Page 581

NDA-24307 CHAPTER 6
Page 553
Issue 1
SYSTEM OPERATIONS
Table 6-16  System Initialization by Phase 1 Restart Procedure
ACTION7SEG LED/OPE LAMP/KEY 
SETTINGS
Note:
The TOPU used for intialization varies depending on the type of
initialization.
Initialization of Whole System: TOPU of ISW
Initialization of ISW: TOPU of ISW
Initialization of LN: TOPU of IMG0 (each LN)
STARTFor lamp indication on DSP, 
refer to Table 6-10.
For the face layout of TOPU, 
refer to for ISW and for LN.
ISW: Figure 6-64
LN: Figure...

Page 582

CHAPTER 6 NDA-24307
Page 554
Issue 1
SYSTEM OPERATIONS
12.2.4 System Initialization by Keys on CPU Front Panel
This initialization executes on a node (ISW/LN) basis when the keys on the
TOPU cannot be used. The CPU’s active status must be confirmed before
executing this type of initialization. 
Figure 6-67   System Initialization by Keys on CPU Front Panel
ATTENTIONContents
Static Sensitive
Handling
Precautions Required
Use ATIM/ATIMN command to adjust 
date and time. Confirm ACT 0 lamp 
lights green...

Page 583

NDA-24307 CHAPTER 6
Page 555
Issue 1
SYSTEM OPERATIONS
12.2.5 System Initialization by SINZ/SINZ1 Command
The entire system can be initialized by execution of the SINZ/SINZ1 command from the MAT, which
is useful for maintenance technicians who have to control the system from a distant location. When
initializing the system on a node (ISW/LN) basis, use SINZ command. When initializing the whole
system, use SINZI command. 
Figure 6-68   System Initialization by SINZ Command
START
END

For more information...

Page 584

CHAPTER 6 NDA-24307
Page 556
Issue 1
SYSTEM OPERATIONS
12.2.6 Peripheral Equipment Initialization (Line/Trunk Initialization)
Line/trunk initialization can be divided into two types: initialization on an
individual channel basis and initialization on a circuit card basis. Follow the
procedure in Table 6-17.
Table 6-17  Line/Trunk Initialization Procedure
ACTION REMARKS
ATTENTIONContents
Static Sensitive
Handling
Precautions Required
Return MB switch to the 
previous position after the 
MB lamp has turned...

Page 585

NDA-24307 CHAPTER 6
Page 557
Issue 1
SYSTEM OPERATIONS
12.3 How to Turn ON/OFF Whole System
A switching system, once put into service, is seldom stopped. However, there may
be a case when a switching system, while in service, must be stopped due to module
expansion work, etc. In preparation for such a case, this Section explains the
procedure for turning ON the power supply.
ATTENTIONContents
Static Sensitive
Handling
Precautions Required 

Page 586

CHAPTER 6 NDA-24307
Page 558
Issue 1
SYSTEM OPERATIONS
12.3.1 How to Turn ON a LN
Figure 6-69   How to Turn ON a LN
START
Make sure the SENSE switch   
on the DSP of Active CPU is  
set at Ò2Ó (DM  Load Restart).
Turn ON  the pow er supply at  
P IM s  o f IM G 3 . 
P IM 0      P IM 1     P IM 2    P IM 3 
Turn O N the power supply at  
TSWM1.
Turn ON  the pow er supply at  
P IM s  o f IM G 2 . 
P IM 0      P IM 1     P IM 2    P IM 3 
Turn ON  the pow er supply at  
P IM s  o f IM G 1 . 
P IM 0      P...

Page 587

NDA-24307 CHAPTER 6
Page 559
Issue 1
SYSTEM OPERATIONS
12.3.2 How to Turn ON the ISW
Figure 6-70   How to Turn ON the ISW
ATTENTIONContents
Static Sensitive
Handling
Precautions Required
ATTENTIONContents
Static Sensitive
Handling
Precautions Required
START
Make sure the SENSE switch 
on the DSP of Active CPU is 
set at 2(DM Load Restart).
Turn ON the power supply at 
the LPM.  
Turn ON the power supply at 
the ISWM.
END
Turn ON the SW on the PZ-PW92 of CPU 0.
Turn ON the SW on the PZ-PW92 of CPU 1.
Turn...

Page 588

CHAPTER 6 NDA-24307
Page 560
Issue 1
SYSTEM OPERATIONS
12.4 How to Turn OFF Whole System
Be sure to confirm the memory data has been backed up on the HD before turning
OFF the system power. When turning OFF the power supply, follow the procedure
shown below.
12.4.1 How to Turn OFF a LN
Figure 6-71   How to Turn OFF a LN
ATTENTIONContents
Static Sensitive
Handling
Precautions Required
 
(1)  Turn OFF the -48V SW on the DPWR (first) and PWR (next) cards in PIM3 of IMG3. 
(2)  Repeat (1) for PIM2, PIM1,...

Page 589

NDA-24307 CHAPTER 6
Page 561
Issue 1
SYSTEM OPERATIONS
Table 6-18  How to Turn OFF the ISW Procedure
ACTION REMARKS
(1) Turn OFF -48V SW on PA-PW14 (both PWR SW 1 and PWR SW 0) in
ISWM.
(2) Turn OFF SW on the PZ-PW92 of CPU 1.
(3) Turn OFF SW on the PZ-PW92 of CPU 0.
ATTENTIONContents
Static Sensitive
Handling
Precautions Required
ISW
ISWM
LPM 

Page 590

CHAPTER 6 NDA-24307
Page 562
Issue 1
SYSTEM OPERATIONS
12.5 System Start-Up
12.5.1 System Start-Up Procedures
The system start-up procedures consist of the following types.
Procedure 1 (see Table 6-19)
Executes when the Basic Software and Application Software are already installed in the HD. Office
Data is not installed.
Procedure 2 (see Table 6-20)
Executes when the Basic Software, Application Software and Office Data are already installed in the
HD.
Note:For the start-up procedure in case any Basic...
Start reading NEC Neax 2400 Ipx System Operations And Maintenance Manual

Related Manuals for NEC Neax 2400 Ipx System Operations And Maintenance Manual

All NEC manuals