    Have a look at the manual Panasonic Up/Down Wall Mount Kit, Up/Down Stand Kit UE-608030, UE-608031, UE-608032 Operating Instructions online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 10737 Panasonic manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							Wall Mounting Construction21
    Installation Manual
    Notice
    •Ensure that the installation strength is at least as great as the 
    specified pull-out strength of the anchors which is 5,197.5 N 
    [530 k gf].
    •Use the values recommended by the manufacturer of the anchors 
    used for the depth to which the anchors are to be embedded in the 
    wall.
    •Use M8 bolts when the anchors have internal screw threads.
    •Ensure that the length of the M8 bolts provides an interfitting length 
    of at least 1.5 times the bolt diameter. (diagram at right)
    •Ensure that the M8 bolts do not strike the bottoms of the anchors, 
    and check that they have been tightened up securely.
    •Recommended tightening torque: 12.5 N•m (127 k gf•cm)
    For tightening purposes, use a torque driver whose torque can be 
    specified.
    II.When the Wall is not a Principal Structural Component
    Check the structure of the wall backing materials. If the following 
    conditions are not satisfied, consult with a building contractor, and 
    proceed with installation after having reinforced the wall so that it does 
    meet the conditions.
    •For the wall backing materials, use wood materials measuring at least 
    50 mm  × 75 mm (131/32in.  × 215/16in.) equivalent to the ones given in 
    the table below or metal stands or other such parts with at least the 
    equivalent strength.
    •The maximum distance between the wall backing materials must be 
    910 mm (2 ft. 1113/16in.).
    Long-Term Allowable Unit Stress of Wood Materials (k g/cm
    2)
    Compressive 
    strength Tensile 
    strengthFlexural 
    strengthShearing 
    strength
    Coniferous 
    trees Japanese red pine, 
    Douglas fir
    75 60 95 8
    Japanese larch, 
    Japanese cypress, 
    “Hinoki” cypress
    75 60 95 8
    Hemlock, 
    Western hemlock65 50 85 7
    Japanese fir, 
    Sakhalin fir, 
    Japanese cedar
    60 45 75 6
    Broad- leaved  trees
    Evergreen oak90 80 130 14
    Japanese chestnut,
    Oak, 
    Japanese beech
    70 60 100 10
    At least 1.5 times 
    the bolt diameter
    M8 Bolt
    Sp r i ng  Was he r
    Anchor
    (internal thread)
    Flat Washer
    (max. diameter of 16 mm [5/8in.])
    Installation
    Surface
    Inside 
    Wa l l*
    Wall 
    Backing 
    Materials
    *
    The term “Inside Wall” refers to  the wall surface inside a room.
    min. 75 mm
    (215/16in.)
    max. 910 mm
    (2 ft. 1113/16in.)
    min. 50 mm
    (131/32in.)
    UE-608030_EN.book  21 ページ  2010年10月28日 木曜日 午後4時20分 
    						
    							Wall Mounting Construction
    22 Installation Manual
    
    If the wall backing materials are not principal structural components, they must be reinforced as below. Install 
    the reinforcing material onto the wall backing materials. If the distance between the wall backing material is 
    not less than 910 mm (2 ft. 11
    13/16in.), use a material whose strength is equivalent to the backing materials 
    and add extra backing materials so that the distance is made less than 910 mm (2 ft. 1113/16in.).
    *Use a material whose strength is equivalent to steel (SPCC t=3) for the metal plate and provide it with a  rust-preventive coating.
    Other Parts Required
    M8 Bolt  × 4 (Select the bolts with the length appropriate for the wall structure.), Spring Washer ×  8
    Flat Washer (max. diameter of 16 mm [
    5/8in.])  × 8, Lock Nut ×  8
    
    •Use N50 nails with a maximum pitch of 150 mm (529/32in.) to connect the reinforcing material with the 
    backing materials.
    •When doing this work, station at least one individual on the room interior side and another individual on the 
    wall backing material side, and tighten the bolts securely.
    Prohibited Action: Do NOT do the following work.
    •Do not provide reinforcement where the wall backing materials and reinforcing material are not 
    interconnected. Otherwise, there is a danger that the unit will fall off the wall.
    
