Have a look at the manual Panasonic Up/Down Wall Mount Kit, Up/Down Stand Kit UE-608030, UE-608031, UE-608032 Operating Instructions online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 10737 Panasonic manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
Wall Mounting Construction31 Installation Manual 6Confirm that the M6 189 bolt and nuts A and B are in the correct positions. (The direction of rotation in instructions is relative to the part being adjusted as viewed from above.) 7Holding nut B in place with a 10 mm (13/32in.) wrench, use another wrench to loosen nut A (counterclockwise), and then move the nut about 1 mm ( 1/16in.) (1). 8Holding nut B in place with a 10 mm (13/32in.) wrench, use another wrench to turn the M6 189 screw clockwise, and then move nut B about 1mm (1/16in.) ( 2 ). 9Holding nut B in place with a 10 mm (13/32in.) wrench, use another wrench to turn nut A clockwise, and then tighten nuts A and B ( 3 ). M6 189 ScrewNut A Nut B “–” side “+” side “+” side (Clockwise)“–” side (Counterclockwise) Hold Tube Assembly Nut A Nut B 1 Hold Tube Assembly M6 189 Screw Nut B 2 Nut A Nut B 3 UE-608030_EN.book 31 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction 32 Installation Manual 10Turn the head of the M6 189 screw with a 10 mm (13/32in.) wrench (ratchet type) and reposition the hold tube assembly to the adjustment position for the model to be mounted ( 4 ). (Example: When mounting a UB-T880W, turn the M6 189 screw clockwise with a 10 mm [13/32in.] wrench [ratchet type] and reposition the assembly from adjustment position 7 [as shipped] to adjustment position 9.) Note •When the hold tube assembly is moved toward the “+” side of the arm 450, the load which can be supported by the arm assembly is increased. (When the UB-T880W is installed) •Conversely, when the hold tube assembly is moved toward the “–” side of the arm 450, the load which can be supported by the arm assembly is reduced. (When the UB-T781, UB-T781W, UB-T780 or UB-T780BP is installed) 11Holding nut B in place with a 10 mm (13/32in.) wrench, use another wrench to loosen nut A (counterclockwise, 5 ). 12Holding nut B in place with a 10 mm (13/32in.) wrench, use another wrench to turn the M6 189 screw counterclockwise. Tighten the screw until nut B is secure ( 6 ). 13Holding nut B in place with a 10 mm (13/32in.) wrench, use another wrench to turn nut A clockwise, and then tighten nuts A and B ( 7 ). 14Mount the elite Panaboard on the up/down unit again. M6 189 Screw “–” side “+” side Hold Tube Assembly “+” side “–” side10 mm ( 13/32in.) wrench (ratchet type) Arm 450 Nut A Nut B 5 Nut B 6 M6 189 Screw 7 Nut B Nut A UE-608030_EN.book 32 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction33 Installation Manual Mounting the elite Panaboard 1Align the wall mount holes on the bottom of the board attachments with the left and right positions of the board bottom bracket (loosely secured to the up/down unit) and secure them tightly using the board mounting screws ( 5 , two on each side). For UB-T880 2Try drawing the elite Panaboard toward you, and check that the elite Panaboard is fastened securely to the up/down unit. •Confirm that the elite Panaboard is securely attached and does not move freely back and forth. Checking the Up/Down Operations •Confirm that the up/down part can easily be lifted higher than the pin end stopper. •Confirm that the up/down part does not drop more than 20 cm (77/8in.) of its own accord when released from the highest point. At this stage, check up/down operations, and if they are not balanced, remove the elite Panaboard and readjust the up/down unit. •Check that none of the cables are stretched to their full length or sandwiched when the up/down operations are performed. Lower Frame Cover Board Mounting Screws (5) UE-608030_EN.book 33 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction 34 Installation Manual Wiring Connections 1Position the computer which you are going to use at the prescribed location, and connect the computer, projector and elite Panaboard as shown below. 2Connect the power cables of the computer, projector and elite Panaboard to the table tap, and connect the plug of the table tap to the power outlet. Apply the High-Temperature Warning Label 1Turn on the power of the computer, projector and elite Panaboard in this order. 