Home
>
Panasonic
>
Electronic Accessory
>
Panasonic Up/Down Wall Mount Kit, Up/Down Stand Kit UE-608030, UE-608031, UE-608032 Operating Instructions
Panasonic Up/Down Wall Mount Kit, Up/Down Stand Kit UE-608030, UE-608031, UE-608032 Operating Instructions
Have a look at the manual Panasonic Up/Down Wall Mount Kit, Up/Down Stand Kit UE-608030, UE-608031, UE-608032 Operating Instructions online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 10737 Panasonic manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
Wall Mounting Construction21 Installation Manual Notice •Ensure that the installation strength is at least as great as the specified pull-out strength of the anchors which is 5,197.5 N [530 k gf]. •Use the values recommended by the manufacturer of the anchors used for the depth to which the anchors are to be embedded in the wall. •Use M8 bolts when the anchors have internal screw threads. •Ensure that the length of the M8 bolts provides an interfitting length of at least 1.5 times the bolt diameter. (diagram at right) •Ensure that the M8 bolts do not strike the bottoms of the anchors, and check that they have been tightened up securely. •Recommended tightening torque: 12.5 N•m (127 k gf•cm) For tightening purposes, use a torque driver whose torque can be specified. II.When the Wall is not a Principal Structural Component Check the structure of the wall backing materials. If the following conditions are not satisfied, consult with a building contractor, and proceed with installation after having reinforced the wall so that it does meet the conditions. •For the wall backing materials, use wood materials measuring at least 50 mm × 75 mm (131/32in. × 215/16in.) equivalent to the ones given in the table below or metal stands or other such parts with at least the equivalent strength. •The maximum distance between the wall backing materials must be 910 mm (2 ft. 1113/16in.). Long-Term Allowable Unit Stress of Wood Materials (k g/cm 2) Compressive strength Tensile strengthFlexural strengthShearing strength Coniferous trees Japanese red pine, Douglas fir 75 60 95 8 Japanese larch, Japanese cypress, “Hinoki” cypress 75 60 95 8 Hemlock, Western hemlock65 50 85 7 Japanese fir, Sakhalin fir, Japanese cedar 60 45 75 6 Broad- leaved trees Evergreen oak90 80 130 14 Japanese chestnut, Oak, Japanese beech 70 60 100 10 At least 1.5 times the bolt diameter M8 Bolt Sp r i ng Was he r Anchor (internal thread) Flat Washer (max. diameter of 16 mm [5/8in.]) Installation Surface Inside Wa l l* Wall Backing Materials * The term “Inside Wall” refers to the wall surface inside a room. min. 75 mm (215/16in.) max. 910 mm (2 ft. 1113/16in.) min. 50 mm (131/32in.) UE-608030_EN.book 21 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction 22 Installation Manual If the wall backing materials are not principal structural components, they must be reinforced as below. Install the reinforcing material onto the wall backing materials. If the distance between the wall backing material is not less than 910 mm (2 ft. 11 13/16in.), use a material whose strength is equivalent to the backing materials and add extra backing materials so that the distance is made less than 910 mm (2 ft. 1113/16in.). *Use a material whose strength is equivalent to steel (SPCC t=3) for the metal plate and provide it with a rust-preventive coating. Other Parts Required M8 Bolt × 4 (Select the bolts with the length appropriate for the wall structure.), Spring Washer × 8 Flat Washer (max. diameter of 16 mm [ 5/8in.]) × 8, Lock Nut × 8 •Use N50 nails with a maximum pitch of 150 mm (529/32in.) to connect the reinforcing material with the backing materials. •When doing this work, station at least one individual on the room interior side and another individual on the wall backing material side, and tighten the bolts securely. Prohibited Action: Do NOT do the following work. •Do not provide reinforcement where the wall backing materials and reinforcing material are not interconnected. Otherwise, there is a danger that the unit will fall off the wall. •Recommended tightening torque of M8 nuts: 12.5 N•m (127 k gf•cm) For tightening purposes, use a torque wrench which can specify the torque. •To prevent the nuts from becoming loose, use double nuts or similar nuts for the reinforcing material. Reinforcing Material (Board) - - - 1Square Timber - - - - 2 Metal Plate* - - - - - - 2Wall Backing Material 1820 mm (5 ft. 11 21/32 in.) 600 mm (1ft. 11 5/8 in.) 81 mm(3 3/16 in.) 438 mm (1ft. 5 1/4 in.) 435 mm (1 ft. 5 1/8 in.) 951 mm (3 ft. 1 7/16 in.) 12 mm (15/32 in.) 9 mm (11/32 in.) in dia. X Y 81 mm (3 3/16 in.) 9 mm (11/32 in.) in dia. 438 mm (1ft. 5 1/4 in.) 600 mm (1ft. 11 5/8 in.) 30 mm (1 3/16 in.) 9 mm (11/32 in.) in dia. 438 mm (1ft. 5 1/4 in.) 500 