    •Recommended tightening torque of M8 nuts: 12.5 N•m (127 k gf•cm)
    For tightening purposes, use a torque wrench which can specify the torque.
    •To prevent the nuts from becoming loose, use double nuts or similar nuts for the reinforcing material.
    Reinforcing Material (Board)  - - -  1Square Timber - - - - 2 Metal Plate* - - - - - - 2Wall Backing 
    Material
    1820 mm (5 ft. 11 21/32 in.)
    600 mm
    (1ft. 11 
    5/8 in.)
    81 mm(3 3/16 in.)
    438 mm
    (1ft. 5 
    1/4 in.)
    435 mm
    (1 ft. 5 1/8 in.) 951 mm
    (3 ft. 1 7/16 in.)
    12 mm
    (15/32 in.)
    9 mm (11/32 in.)
    in dia.
    X
    Y
    81 mm
    (3 3/16 in.)
    9 mm
    (11/32 in.)
    in dia.
    438 mm
    (1ft. 5 
    1/4 in.)
    600 mm
    (1ft. 11 5/8 in.)
    30 mm (1 3/16 in.)
    9 mm
    (11/32 in.)
     in dia.
    438 mm
    (1ft. 5 
    1/4 in.)
    500 mm
    (1ft. 7 
    11/16 in.)
    31 mm
    (1 7/32 in.)
    X
    Y
    Double Nut (Lock Nut)Metal Plate
    Flat WasherSp r i ng  Was he r
    N50 Nail with max. pitch of 150 mm
     (529/32in.)
    Flat Washer (max. diameter of 16 mm [5/8in.])
    Spring Washer Inside Wall
    Square 
    Timber
    Reinforcing 
    Material (Board)
    Wa l l 
    Backing 
    Material 910 mm (2 ft. 11
    13/16in.)
    910 mm (2 ft. 1113/16in.)
    Reinforcing 
    Material (Board)
    Wall Backing 
    Material Inside Wall
    UE-608030_EN.book  22 ページ  2010年10月28日 木曜日 午後4時20分 
    						
    							Wall Mounting Construction23
    Installation Manual
    III.When the Principal Structural Components are in Close Proximity to the Wall Backing Materials 
    (when there is no distance between the backing materials and principal structural components)
    •Dimension “X” must not be more than 170 mm (611/16in.). If this maximum is exceeded, consult with a 
    building contractor and take the steps to ensure that the reinforcing work at least equivalent to what was 
    described in sections I and II above is carried out.
    •Locate a place where there are no backing materials, and make cutouts in the inside wall to accommodate 
    the mounting of the M8 anchors. Refer to the figure at the top right for the specific dimensions of the 
    cutouts. (W: 30 mm  × H: 30 mm [W: 1
    3/16in.  × H: 13/16in.])
    Other Parts Required
    Anchor  × 4, M8 Bolt  × 4, Spring Washer  × 4, Flat Washer (max. diameter of 16 mm [
    5/8in.])  × 4
    •Dimension “X” is the distance from the principal structural component to the inside wall. Install the anchors 
    all the way through to the principal structural component as above. For details on installing the anchors, 
    refer to “
    I.When the Wall is a Principal Structural Component (a concrete wall which is at least 120 mm [43/4in.] 
    thick)
    ”(page 20). Ensure that the installation strength is at least as great as the specified pull-out strength of 
    the anchors which is 5,197.5 N [530 k gf].
    IV.When the Wall Structure is Other than  the Ones Covered in Sections I to III
    Provide reinforcement at least equivalent to that in section II, and install the up/down unit.
    X
    Backing 
    Materials
    Concrete or Other 
    Principal Structural 
    Component
    X
    951 mm (3ft. 1 7/16 in.)
    30 mm
    (1 3/16 in.)
    910 mm
    (2ft. 11 13/16 in.) 
    910 mm
    (2ft. 11 
    13/16 in.) 
    438 mm
    (1ft. 5 
    1/4 in.) 
    30 mm
    (1 3/16 in.)
    Inside Wall Concrete or Other Principal Structural Component
    Backing 
    Materials
    X
    Inside wall
    M8 Anchor
    Backing 
    Materials Square Timber
    Spring Washer
    910 mm
    (2 ft. 1113/16in.)910 mm
    (2 ft. 1113/16in.)
    Flat Washer (max. diameter of 
    16 mm [5/8in.])
    Principal Structural Component9.0 mm (11/32 in.)
    in dia.
    30 mm
     
    (1 3/16 in.)
    30 mm (1 3/16 in.)
    X
    Square Timber ×  4
    Indoor 
    Side
    UE-608030_EN.book  23 ページ  2010年10月28日 木曜日 午後4時20分 
    						