2Apply the high-temperature warning label to the projector sub-bracket. •When projector vents face the right or left side, the projector sub-bracket may become hot. On the bracket by projector vents , apply the high- temperature warning label ( K ), as shown in the figure. Projector Power Cable 1 Video Cable elite Panaboard Power Cable 2 Computer Power Cable 3 USB Cable Video Cable High-Temperature Warning Label ( K ) UE-608030_EN.book 34 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction35 Installation Manual Projection Adjustments 1Project an image from the projector onto the screen of the elite Panaboard. 2Adjust the projected image’s size and projection position and eliminate trapezoidal distortion. ∫ Adjusting the Image Size If projected images are too big or small, adjust the projector so that the image height is slightly smaller than the vertical area on the screen for image projection. If the image size cannot be adjusted using the projector’s controls, move the position of the projector bracket which was secured in “Mounting the Projector Arm” (step 4 on page 27) to adjust the image size. Note •Depending on the projector used, it may not be possible to fill the screen perfectly with projected images. ∫ Adjusting the Left and Right Positions of the Images Projected on the elite Panaboard After the height of the projected image has been adjusted, check the left and right positions of the image which is projected on the screen. If the projected image markedly overlaps the frame on the right or the ultrasonic sensor on the left, return to “Mounting the elite Panaboard” (page 33), and adjust the position of the elite Panaboard. ∫Adjusting the Projection Position If the image of the projector is projected too far toward the top or bottom, turn the knob on the projector bracket, and adjust. ∫Eliminating Trapezoidal Distortion Tilt the projector bracket to the left or right, and adjust it so that the left and right vertical lines of the projected image have the same length. Use the image adjustment functions of the projector to eliminate the trapezoidal distortion of the projected images so that the projected images are rectangular. Knob UE-608030_EN.book 35 ページ 2010年10月28日 木曜日 午後4時20分
Wall Mounting Construction 36 Installation Manual Securing the elite Panaboard 1Tighten the two-wing bolts used to secure the board bottom bracket, and secure the elite Panaboard position. 2Mount the lower frame cover of the elite Panaboard onto the center bottom part. Checking the Operations of the elite Panaboard For details of cleaning the screen and checking the operations of the elite Panaboard, refer to the Operating Instructions of the elite Panaboard. Two-wing Bolts Lower Frame Cover UE-608030_EN.book 36 ページ 2010年10月28日 木曜日 午後4時20分
Assembling the Stands37 Installation Manual Assembling the Stands Assembling the Stands Assembling the Stand Table Unit 1Take the left stand and right stand out of the stand unit box, and use the three bolts and collars for each stand to secure the stands. •As shown below, with the bottom of the up/down unit taken out of the packing box, remove the up/down unit’s three bolts and collars each for the left and for the right. (Spread cushioning material under the up/down unit to adjust the height.) * The bolts and collars which have been removed are not used. •Loosely secure the left stand and right stand to the up/down unit using the bolts ( 8) for securing the left and right stands provided, the flat washers and spring washers which were removed, and the collars ( 9) for securing the left and right stands. Notice •Mount the stands with the sides provided with the locking casters pointed upward. 2Tighten bolts A. •Use a 4 mm (5/32in.) allen key to tighten bolts A, and secure the stand part and the up/down unit. Right Stand Left Stand Up/Down Unit Packing Box Flat Washer Bolt * Collar * Sp ri n g Wa s he r Flat Washer Sp r i ng Was he r Collar for Securing Left and Right Stands ( 9) Bolt for Securing Left and Right Stands ( 8) Bolt A Bolt A UE-608030_EN.book 37 ページ 2010年10月28日 木曜日 午後4時20分