mm (1ft. 7 11/16 in.) 31 mm (1 7/32 in.) X Y Double Nut (Lock Nut)Metal Plate Flat WasherSp r i ng Was he r N50 Nail with max. pitch of 150 mm (529/32in.) Flat Washer (max. diameter of 16 mm [5/8in.]) Spring Washer Inside Wall Square Timber Reinforcing Material (Board) Wa l l Backing Material 910 mm (2 ft. 11 13/16in.) 910 mm (2 ft. 1113/16in.) Reinforcing Material (Board) Wall Backing Material Inside Wall UE-608030_EN.book 22 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction23 Installation Manual III.When the Principal Structural Components are in Close Proximity to the Wall Backing Materials (when there is no distance between the backing materials and principal structural components) •Dimension “X” must not be more than 170 mm (611/16in.). If this maximum is exceeded, consult with a building contractor and take the steps to ensure that the reinforcing work at least equivalent to what was described in sections I and II above is carried out. •Locate a place where there are no backing materials, and make cutouts in the inside wall to accommodate the mounting of the M8 anchors. Refer to the figure at the top right for the specific dimensions of the cutouts. (W: 30 mm × H: 30 mm [W: 1 3/16in. × H: 13/16in.]) Other Parts Required Anchor × 4, M8 Bolt × 4, Spring Washer × 4, Flat Washer (max. diameter of 16 mm [ 5/8in.]) × 4 •Dimension “X” is the distance from the principal structural component to the inside wall. Install the anchors all the way through to the principal structural component as above. For details on installing the anchors, refer to “ I.When the Wall is a Principal Structural Component (a concrete wall which is at least 120 mm [43/4in.] thick) ”(page 20). Ensure that the installation strength is at least as great as the specified pull-out strength of the anchors which is 5,197.5 N [530 k gf]. IV.When the Wall Structure is Other than the Ones Covered in Sections I to III Provide reinforcement at least equivalent to that in section II, and install the up/down unit. X Backing Materials Concrete or Other Principal Structural Component X 951 mm (3ft. 1 7/16 in.) 30 mm (1 3/16 in.) 910 mm (2ft. 11 13/16 in.) 910 mm (2ft. 11 13/16 in.) 438 mm (1ft. 5 1/4 in.) 30 mm (1 3/16 in.) Inside Wall Concrete or Other Principal Structural Component Backing Materials X Inside wall M8 Anchor Backing Materials Square Timber Spring Washer 910 mm (2 ft. 1113/16in.)910 mm (2 ft. 1113/16in.) Flat Washer (max. diameter of 16 mm [5/8in.]) Principal Structural Component9.0 mm (11/32 in.) in dia. 30 mm (1 3/16 in.) 30 mm (1 3/16 in.) X Square Timber × 4 Indoor Side UE-608030_EN.book 23 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction 24 Installation Manual Mounting and Securing the Up/Down Unit 1Hang the up/down unit on the wall again. 2Take the steps below to secure the up/down unit. 1Pass one M8 bolt through the bottom hole in the stay L75 pipe on the left, and use it to secure the up/down unit. 2Pass another M8 bolt through the bottom hole in the stay drum 75 pipe on the right, and use it to secure the up/down unit. 3Tighten the M8 bolts in the top holes of the left and right pipes, and fasten the up/down unit securely to the wall. After mounting the up/down unit on the wall, pull the unit toward you, and check that the wall-mounting bolts are fastened completely. Notice •To ensure safety, do this work with another individual without fail. Preparing to Mount the Projector Shown below are the projector models which can be secured to the projector bracket. Use the spacers, bushings and screws at the positions shown for each model, and fasten the projector securely. (Projector models supported as of May 2010) Bolts Bolts Stay L75 Pipe Stay Drum 75 Pipe Panasonic PT-ST10 SANYO LP-WXL46(S) EPSON EB-410W Optoma EX525ST BenQ MP772ST MP776ST MP782ST Acer S1200 UE-608030_EN.book 24 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction25 Installation Manual Notice •When mounting a projector other than a SANYO model onto the projector bracket, mount it with the adjustment feet on the bottom of the projector retracted. •Follow the steps below to mount a SANYO model. 1Extend the two adjustment feet by pulling them out. 2Pass the adjustment feet through hole A in the projector bracket. 3Move the projector bracket, move the adjustment feet of the projector to the positions shown in the figure below, then align the positions of the spacers with the holes for fastening the projector, and use the screws to fasten the projector. 4Retract the adjustment feet. 1Secure the spacers ( A) and bushings (B) used to secure the projector through the holes to be used for the projector model concerned on the projector bracket in such a way that the bracket is sandwiched between the spacers and bushings. •The spacers ( A) used to secure the projector are secured in the holes whose positions are indicated by the initial of the projector brand. 