    							Wall Mounting Construction
    24 Installation Manual
    Mounting and Securing 
    the Up/Down Unit
    1Hang the up/down unit on the wall again.
    2Take the steps below to secure the up/down unit.
    1Pass one M8 bolt through the bottom hole in 
    the stay L75 pipe on the left, and use it to 
    secure the up/down unit.
    2Pass another M8 bolt through the bottom 
    hole in the stay drum 75 pipe on the right, 
    and use it to secure the up/down unit.
    3Tighten the M8 bolts in the top holes of the 
    left and right pipes, and fasten the up/down 
    unit securely to the wall.
    After mounting the up/down unit on the wall, pull the 
    unit toward you, and check that the wall-mounting 
    bolts are fastened completely.
    Notice
    •To ensure safety, do this work with another individual 
    without fail.
    Preparing to Mount the 
    Projector
    Shown below are the projector models which can be 
    secured to the projector bracket.
    Use the spacers, bushings and screws at the positions 
    shown for each model, and fasten the projector 
    securely.
    (Projector models supported as of May 2010)
     
    
    Bolts
    Bolts Stay L75 
    Pipe
    Stay Drum 
    75 Pipe
    Panasonic PT-ST10
    SANYO LP-WXL46(S)
    EPSON EB-410W Optoma EX525ST
    BenQ 
    MP772ST
    MP776ST
    MP782ST
    Acer S1200
    UE-608030_EN.book  24 ページ  2010年10月28日 木曜日 午後4時20分 
    						
    							Wall Mounting Construction25
    Installation Manual
    Notice
    •When mounting a projector other than a SANYO 
    model onto the projector bracket, mount it with the 
    adjustment feet on the bottom of the projector 
    retracted.
    •Follow the steps below to mount a SANYO model.
    1Extend the two adjustment feet by pulling them 
    out.
    2Pass the adjustment feet through hole A in the 
    projector bracket.
    3Move the projector bracket, move the adjustment 
    feet of the projector to the positions shown in the 
    figure below, then align the positions of the 
    spacers with the holes for fastening the projector, 
    and use the screws to fasten the projector.
    4Retract the adjustment feet.
    1Secure the spacers ( A) and bushings (B) used 
    to secure the projector through the holes to be 
    used for the projector model concerned on the 
    projector bracket in such a way that the 
    bracket is sandwiched between the spacers 
    and bushings.
    •The spacers ( A) used to secure the projector 
    are secured in the holes whose positions are 
    indicated by the initial of the projector brand.
    2Align the attached spacers with the holes used 
    to suspend the bottom panel of the projector, 
    and secure them using the screws ( C)* for 
    securing the projector.
    * For an Acer projector, use the screws ( I) for 
    securing the projector (for Acer) instead.
    Adjustment Feet
    Screw Fastening Positions Hole A
    Initial Projector model name
    No. of 
    spacers
    “P” Panasonic PT-ST10 3
    “S” SANYO LP-WXL46(S) 5
    “E” EPSON EB-410W 5
    “O” Optoma EX525ST 4
    “A” Acer S1200 3
    “B” BenQ MP772ST 
    MP776ST 
    MP782ST3
    Bushing for Securing 
    Projector (
    B)
    Spacer for Securing 
    Projector ( A)
    Screw for Securing 
    Projector 
    (C)*
    Bushing for Securing 
    Projector ( B)
    Spacer for Securing 
    Projector 
    (A)
    UE-608030_EN.book  25 ページ  2010年10月28日 木曜日 午後4時20分 
    						
    							Wall Mounting Construction
    26 Installation Manual
    3Align the projector sub-bracket so that the 
    projector fits in between, and secure both ends 
    using the toothed washers (J) and the screws 
    ( D) for securing the projector sub-bracket.
    Notice
    •Align the projector sub-bracket so that it supports 
    the projector, leaving no gaps. Fasten the sub-
    bracket securely to the projector on both sides 
    using the toothed washers ( J
    ) and screws ( D
    ) 
    for securing the projector sub-bracket.
    4Attach the screw ( F) for securing the pipe 
    bracket to the pipe bracket ( E), and secure the 
    pipe bracket to the projector bracket.
    Mounting the Projector Arm
    1Pass the power cable used for the projector 
    and the video cable through the projector arm.
    Notice
    •Ensure that the plugs to connect to the projector 
    come out at the longer end of the projector arm 
    (the part where the projector is mounted).
    •If the outlet end of the power cable is too large to 
    go through the projector arm, the projector arm 
    cannot be mounted on the up/down unit.
    Pass a length of string (twine) through the 
    projector arm, and then pass the cable with the 
    string attached to it through the projector arm 
    after the arm has been mounted on the up/down 
    unit.
    2Decide on the position of the knob provided on 
    the rear on the projector arm, and fasten it 
    tightly.
    For SANYO LP-WXL46(S)
    Projector Sub-Bracket Screw for Securing
    Projector Sub-
    Bracket
     (
    D)
    Toothed Washer for 
    Securing Projector 
    Sub-Bracket  (J)
    Pipe Bracket  (E)
    Screw for Securing Pipe Bracket 
    (F)
    2 to 3 mm 
    (3/32 to 1/8in.)
    Projector End (longer)
    Power Outlet End 
    (shorter)
    Top position
    Center position
    Knob (Bottom position)
    Hole for Securing Projector Arm 
    (Use when moving the stand)
    UE-608030_EN.book  26 ページ  2010年10月28日 木曜日 午後4時20分 
    						