Assembling the Stands 38 Installation Manual 3Pull up the pipe part of the stand by hand while tightening bolts B and C in this order. Notice •Take hold of the pipe part of the stand and, with the up/down unit pulled up, tighten the bolts. Right Stand Left Stand 4Tighten up bolts A, B and C securely. 5After attaching the left and right stands, place the assembled parts upright, and check that there is no play either at the front or back or at the left or right. •If there is any play in the stand after the assembled parts have been placed upright, slightly loosen the three bolts each at the left and right, adjust so that the play in the stand is eliminated, and then tighten up the bolts again. 6Secure the table plate between the left and right stands. •Tip the table as you insert it between both sides of the stand. Align the table with the position of the bolt holes, and then tighten the bolts. Notice •Securely tighten the bolts ( 8) for securing the left and right stands using a force of 5.2 N • m d0.5 N • m (53 k gf•cm d5k gf•cm). 7Attach the foot reinforcing assemblies. •Rotate the casters so that the caster bodies are turned toward the inside. While taking hold of the release levers on the foot reinforcing assemblies, insert the assemblies into the stand, and align the pins with the holes in the base. Bolt B Bolt C Bolt B Bolt C Bolt for Securing Table Plate () Flat Washer for Securing Table Plate (?) Collar for Securing Table Plate ( =) Nut for Securing Table Plate (@) Pin Foot Reinforcing Assembly UE-608030_EN.book 38 ページ 2010年10月28日 木曜日 午後4時20分
Assembling the Stands39 Installation Manual Preparing to Mount the Projector → Refer to “Preparing to Mount the Projector” (page 24) under “Wall Mounting Construction”. Mounting the Projector Arm →Refer to “Mounting the Projector Arm” (page 26) under “Wall Mounting Construction”. Adjusting the Up/Down Unit →Refer to “Adjusting the Up/Down Unit” (page 28) under “Wall Mounting Construction”. Mounting the elite Panaboard →Refer to “Mounting the elite Panaboard” (page 33) under “Wall Mounting Construction”. Checking the Up/Down Operations →Refer to “Checking the Up/Down Operations” (page 33) under “Wall Mounting Construction”. Wiring Connections →Refer to “Wiring Connections” (page 34) under “Wall Mounting Construction”. Apply the High-Temperature Warning Label →Refer to “Apply the High-Temperature Warning Label” (page 34) under “Wall Mounting Construction”. Projection Adjustments →Refer to “Projection Adjustments” (page 35) under “Wall Mounting Construction”. Securing the elite Panaboard →Refer to “Securing the elite Panaboard” (page 36) under “Wall Mounting Construction”. Attaching the Protective Cover Attach the protective cover to the rear surface as shown in the diagram below. •To mount the protective cover, pass the screws ( :) for securing the protective cover through the flat washers ( ;) for securing the protective cover. Then use the screws to secure the cover. Securing the Up/Down Stand Kit When using the system with the up/down stand kit, the system may fall over if a child should hang or swing from the projector arm, for example. After deciding where the system will be used, to prevent tipping, drive the anchors into the floor and secure the rear foot reinforcing assemblies with M8 bolts before use. 1Move the assembled up/down stand kit to the place where the system will be used, and decide on where it is to be anchored. 2On the floor, mark off the hole positions made at the centers of the rear foot reinforcing assemblies, and move the up/down stand kit aside. 3Drill two holes in the floor using a drill. 4Secure the anchors in the holes. 5Return the up/down stand kit to where it is to be anchored, and secure the rear foot reinforcing assemblies using the M8 bolts with flat washers and spring washers attached to them. Note •The specified pull-out strength is required per anchor. M8 anchor bolts are used. Specified pull-out strength: 5,197.5 N (530 k gf) •When the floor is not concrete, reinforce the floor so that it can support the up/down stand kit. Checking the Operations of the elite Panaboard For details of cleaning the screen and checking the operations of the elite Panaboard, refer to the Operating Instructions of the elite Panaboard. Protective Cover UE-608030_EN.book 39 ページ 2010年10月28日 木曜日 午後4時20分