:
    1) Pins 1 and 4.
    2) Pin 2 or 3 and pin 4.
    3) Pins 4 and 5.Voltage measured should read 
    be-If reading is not within tolerance,
    tween -11.3 and -12.7Vdc.replace the PSU.
    Voltage measured should be 
    be-If reading is not within tolerance,
    tween +11.3 and +12.7Vdc.replace the PSU.
    Voltage measured should be 
    be-If reading is not within tolerance,
    tween 4.85 and 5.15Vdc.check that J16 on the rear panel of
    the PSU is strapped to the MSM ter-
    minal. If the strap is in place, replace
    the MSM. 
    						
    							I-SATURN 
    IIE EPABX
    Installation Test ProceduresA3G808-X5130-B120-1-B928Issue 1, May 1986
    lbb!c 4.00 Power-Up/Output Voltage Test (Continued)
    STEPFROCEDUEEVERIFICATIONIF VERIFICATION
    IS NOT OBTAINED.f) Connect positive lead of digitalVoltage measured should read +If reading is not 0.05 Vdc, adjust 
    +5Vmultimeter to pin 5 of connec- 0.05Vdc.ADJUST potentiometer on PSU. If
    tor J48 and negative lead toadjustment is not effective, replace
    terminal El on basic 
    back-PSU.plane. (Refer to Figure 4.00.)
    813After satisfactorily completing step8A, proceed as follows to measure
    the loaded basic shelf input voltages.
    a) On the PSU, place the circuitThe MSM red LED designated 
    BAT-breaker designa?ed BASIC PSTERY TEST should be steadily lit.
    in the off (down) position.
    b) Plug all previously extracted
    PCBs on the basic shelf into
    their respective backplane
    connectors.
    c) On the PSU, place the circuitThe MSM red LED designated BAT-
    breaker designated BASIC PSTERY TEST should be extinguished.
    in the on (up) position.
    d) Repeat measuring proceduresSame verification as in steps 
    8A a)
    on basic backplane connectorsthrough e), except that -t-S!/& at ter-J46, J47, J48 and terminalsminal El should read between 4.85
    El-E4 as indicated in step 8A.and 5.15Vdc under load.
    9ATo measure the unloaded LTU shelfinput voltages (if applicable), proceedas follows:
    a) On the LTU backplane con-
    nector 
    J42,shown in Figure4.01,take a reading between
    the following pins:
    1) Pins 1 and 3.Voltage measured should be 
    be-If reading is not within to!e:ance, ad-tween +4.5 and +5.5Vdc.just +5V ADJUST potentiometer on
    LTUPS. If the adjustment does not
    bring voltage into 
    tolerance,replaceLTUPS.2) Pins 3 and 5.
    3) Pins 3 and 4.Voltages measured should be 
    be-If reading is not within tolerance,
    tween -4.9 and -5.2Vdc.replace appropriate LTUPS.
    Voltage measured should be 
    be-If reading does not coincide with
    tween -43 and -53Vdc.verification reading, check the -48PLTU fuse on PSU. If fuse is good,
    replace -48PS0.
    4) Set digital multimeter to
    read 
    Vat and connect be-
    tween pins 2 and 3.Voltage measured should be be- If voltage isnot present,
    tween 75 and 1OOVac.check/replace RGEN fuse or RAC
    LTUO fuse on PSU. If fuses are good,
    replace PSU.
    b) Set digital multimeter to ap-
    propriate Vdc scale.
    C) On LTU backplane connector
    J43,shown in Figure 4.01, take
    a reading between the follow-
    ing pins:
    4-3 
    						
    							SATURN IIE EPABX
    Installation Test ProceduresA30808-X5130-B120-l-6928Issue 1, May 1986
    Table 4.00 Power-Up/Output Voliagc? Test (Continued)
    STEPPROCEDUREVEFllFlCATlONIF VERIFICATION
    IS NOT OBTAINED
    1) Pins 1 and 3.Voltage measured should read 
    be-If reading is not within tolerance, ad-tween +4.5 and +5.5Vdc.just +5V ADJUST potentiometer onLTUPSO. If adjustment does not bringthe voltage into tolerance, replace
    LTUPSO.2) Pins 1 and 2.Voltage measured should read 
    be-If reading is not within tolerance,
    tween -43 and -53Vdc.replace -48PS0. If voltage not
    present, check 
    -488 LTUO fuse on
    PSU. If fuse is good, replace 48PS0.
    3) Pins 1 and 4.
    Voltage measured should read 
    be-If reading is not within tolerance,
    tween +11.3 and +12,7Vdc.replace LTUPSO.
    4) Pins 1 and 5.Voltage measured should read 
    be-If reading is not within tolerance,-. ttieen -11.3 and -12.7Vdc.replace LTUPSO.
    d) On LTU backplane connectorVoltage measured should read 
    be-If reading is not within tolerance,
    J44 shown in Figure 4.01, taketween +4.5 and +55Vdc.check +5V cabling between be-a reading between pins 1 andtween basic shelf and LTU
    2 or pins 1 and 3.
    98Repeat steps 9A a) through d) for ex-
    pansion cabinet LTU shelf voltages
    (if applicable) substituting 
    -48PSl for
    48Vdc power supply and appropriate
    LTUPS.
    9CAfter satisfactorily completing steps9A and 96, proceed 2s follows to
    measure the loaded LTU shelf input
    voltages:
    a) On the PSU, place the circuit
    breakers designated
    LTUPSO,LTUPSl,and LTUPS2
    in the off (down) positions.
    b) Plug all previously extracted
    PCBs on the LTU shelves into
    their respective backplane
    connectors.
    c) On the PSU, place the circuit
    breakers designated LTUPSO,
    LTUPSl, and LTUPS2 in the
    on (up) positions.
    d) Repeat measurements on LTUVoltages measured should be within
    backplane connectors J42,same tolerances except 
    +5Vdc sup-J43, and J44 per step 9A.ply should read between 4.85 and5.15 Vdc.
    4-4 
    						
    							I
    SATURN IIE EPABXlnstallatlon Test ProccdurcsA30808-X5130-8120-1-8928Issue I, May 1986
    J46/P46
    J47/P47
    Figure 4.00Location of Input Voltage Connectors 011 Basic Bockplnnc 
    						
    							SATURN IIE EPABXA30808-X5130-8120-1-8928nstallation Test Procedures
    Issue 1, May 1986i
    ---I
    I
    :42/?42
    J43/P43
    J44lP44
    Figure 4.0.1Location cf Input Voltage Connectors on LTU Dackp!ane 
    						