    							Wall Mounting Construction27
    Installation Manual
    •The position where the knob is to be secured 
    depends on the projector which is going to be 
    used.
    Notice
    •Keep the other knob for future use. After all 
    installation work is finished, attach the knob to an 
    empty hole on the board bracket ( 7
    ) on the back 
    of the board.
     
    3Insert the projector arm from above into the 
    pipe holding post of the up/down frame.
    •Introduce the ends of the power cable and video 
    cable which have already been passed through 
    the projector arm into the pipe holding post, and 
    then insert the projector arm.
    Notice
    •When mounting the projector arm, ensure that its 
    end does not hit anybody or anything in the 
    vicinity.
    4Mount the projector bracket, on which the projector 
    unit has been mounted, onto the projector arm.
    •The position where the projector is to be 
    mounted depends on the model which is going to 
    be used. Adjust the distance from the longer end 
    of the projector arm (the part where the projector 
    is mounted) to the projector bracket to what is 
    indicated below, and secure the projector.
    5Tighten up the screw ( F) for securing the pipe 
    bracket, and loosely secure the bracket to the 
    projector arm.
    Top position Panasonic PT-ST10
    Center 
    position EPSON EB-410W
    Acer S1200
    BenQ 
    MP772ST / MP776ST / MP782ST
    Bottom 
    position SANYO LP-WXL46(S)
    Optoma EX525ST
    Pipe Hold Post
    ModelA
    Panasonic PT-ST10 22 cm (8
    21/32in.)
    EPSON EB-410W 6 cm (2
    3/8in.)
    Acer S1200 8 cm (3
    5/32in.)
    BenQ MP782ST 8 cm (3
    5/32in.)
    BenQ MP772ST / MP776ST4cm (19/16in.)
    SANYO LP-WXL46(S) 4 cm (1
    9/16in.)
    Optoma EX525ST 8 cm (3
    5/32in.)
    A
    Screw for Securing Pipe Bracket ( F)
    UE-608030_EN.book  27 ページ  2010年10月28日 木曜日 午後4時20分 
    						
    							Wall Mounting Construction
    28 Installation Manual
    6Route and connect the power cable and video 
    cable, which have already been passed 
    through the projector arm, to the projector, and 
    secure the pipe cap (G) using the screw (H) 
    for securing the pipe cap.
    7Attach cable holder A  (1)
     to the center wall side of 
    the lift bottom stay, and route the power cable and 
    video cable so that they point straight down.
    •Use cable holder B  (
    2
    )
     for cable management of 
    the elite Panaboard and other equipment.
    •Use the hook and loop fastener  (
    3
    )
     for cable 
    management of the computer on the table and 
    cords connected to the plug adaptor.
    Adjusting the Up/Down Unit
    Align the position of the hold tube assembly, to which 
    the gas spring is secured, with the elite Panaboard 
    model to be installed, and set it.
    •Adjustment Tolerance:  d 1
    Pipe Cap ( G)
    Screw for Securing Pipe Cap ( H)
    Cable Holder A (1
    )
    Lift Bottom Stay
    Model No.Adjustment
    PositionModel No.AdjustmentPosition
    UB-T880W 9 UB-T781 2
    UB-T880 7 UB-T780 1.5
    UB-T781W 2.5
    UB-T780BP1
    Hold Tube Assembly
    M6 189 Screw
    Arm 450
    Gas Spring
    Adjustment Position
    UE-608030_EN.book  28 ページ  2010年10月28日 木曜日 午後4時20分 
    						