2Align the attached spacers with the holes used to suspend the bottom panel of the projector, and secure them using the screws ( C)* for securing the projector. * For an Acer projector, use the screws ( I) for securing the projector (for Acer) instead. Adjustment Feet Screw Fastening Positions Hole A Initial Projector model name No. of spacers “P” Panasonic PT-ST10 3 “S” SANYO LP-WXL46(S) 5 “E” EPSON EB-410W 5 “O” Optoma EX525ST 4 “A” Acer S1200 3 “B” BenQ MP772ST MP776ST MP782ST3 Bushing for Securing Projector ( B) Spacer for Securing Projector ( A) Screw for Securing Projector (C)* Bushing for Securing Projector ( B) Spacer for Securing Projector (A) UE-608030_EN.book 25 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction 26 Installation Manual 3Align the projector sub-bracket so that the projector fits in between, and secure both ends using the toothed washers (J) and the screws ( D) for securing the projector sub-bracket. Notice •Align the projector sub-bracket so that it supports the projector, leaving no gaps. Fasten the sub- bracket securely to the projector on both sides using the toothed washers ( J ) and screws ( D ) for securing the projector sub-bracket. 4Attach the screw ( F) for securing the pipe bracket to the pipe bracket ( E), and secure the pipe bracket to the projector bracket. Mounting the Projector Arm 1Pass the power cable used for the projector and the video cable through the projector arm. Notice •Ensure that the plugs to connect to the projector come out at the longer end of the projector arm (the part where the projector is mounted). •If the outlet end of the power cable is too large to go through the projector arm, the projector arm cannot be mounted on the up/down unit. Pass a length of string (twine) through the projector arm, and then pass the cable with the string attached to it through the projector arm after the arm has been mounted on the up/down unit. 2Decide on the position of the knob provided on the rear on the projector arm, and fasten it tightly. For SANYO LP-WXL46(S) Projector Sub-Bracket Screw for Securing Projector Sub- Bracket ( D) Toothed Washer for Securing Projector Sub-Bracket (J) Pipe Bracket (E) Screw for Securing Pipe Bracket (F) 2 to 3 mm (3/32 to 1/8in.) Projector End (longer) Power Outlet End (shorter) Top position Center position Knob (Bottom position) Hole for Securing Projector Arm (Use when moving the stand) UE-608030_EN.book 26 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction27 Installation Manual •The position where the knob is to be secured depends on the projector which is going to be used. Notice •Keep the other knob for future use. After all installation work is finished, attach the knob to an empty hole on the board bracket ( 7 ) on the back of the board. 3Insert the projector arm from above into the pipe holding post of the up/down frame. •Introduce the ends of the power cable and video cable which have already been passed through the projector arm into the pipe holding post, and then insert the projector arm. Notice •When mounting the projector arm, ensure that its end does not hit anybody or anything in the vicinity. 4Mount the projector bracket, on which the projector unit has been mounted, onto the projector arm. •The position where the projector is to be mounted depends on the model which is going to be used. Adjust the distance from the longer end of the projector arm (the part where the projector is mounted) to the projector bracket to what is indicated below, and secure the projector. 5Tighten up the screw ( F) for securing the pipe bracket, and loosely secure the bracket to the projector arm. Top position Panasonic PT-ST10 Center position EPSON EB-410W Acer S1200 BenQ MP772ST / MP776ST / MP782ST Bottom position SANYO LP-WXL46(S) Optoma EX525ST Pipe Hold Post ModelA Panasonic PT-ST10 22 cm (8 21/32in.) EPSON EB-410W 6 cm (2 3/8in.) Acer S1200 8 cm (3 5/32in.) BenQ MP782ST 8 cm (3 5/32in.) BenQ MP772ST / MP776ST4cm (19/16in.) SANYO LP-WXL46(S) 4 cm (1 9/16in.) Optoma EX525ST 8 cm (3 5/32in.) A Screw for Securing Pipe Bracket ( F) UE-608030_EN.book 27 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction 28 Installation Manual 6Route and connect the power cable and video cable, which have already been passed through the projector arm, to the projector, and secure the pipe cap (G) using the screw (H) for securing the pipe cap. 7Attach cable holder A (1) to the center wall side of the lift bottom stay, and route the power cable and video cable so that they point straight down. •Use cable holder B ( 2 ) for cable management of the elite Panaboard and other equipment. •Use the