Home
>
Panasonic
>
Electronic Accessory
>
Panasonic Up/Down Wall Mount Kit, Up/Down Stand Kit UE-608030, UE-608031, UE-608032 Operating Instructions
Panasonic Up/Down Wall Mount Kit, Up/Down Stand Kit UE-608030, UE-608031, UE-608032 Operating Instructions
Here you can view all the pages of manual Panasonic Up/Down Wall Mount Kit, Up/Down Stand Kit UE-608030, UE-608031, UE-608032 Operating Instructions. The Panasonic manuals for Electronic Accessory are available online for free. You can easily download all the documents as PDF.
Page 21
Wall Mounting Construction21 Installation Manual Notice •Ensure that the installation strength is at least as great as the specified pull-out strength of the anchors which is 5,197.5 N [530 k gf]. •Use the values recommended by the manufacturer of the anchors used for the depth to which the anchors are to be embedded in the wall. •Use M8 bolts when the anchors have internal screw threads. •Ensure that the length of the M8 bolts provides an interfitting length of at least 1.5 times the bolt diameter....
Page 22
Wall Mounting Construction 22 Installation Manual If the wall backing materials are not principal structural components, they must be reinforced as below. Install the reinforcing material onto the wall backing materials. If the distance between the wall backing material is not less than 910 mm (2 ft. 11 13/16in.), use a material whose strength is equivalent to the backing materials and add extra backing materials so that the distance is made less than 910 mm (2 ft. 1113/16in.). *Use a material whose...
Page 23
Wall Mounting Construction23 Installation Manual III.When the Principal Structural Components are in Close Proximity to the Wall Backing Materials (when there is no distance between the backing materials and principal structural components) •Dimension “X” must not be more than 170 mm (611/16in.). If this maximum is exceeded, consult with a building contractor and take the steps to ensure that the reinforcing work at least equivalent to what was described in sections I and II above is carried out....
Page 24
Wall Mounting Construction 24 Installation Manual Mounting and Securing the Up/Down Unit 1Hang the up/down unit on the wall again. 2Take the steps below to secure the up/down unit. 1Pass one M8 bolt through the bottom hole in the stay L75 pipe on the left, and use it to secure the up/down unit. 2Pass another M8 bolt through the bottom hole in the stay drum 75 pipe on the right, and use it to secure the up/down unit. 3Tighten the M8 bolts in the top holes of the left and right pipes, and fasten the...
Page 25
Wall Mounting Construction25 Installation Manual Notice •When mounting a projector other than a SANYO model onto the projector bracket, mount it with the adjustment feet on the bottom of the projector retracted. •Follow the steps below to mount a SANYO model. 1Extend the two adjustment feet by pulling them out. 2Pass the adjustment feet through hole A in the projector bracket. 3Move the projector bracket, move the adjustment feet of the projector to the positions shown in the figure below, then...
Page 26
Wall Mounting Construction 26 Installation Manual 3Align the projector sub-bracket so that the projector fits in between, and secure both ends using the toothed washers (J) and the screws ( D) for securing the projector sub-bracket. Notice •Align the projector sub-bracket so that it supports the projector, leaving no gaps. Fasten the sub- bracket securely to the projector on both sides using the toothed washers ( J ) and screws ( D ) for securing the projector sub-bracket. 4Attach the screw ( F)...
Page 27
Wall Mounting Construction27 Installation Manual •The position where the knob is to be secured depends on the projector which is going to be used. Notice •Keep the other knob for future use. After all installation work is finished, attach the knob to an empty hole on the board bracket ( 7 ) on the back of the board. 3Insert the projector arm from above into the pipe holding post of the up/down frame. •Introduce the ends of the power cable and video cable which have already been passed through...
Page 28
Wall Mounting Construction 28 Installation Manual 6Route and connect the power cable and video cable, which have already been passed through the projector arm, to the projector, and secure the pipe cap (G) using the screw (H) for securing the pipe cap. 7Attach cable holder A (1) to the center wall side of the lift bottom stay, and route the power cable and video cable so that they point straight down. •Use cable holder B ( 2 ) for cable management of the elite Panaboard and other equipment....
Page 29
Wall Mounting Construction29 Installation Manual 1Loosely secure the board bottom bracket to the position shown below. •In the state the UB-T880 is shipped, the position where the board bottom brackets are secured is appropriate when using the SANYO LP-WXL46(S). The position where the bottom of the elite Panaboard is to be secured differs depending on the type of elite Panaboard to be installed. Note •The position at which the board bottom bracket is to be fixed applies to the SANYO LP-WXL46(S)...
Page 30
Wall Mounting Construction 30 Installation Manual Notice •Even when the elite Panaboard has been placed on the up/down unit, it has still not been secured in place. If any attempt is made to lift the elite Panaboard in this state, it may become disengaged from the up/down unit so do not lift it until it has been secured loosely. 3Loosely secure the elite Panaboard to the up/ down unit •Remove the lower frame cover centered at the bottom of the elite Panaboard. Align the wall mount holes on the...