Nitsuko 24i/28i/124i/384i Hardware Manual
Here you can view all the pages of manual Nitsuko 24i/28i/124i/384i Hardware Manual. The Nitsuko manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 2
Hardware Manual 1. Installing Cabinets 2. PCB Installation and Startup 3. Installing Extensions and Trunks 4. Optional Equipment 5. Data and SMDR 6. Specifications and Parts 28i/124i
Page 4
1. Installing Cabinets1-1 In this section . . . . . . . . . . . . . . . . Page Installing the Cabinets . . . . . . . . . . . . . . . .1-3 Unpacking . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 Before Installing . . . . . . . . . . . . . . . . . . . . . . . 1-3 Site Requirements. . . . . . . . . . . . . . . . . . . . . . 1-3 Removing the 28i Covers . . . . . . . . . . . . . . . . 1-4 Mounting the 28i Cabinets . . . . . . . . . . . . . . . 1-4 Removing the 124i Covers . . . . . . . . . . . ....
Page 5
1. Installing Cabinets1-3 Unpacking Unpack the equipment and check it against your equipment lists. Inspect for physical damage. If you are not sure about a compo- nent’s function, review the Product Description Manual. Contact your Sales Representative if you have additional questions. Have the appropriate tools for the job on hand, including: a test set, a punch down tool and a digital voltmeter. Before Installing Make sure you have a building plan showing the location of the common equipment,...
Page 6
1. Installing Cabinets 1-4 Removing the 28i Cover(Figure 1-1) To make installation easier, remove the cover on the KSU. 1. Unscrew the two captive screws on the front of the cabinet cover. 2. Lift up slightly on the front of the cover – then gently slide the cover back to remove it. Figure 1-1 REMOVING THE 28i COVER Mounting the 28i Cabinet(Figure 1-2) 1. Using the screws provided, attach the metal bracket to the Main Distribution Frame (MDF) plywood backboard. Mount the bracket in a convenient...
Page 7
1. Installing Cabinets1-5 Removing the 124i Covers(Figure 1-3) To make wall-mounting easier, remove the cover on each com- mon equipment cabinet. This allows you to use the cabinets as a mounting template. 1. Unscrew the two captive screws on the right side of the cabi- net cover. 2. Lift up the right side of the cover — then slide the cover to the left to remove it. Figure 1-3 REMOVING THE 124i COVER Mounting the 124i Cabinets(Figure 1-4 and Figure 1-5) 1. Using suitable fasteners, mount a Main...
Page 8
1. Installing Cabinets 1-6 Figure 1-4 28i INSTALLATION LAYOUT Continued on next page. . . 80000 - 15 Plywood backboard Dedicated AC Outlet Surge ProtectorTo earth ground To telco groundStation BlocksStation Blocks Trunk Blocks 4 4 INSTALLING THE CABINETS
Page 9
1. Installing Cabinets1-7 INSTALLING THE CABINETS Figure 1-5 INSTALLATION LAYOUT To Verified Earth Ground Note: Each cabinet is shown in a typical 8 x 24 configuration. Dedicated AC Outlet Dedicated AC Outlet Dedicated AC Outlet Surge Protector Surge Protector Surge ProtectorPlywood Backboard To Telco To Telco To Telco To Stations To Stations To Stations Trunk Blocks Trunk Blocks Trunk Blocks Station Blocks Station Blocks Station Blocks 4’ 4’ Expansion Cabinet #1 Main Cabinet Expansion Cabinet #2
Page 10
1. Installing Cabinets 1-8 Installing EXIFU PCBs on the 124i(Figure 1-6) Each 124i expansion cabinet requires an EXIFU Expansion Interface PCB. To connect Expansion Cabinet #1 to the Main Cabinet: 1. In Expansion Cabinet #1, plug the EXIFU PCB into the first (CPRU) slot. 2. Plug the EXIFU PCB ribbon cables into the two connectors at the top of the Main Cabinet backplane. 3. Install the ferrite filters as shown. 4. Install the metal strain reliefs in both the Main and Expansion #1 cabinets.To connect...