hook and loop fastener ( 3 ) for cable management of the computer on the table and cords connected to the plug adaptor. Adjusting the Up/Down Unit Align the position of the hold tube assembly, to which the gas spring is secured, with the elite Panaboard model to be installed, and set it. •Adjustment Tolerance: d 1 Pipe Cap ( G) Screw for Securing Pipe Cap ( H) Cable Holder A (1 ) Lift Bottom Stay Model No.Adjustment PositionModel No.AdjustmentPosition UB-T880W 9 UB-T781 2 UB-T880 7 UB-T780 1.5 UB-T781W 2.5 UB-T780BP1 Hold Tube Assembly M6 189 Screw Arm 450 Gas Spring Adjustment Position UE-608030_EN.book 28 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction29 Installation Manual 1Loosely secure the board bottom bracket to the position shown below. •In the state the UB-T880 is shipped, the position where the board bottom brackets are secured is appropriate when using the SANYO LP-WXL46(S). The position where the bottom of the elite Panaboard is to be secured differs depending on the type of elite Panaboard to be installed. Note •The position at which the board bottom bracket is to be fixed applies to the SANYO LP-WXL46(S) projector. When any other projector is going to be used, move it from the position shown above by the dimensions given below. 2Mount the elite Panaboard on the up/down unit. •Attach the board brackets ( 7) to the left and right board attachments on the rear side of the elite Panaboard using screws ( 6) for securing each board bracket. •Attach the lower-left bracket to the left side (outer side) of the left board attachment. Similarly, attach the lower-right bracket to the left side (inner side) of the right board attachment. •With the help of another individual, take hold of the elite Panaboard, align it so that the board bottom bracket and the part for securing the elite Panaboard wall amount are aligned, and suspend the elite Panaboard at that position. Model No.AB UB-T880W UB-T880 344.5 mm (1 ft. 1 9/16in.) 389 mm (1 ft. 35/16in.) UB-T781W 156 mm (6 1/8in.) 200 mm (77/8in.) UB-T781 UB-T780 UB-T780BP 94 mm (3 11/16in.) 262 mm (105/16in.) AB Panasonic + 147 mm (+ 5 25/32in.) – 147 mm (– 525/32in.) EPSON + 157 mm (+ 6 3/16in.) – 157 mm (– 63/16in.) BenQ + 145 mm (+ 5 23/32in.) – 145 mm (– 523/32in.) Acer + 182 mm (+ 7 5/32in.) – 182 mm (– 75/32in.) Optoma + 178 mm (+ 7 in.) – 178 mm (– 7 in.) AB Board Bottom Brackets Board Attachments Board Brackets ( 7) Board Brackets Fastening Screws ( 6) UE-608030_EN.book 29 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction 30 Installation Manual Notice •Even when the elite Panaboard has been placed on the up/down unit, it has still not been secured in place. If any attempt is made to lift the elite Panaboard in this state, it may become disengaged from the up/down unit so do not lift it until it has been secured loosely. 3Loosely secure the elite Panaboard to the up/ down unit •Remove the lower frame cover centered at the bottom of the elite Panaboard. Align the wall mount holes on the bottom of the board attachments with the left and right positions of the board bottom bracket (loosely secured to the up/down unit) and loosely secure them using the board mounting screws (5, one on each side). •Depending on the model of elite Panaboard, the lower frame cover is removed differently and screws are in different positions. Refer to the Operating Instructions of the relevant elite Panaboard. For UB-T880 4After removing the up/down locking plates attached to both sides of the up/down unit, secure the elite Panaboard at the highest position. •The up/down locking plates are secured using screws. When removing them, remove the screws. After mounting the plates the other way round, tighten the screws again to secure them. •Lift the elite Panaboard to the highest point and secure it with the safety brake. Notice •At this stage, compensation for board weight is not possible, and if a UB-T880W is mounted, it will gradually shift downward from the highest point. Also be aware that if a UB-T780, UB-T781, or UB-T780BP is mounted, it will gradually shift upward. •When disposing of the system, be aware that the up/down unit may spring up when the elite Panaboard is removed from the up/down unit. •At the time of shipment, the position was set for the UB-T880. When using a model other than the UB-T880, adjust the position of the up/down unit by taking the following steps. •UB-T880: Refer to “Mounting the elite Panaboard” (page 33). 5Remove the loosely secured board mounting screws ( 5) and temporarily take the elite Panaboard off of the up/down unit. •Confirm that the position of the arm 450 is shown in the figure below. Lower Frame Cover Board Mounting Screw ( 5) Up/Down Locking Plate Arm 450 UE-608030_EN.book 30 ページ 2010年10月28日 木曜日 午後4時20分