Samsung Ht As700 User Manual
Have a look at the manual Samsung Ht As700 User Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1705 Samsung manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
71 Connecting 64-point unit (NX-X64D, NX-Y64T) Mapping table between flat cable No. and I/O (64 points) NC: No Connection NX-X64DN I C D Product name Catalog numberSpecifications Flat cable (1.5m)NX-CBLDCDC IN 64 points (NX-X64D) NX-CBLTRTR OUT 64 points (NX-Y64T) Flat cable Flat cable ATTENTIONBe careful that Connector (I) and connector (II) are opposite. Symbols on the unit surface NX-X64DNX-Y64T 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20X 0 X 1 X 2 X 3 X 4 X 5 X 6 X 7 X 8 X 9 X A X B X C X D X E X F X 10 X 11 X 12 X 13 Y 0 Y 1 Y 2 Y 3 Y 4 Y 5 Y 6 Y 7 Y 8 Y 9 Y A Y B Y C Y D Y E Y F Y 10 Y 11 Y 12 Y 13 Symbols on the unit surface NX-X64DNX-Y64T 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40X 14 X 15 X 16 X 17 X 18 X 19 X 1A X 1B X 1C X 1D X 1E X 1F NC NC NC NC COM COM COM COMY 14 Y 15 Y 16 Y 17 Y 18 Y 19 Y 1A Y 1B Y 1C Y 1D Y 1E Y 1F NC NC NC NC V DC+ V DC+ V DC- V DC-
72 Safety Measures Precautions regarding system design In certain applications, malfunction may occur for the following reasons: The timing difference between opening and closing of the PLC power supply, the I/O modules and power equipment An operation time lag when a momentary power failure occurs Abnormality in the PLC, external power supply, or other devices In order to prevent a malfunction resulting in system shutdown choose the adequate safety measures listed in the following: Interlock circuits on the outside of PLC When a motor clockwise/counter-clockwise operation is controlled, provide an interlock circuit that prevents clockwise and counter- clockwise signals from inputting into the motor at the same time. Emergency stop circuits on the outside of PLC Install the emergency stop circuits outside the PLC to stop the power supply of the output device. Start PLC after other devices (Start up sequence) The PLC should be operated after all of the I/O devices and the power equipments are energized. Switch to RUN mode after the start of PLC. Use a timer circuit to delay the start of PLC. Watchdog timer The watchdog timer is a program error and hardware error detection timer. It goes On when the scan time exceeds 640 ms. When the watchdog timer is activated, at the same time the ALARM LED lights, the ALARM contacts on the power supply module turn to On, all output modules are turned Off and the module is put in halted state. (The system is in a non-processing state that includes communications with programming tools as well.)
73 NX-CPU700p Processor Module Communications Specifications RS232C/RS485 cable wiring diagram: NX-CBLCPU02 (2m), NX-CBLCPU05 (5m) Reference (25 pin to 9 pin) wiring diagram Connection specificationRS485RS232CRemarks Transfer distance (Max)1. 2 K m 1 5 m Transmission speed38,400, 19,200, 9,600, 4,800 bps DIP switch setting ProtocolHalf duplex asynchronous polling ParityNo parity Stop bit1 stop bit Cable typeTwisted pair cable Use shield cable NX-CBLCPU02 (2m) NX - CB L CP U0 5 (5 m) I B M PC P LC Si d e 9 -p i n D - Su b ca b le ( F e ma le )9 -p i n D - Su b ca b le ( Ma l e) RS-232C is available without connecting 485+, 485-, Vcc signals.Vcc I B M- P C ( 2 5 p i n - F em al e )P LC ( 9 p i n - Ma l e)
74 EEPROM Backup Whats EEPROM backup? EEPROM (Electric Erase Programmable Read Only Memory) can retain the data when the power is turned off, and erase or record data when the power is turned on. This function allows you to retain the PLC program when the power is turned off. And it also erases an existing program and records a new one when correcting or storing a program after turning on the power. Applicable models The types of EEPROM can be defined by its characteristics. The CPUs for OE M AX NX70 (NX70-CPU70p1 and NX70-CPU70p2) PLC use the flash memory. This function is widely used since it is easy to use, store, and transfer data, and is built in the NX70 PLC (NX70-CPU70p2). EEPROM uses 29EE512 and has a minimum of 3000 times to write to flash memory. It should be noted that the memory is to be changed when exceeding the use of over 3,000 times. Procedure Backup using WinGPC How to backup using WinGPC Connect Online. Save the completed program onto the PLC (Download: WinGPC => PLC). Select the ‘EEPROM Backup (E)’ in the ‘Online’ menu. DIP switch OFF Operates with the program stored in RAM using battery power.DIP switch ON Erases the contents of RAM and copy the programs stored in EEPROM onto RAM to operate. Starts ‘EEPROM backup’ or operates ‘EEPROM backup’ at WinGPC RAM OperationBattery PLC Power ON Program stored in EEPROM
75 5 Test Run and Troubleshooting Test Run Precautions Before installing the I/O wiring of the PLC and supplying power, check the following items. ItemWhat to check The connection of the power cable and the I/O cables Check if the wiring is secured. Check if the terminal screws are tightened. Check if the parts of connectors are properly joined. Check if the I/O modules are firmly fixed. Check if the power cable is securely connected. Check if the cable size is correct. Grounding Check if the grounding is triple grounded and separate from other device grounds. Battery Check if the battery is installed into holder on the CPU module. Check if the battery connector is connected to the CPU board Emergency stop circuit Check if the emergency stop circuit for problems external to the PLC is wired accurately, and will immediately disconnect power on demand. Power source Check if the power and voltage sources are within specifications. - For 110V ac (90 to 132V ac) - For 220V ac (180 to 264V ac) Check if the power to the AC input module is within specifications.
76 Test Run Procedure When the PLC has been installed and wired, begin test run in the following order. ItemWhat to check/do Supply power Check if the input voltage of the power supply module is within specifications. Check if the power voltage for the I/O modules is within specifications. Connect WinGPC to the CPU module. (Set the CPU module to the PROG mode.) Turn on the power source. Check the LED display of the power supply module. Initialize memory Initialize the PLC using WinGPC. (This clears the program on the PLC.) Check I/O wiring Check the LED of the input modules and use the monitor function of WinGPC or HHP after test run the input device. Check the wiring of the output by turning the output On/Off using the monitor mode of WinGPC. (set CPU module to Run mode.) Programming Input the program instructions using WinGPC. Download the program from WinGPC into the CPU module, if any. Te s t r u n Set the mode switch of the CPU module to run. Check if the Run LED is illuminated. Check the sequence operation. Correct program Check and correct any program errors. Store program Store the program onto a floppy disk or similar storage device such as HDD. Print the program (ladder, mnemonic) and store it in a secure place. It is recommended to record the PLC types, program capacity, name of installation, and date for the recorded program. NOTE
77 Test Run Flow Charts System check flow chart When you encounter problems during startup or test run, first of all, figure out the problems thoroughly. Check if the problems can be reproduced, and analyze the relevance to other devices. Then refer to the system check flow chart.