    							Wall Mounting Construction29
    Installation Manual
    1Loosely secure the board bottom bracket to 
    the position shown below.
    •In the state the UB-T880 is shipped, the position 
    where the board bottom brackets are secured is 
    appropriate when using the SANYO 
    LP-WXL46(S). The position where the bottom of 
    the elite Panaboard is to be secured differs 
    depending on the type of elite Panaboard to be 
    installed.
    Note
    •The position at which the board bottom bracket is to 
    be fixed applies to the SANYO LP-WXL46(S) 
    projector.
    When any other projector is going to be used, move 
    it from the position shown above by the dimensions 
    given below.
    2Mount the elite Panaboard on the up/down unit.
    •Attach the board brackets ( 7) to the left and 
    right board attachments on the rear side of the 
    elite Panaboard using screws ( 6) for securing 
    each board bracket.
    •Attach the lower-left bracket to the left side (outer 
    side) of the left board attachment. Similarly, 
    attach the lower-right bracket to the left side 
    (inner side) of the right board attachment.
    •With the help of another individual, take hold of 
    the elite Panaboard, align it so that the board 
    bottom bracket and the part for securing the elite 
    Panaboard wall amount are aligned, and 
    suspend the elite Panaboard at that position.
    Model No.AB
    UB-T880W
    UB-T880 344.5 mm
    (1 ft. 1
    9/16in.) 389 mm
    (1 ft. 35/16in.)
    UB-T781W 156 mm
    (6
    1/8in.) 200 mm
    (77/8in.)
    UB-T781
    UB-T780
    UB-T780BP 94 mm
    (3
    11/16in.) 262 mm
    (105/16in.)
    AB
    Panasonic + 147 mm
    (+ 5
    25/32in.) – 147 mm
    (– 525/32in.)
    EPSON + 157 mm
    (+ 6
    3/16in.) – 157 mm
    (– 63/16in.)
    BenQ + 145 mm
    (+ 5
    23/32in.) – 145 mm
    (– 523/32in.)
    Acer + 182 mm
    (+ 7
    5/32in.) – 182 mm
    (– 75/32in.)
    Optoma + 178 mm
    (+ 7 in.) – 178 mm
    (– 7 in.)
    AB
    Board Bottom Brackets
    Board Attachments
    Board 
    Brackets (
    7)
    Board 
    Brackets 
    Fastening
    Screws (
    6)
    UE-608030_EN.book  29 ページ  2010年10月28日 木曜日 午後4時20分 
    						
    							Wall Mounting Construction
    30 Installation Manual
    Notice
    •Even when the elite Panaboard has been placed 
    on the up/down unit, it has still not been secured 
    in place. If any attempt is made to lift the elite 
    Panaboard in this state, it may become 
    disengaged from the up/down unit so do not lift it 
    until it has been secured loosely.
    3Loosely secure the elite Panaboard to the up/
    down unit
    •Remove the lower frame cover centered at the 
    bottom of the elite Panaboard. Align the wall 
    mount holes on the bottom of the board 
    attachments with the left and right positions of 
    the board bottom bracket (loosely secured to the 
    up/down unit) and loosely secure them using the 
    board mounting screws (5, one on each side).
    •Depending on the model of elite Panaboard, the 
    lower frame cover is removed differently and 
    screws are in different positions. Refer to the 
    Operating Instructions of the relevant elite 
    Panaboard.
    For UB-T880
    4After removing the up/down locking plates 
    attached to both sides of the up/down unit, secure 
    the elite Panaboard at the highest position.
    •The up/down locking plates are secured using 
    screws. When removing them, remove the 
    screws. After mounting the plates the other way 
    round, tighten the screws again to secure them.
    •Lift the elite Panaboard to the highest point and 
    secure it with the safety brake.
    Notice
    •At this stage, compensation for board weight is not 
    possible, and if a UB-T880W is mounted, it will 
    gradually shift downward from the highest point. Also 
    be aware that if a UB-T780, UB-T781, or UB-T780BP 
    is mounted, it will gradually shift upward.
    •When disposing of the system, be aware that the 
    up/down unit may spring up when the elite 
    Panaboard is removed from the up/down unit.
    •At the time of shipment, the position was set for 
    the UB-T880. When using a model other than 
    the UB-T880, adjust the position of the up/down 
    unit by taking the following steps.
    •UB-T880: Refer to “Mounting the elite 
    Panaboard” (page 33).
    5Remove the loosely secured board mounting 
    screws ( 5) and temporarily take the elite 
    Panaboard off of the up/down unit.
    •Confirm that the position of the arm 450 is shown 
    in the figure below.
    Lower Frame Cover
    Board Mounting Screw ( 5)
    Up/Down Locking Plate
    Arm 450
    UE-608030_EN.book  30 ページ  2010年10月28日 木曜日 午後4時20分 
    						