Nitsuko 24i/28i/124i/384i Hardware Manual
Here you can view all the pages of manual Nitsuko 24i/28i/124i/384i Hardware Manual. The Nitsuko manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 181
3. Installing Extensions and Trunks3-3 INSTALLING 25-PAIR CABLES Installing Trunk Cross-Connect Blocks It is also recommended to install cross-connect blocks for each of the systems major trunk device groups. Cross-connect blocks provide an easy way to troubleshoot, determine port identification numerically, and determine trunk port utilization. All major trunk port devices must be bridged from the RJ21X to trunk cross connect blocks in groups of eight (16 pins). Each 24FU trunk filter unit interfaces...
Page 182
3. Installing Extensions and Trunks 3-4 INSTALLING EXTENSIONS Key Extension Cabling (Figure 3-2) Each key extension requires one-pair twisted station cable from the MDF to the modular jack. A maximum of 48 extensions can be installed per 50-pin connector on each 48FU filter unit. To connect key station cabling: 1. Punch down one pair 24 AWG station cable for each key telephone to a cross-connect block. 2. Run one-pair cross-connect from the cross-connect block to the extension (B) block for each...
Page 183
3. Installing Extensions and Trunks3-5 INSTALLING SINGLE LINE TELEPHONES Single Line Extension Cabling Each single line extension requires one-pair twisted station cable from the MDF to the modular jack. A maximum of 48 extensions can be installed per 50-pin connector on each 48FU. A 90-105 VAC ring generator must be connected to the Main Cabinet to provide ringing to single line sets. To connect station cabling: 1. Punch down one pair 24 AWG station cable for each single line telephone to a...
Page 184
3. Installing Extensions and Trunks 3-6 EXTENSION CUTDOWN SHEET Extension Cutdown Sheet Configuration (Figure 3-4 and 3-5) Due to the inherent flexibility of the universal PCB slot configura- tion, standard cutdown sheets for extension cabling do not apply. Note:The order that the extension PCBs (8/16ASTU, 16DSTU) are installed determines the assigned extension number. For example, given that a 16DSTU is installed in slot #1 and uses extension numbers 301-316, if three 16D/ASTU PCBs were installed in...
Page 185
3. Installing Extensions and Trunks3-7 EXTENSION CUTDOWN SHEET Figure 3-4 EXTENSION CUTDOWN SHEET Figure 3-5 SAMPLE EXTENSION CUTDOWN SHEET CONN PIN 48 FU CN4 48 FU CN1 CN1BLOCK TERMCOLOR CODEPCB ID FUNCTION26 1 27 2 28 3 29 4 30 5 31 6 32 7 33 81 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16WHT-BLU BLU-WHT WHT-ORN ORN-WHT WHT GRN GRN-WHT WHT-BRN BRN-WHT WHT-SLT SLT-WHT RED-BLU BLU-RED RED-ORN ORN-RED RED-GRN GRN-RED PLACE STICKER HERE 16 DSTU LOWER Station Block B1 B1 48 FU1EXP 1 MAIN MAIN EXP 2 48 FU2 48...
Page 186
3. Installing Extensions and Trunks 3-8 INSTALLING CO/PBX LINES Ground Start/Loop Start Line Cabling Ground start trunks/loop start lines must be bridged from the telco RJ21X to a line cross-connect block (A). Each ground/loop start CO/PBX line requires one-pair cross-connect cable from the RJ21X to the line (A) block. The A block connects to the 24FU filter unit with a 25 pair cable. The line (A) block(s) should be arranged in groups of 8 lines (16 pins) to correspond to the 24FU PCB, filter cable...
Page 187
3. Installing Extensions and Trunks3-9 INSTALLING CO/PBX LINES Figure 3-6 TYPICAL TRUNK/LINE INSTALLATION Figure 3-7 INSTALLING GROUND START TRUNK/LOOP START LINES 24FU PCB Bridging Clips 8 Loop Start Lines 8 Ground Start Trunks 8 Loop Start LinesOne-Pair Xconnect Filter Cable8ATRU-LS1 8ATRU-LSI 8ATRU-LS1GSAU 92000 - 207 CN1RUN BLK CN1RUN BLK CN1RUN BLK Line A Block Telco RJ21X 25-Pair Cable Loop Start Lines 1-8 Loop Start Lines 17-24 Ground Start Trunks 9-16 Bridging Clips Bridging Clips8 Loop Start...
Page 188
3. Installing Extensions and Trunks 3-10 INSTALLING DID TRUNKS DID Trunk Description Direct Inward Dialing trunks must be bridged from the telco RJ21X to a line cross-connect (A) block. Each DID Trunk requires one- pair cross-connect from the RJ21X to the line (A) block. The A block connects to the 24FU filter unit with a 25-pair cable. The line (A) block should be arranged in groups of 4 DID trunks (8 pins) to correspond with the 24FU PCB, filter cable, and cabinet slot equipped with a 4ATRU-LD1....
Page 189
3. Installing Extensions and Trunks3-11INSTALLING TIE LINES Tie Line Description Tie lines (Type I E&M 4-conductor) must be bridged from the telco RJ21X to a line cross-connect (A) block. Each tie line requires two- pair cross-connect from the RJ21X to the line (A) block. The A block connects to the 24FU filter unit with a 25-pair cable. The line (A) block must be arranged in groups of 4 tie lines (16 pins) to correspond with the 24FU PCB, filter cable, and cabinet slot equipped with a 4ATRU-EMI....
Page 190
3. Installing Extensions and Trunks 3-12 LINE/TRUNK CUTDOWN SHEET CO/PBX Line Cutdown Sheet Configuration (Figures 3-10 and 3-11) Due to the flexibility of the system universal PCB slot configu- ration, standard cutdown sheets for CO/PBX line cabling do not apply. Note:The order in which the 8ATRU PCBs are installed determines the assigned line circuit number. For example, if four 8ATRUs are installed in the Main Cabinet in the following order, the following numbering plan would be in effect: To...