NEC Neax 2400 Ipx System Operations And Maintenance Manual
Here you can view all the pages of manual NEC Neax 2400 Ipx System Operations And Maintenance Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 571
NDA-24307 CHAPTER 6 Page 543 Issue 1 SYSTEM OPERATIONS 12.2 Initialization 12.2.1 General This section explains the initialization types: System Initialization System Initialization by turning ON the Power Supply, Section 12.2.2 System Initialization by Key Operations on the TOPU, Section 12.2.3 Procedure #1 through Procedure #5 System Initialization by the keys on the CPU Front Panel, Section 12.2.4 System Initialization by the SINZ/SINZ1 Command, Section 12.2.5 Peripheral Equipment Initialization...
Page 572
CHAPTER 6 NDA-24307 Page 544 Issue 1 SYSTEM OPERATIONS 12.2.2 System Initialization by Turning ON the Power Supply This initialization executes when the power supply to a node (ISW/LN) has stopped. Follow the procedure in Figure 6-62. Figure 6-62 System Initialization by Turning ON the Power Supply ATTENTIONContents Static Sensitive Handling Precautions Required Confirm all switches in the node are turned “OFF” on PWR cards. START Confirm input source power to the node is normal. Turn “ON” the...
Page 573
NDA-24307 CHAPTER 6 Page 545 Issue 1 SYSTEM OPERATIONS Table 6-10 Lamp Indications on DSP of CPR NODEACT / ST-BYLAMP ON DSP STATE ISW ACT CPU OPE Lights Green IMG 0 Lights Green IMG 1 Lights Green IMG 2 Lights Green (when LN 2 exists) IMG 3 Lights Green (when LN 3 exists) STBY CPU OPE OFF IMG 0 Flashes Green IMG 1 OFF IMG 2 OFF IMG 3 OFF LN ACT CPU OPE Lights Green IMG 0 Flashes Green IMG 1 Flashes Green IMG 2 Flashes Green (when IMG 2 exists) IMG 3 Flashes Green (when IMG 3 exists) STBY CPU OPE OFF IMG...
Page 574
CHAPTER 6 NDA-24307 Page 546 Issue 1 SYSTEM OPERATIONS 12.2.3 System Initialization by Key Operations on TOPU Table 6-11 shows the system initialization procedure. Figure 6-63 shows the initial program load conceptional diagram. Table 6-11 System Initialization Procedure Types TYPE DESCRIPTION Procedure 1 (Table 6-12)System Initialization without Loading The whole system or a specific node (ISW/LN) is initialized. All communications are forcibly released. System restarts with current Main Memory Files...
Page 575
NDA-24307 CHAPTER 6 Page 547 Issue 1 SYSTEM OPERATIONS Figure 6-63 Conceptional Diagram of Initial Program Load Figure 6-64 Keys on the TOPU (ISW) Figure 6-65 Keys on the TOPU (LN) Main Memory Files Basic Software (#2~#11) (=PROGRAM) Standard Service Software IMAT Software (#1~#2) TCP/IP Software (#1) Office Data Files Data Memory (ASYD, AUNT, (=SYSTEM DATA) ANPD, ASPA, ASDT, etc.) Call Forwarding Data Speed Calling Data Name Display Data User Assign Soft Key Data Number Sharing Data RCF NDM...
Page 576
CHAPTER 6 NDA-24307 Page 548 Issue 1 SYSTEM OPERATIONS To initialize the system, check the lamp indications in Figure 6-66, and operate the keys on the TOPU. Figure 6-66 Related Keys and LEDs for System Initialization LOAD NON LOAD PROGRM NON LOAD SYSTEM DATA LOAD 12 34 567 8 OFF 12 34 567 8 OFF 12 34 OFF MBR FDD ON OFF ON OFF OUT PWR IN PWR5AHDD SW MB SYSTEM SELECT2 CPURST Note 2 Note 3 SLOT No. 0 1 2 3 4 5 6 ON ON ON ALM RSTON OFF PFTON OFF START INITIAL EFFECT 0304 FRONT VIEW Ex. ISW ..... ........
Page 577
NDA-24307 CHAPTER 6 Page 549 Issue 1 SYSTEM OPERATIONS Table 6-12 System Initialization Without Loading Procedure ACTION7SEG LED/OPE LAMP/KEY SETTINGS Note: The TOPU used for intialization varies depending on the type of initialization. Initialization of Whole System: TOPU of ISW Initialization of ISW: TOPU of ISW Initialization of LN: TOPU of IMG0 (each LN) STARTFor lamp indication on DSP, refer to Table 6-10. For the face layout of TOPU, refer to for ISW and for LN. ISW: Figure 6-64 LN: Figure...
Page 578
CHAPTER 6 NDA-24307 Page 550 Issue 1 SYSTEM OPERATIONS Table 6-13 System Initialization With Office Data Loading Procedure ACTION7SEG LED/OPE LAMP/KEY SETTINGS Note: The TOPU used for intialization varies depending on the type of initialization. Initialization of Whole System: TOPU of ISW Initialization of ISW: TOPU of ISW Initialization of LN: TOPU of IMG0 (each LN) STARTFor lamp indication on DSP, refer to Table 6-10. For the face layout of TOPU, refer to for ISW and for LN. ISW: Figure 6-64 LN:...
Page 579
NDA-24307 CHAPTER 6 Page 551 Issue 1 SYSTEM OPERATIONS Table 6-14 System Initialization with Program Loading Procedure ACTION7SEG LED/OPE LAMP/KEY SETTINGS Note: The TOPU used for intialization varies depending on the type of initialization. Initialization of Whole System: TOPU of ISW Initialization of ISW: TOPU of ISW Initialization of LN: TOPU of IMG0 (each LN) STARTFor lamp indication on DSP, refer to Table 6-10. For the face layout of TOPU, refer to for ISW and for LN. ISW: Figure 6-64 LN:...
Page 580
CHAPTER 6 NDA-24307 Page 552 Issue 1 SYSTEM OPERATIONS Table 6-15 System Initialization With Office Data And Program Loading Procedure ACTION7SEG LED/OPE LAMP/KEY SETTINGS Note: The TOPU used for intialization varies depending on the type of initialization. Initialization of Whole System: TOPU of ISW Initialization of ISW: TOPU of ISW Initialization of LN: TOPU of IMG0 (each LN) STARTFor lamp indication on DSP, refer to Table 6-10. For the face layout of TOPU, refer to for ISW and for LN. ISW: Figure...