Page 391
NDA-24306 CHAPTER 5 Page 363 Revision 1.0 6. LOAD TEST 6.1 Outline Load tests are to be performed by simulating actual operating conditions. When performing load tests, five to ten telephone sets, an Attendant Console, and, if available, a test call device are to be connected to the system. While load tests are in progress, System Messages, TOPU lamps, etc. must be checked to determine whether an abnormal condition is present. 6.2 Load Test Procedure The procedure for performing the Load Test is...
Page 392
CHAPTER 5 NDA-24306 Page 364 Revision 1.0 NAP-200-050 Sheet 1/2 Load Test START On the MDF, connect telephone sets and the call test equipment to line circuits.On the MDF, connect five to ten telephone sets to line circuits. The accommodated locations of the line circuits are shown in Table 050-2. Provide the required jumper connections according to the test pattern being used. Perform load test from Pattern 1 through Pattern 4 as shown in Table 050-1.Set No.0 systems of TSW and CPU in all Local...
Page 393
NDA-24306 CHAPTER 5 Page 365 Revision 1.0 NAP-200-050 Sheet 2/2 Load Test Table 050-1 Load Test Patterns by CPU and TSW Mode Pattern 1Pattern 2Pattern 3Pattern 4 Active CPU No.0 system No.0 system No.1 system No.1 system Active TSW No.0 system No.1 system No.0 system No.1 system Table 050-2 Load Test Connection Sheet Called Party Calling Pa r tyLN (IMG0/2) LN (IMG1/3) PIM0 PIM1 PIM2 PIM3 PIM0 PIM1 PIM2 PIM3 U=0 U=1 U=2 U=3 U=0 U=1 U=2 U=3 U=0 U=1 U=2 U=3 U=0 U=1 U=2 U=3 LN IMG 0/2PIM 0U=0 U=1 PIM...
Page 395
NDA-24306 CHAPTER 6 Page 367 Revision 1.0 CHAPTER 6 FAULT RECOVERY DURING TESTS 1. GENERAL The fault recovery procedures described in this chapter are used when a connection cannot be established in the normal manner or an abnormal connection is discovered as a result of the tests designated in Chapter 4, “SYS- TEM STARTUP”, and Section 2., “BASIC CONNECTION TEST” of Chapter 5. 2. OUTLINE OF PROCEDURE FOR FAULT RECOVERY The procedures for performing fault recovery are described in the NAPs indicated to...
Page 396
CHAPTER 6 NDA-24306 Page 368 Revision 1.0 FAULT RECOVERY DURING TESTS NAP-200-051 Sheet 1/2 Abnormal Lamp Indications After System Startup START Check conducted when the OPE lamp (Green) do not illuminate on any circuit cards mounted in a PIM. Using MAT command “AUNT”, check whether UNIT data has been assigned. Replace the MUX card in the PIM with a spare. Check whether the “MT24 TSW” cable, linking the MUX and TSW circuit cards, and the ISA bus (34PH 50AL CA-A or 34PH 50AL CA-B) cable, linking the ISA...
Page 397
NDA-24306 CHAPTER 6 Page 369 Revision 1.0 FAULT RECOVERY DURING TESTS NAP-200-051 Sheet 2/2 Abnormal Lamp Indications After System Startup Check conducted when the OPE lamp (Green) does not illuminate on a Trunk circuit card. Confirm that the MB switch of the circuit card is DOWN. Using command “ATRK,” check whether Trunk data has been assigned for the circuits on the card. Replace the circuit card with a spare. Check conducted when the OPE lamp of a Trunk circuit card illuminates, but the BL lamp...
Page 398
CHAPTER 6 NDA-24306 Page 370 Revision 1.0 FAULT RECOVERY DURING TESTS NAP-200-052 Sheet 1/1 Dial Tone Connection Fault START Dial tone is not heard. On the MDF, check the cross connections between the telephone and the corresponding line circuit. Check whether the LT cable is securely connected to the PIM. Replace the LC card with a spare. Dial tone cannot be heard from one or more lines of the same circuit card. Replace the LC card with a spare. Dial tone cannot be heard from the lines accommodated by...
Page 399
NDA-24306 CHAPTER 6 Page 371 Revision 1.0 FAULT RECOVERY DURING TESTS NAP-200-053 Sheet 1/2 Station to Station Connection Fault START Dial tone is still heard after a digit is dialed (cannot break dial tone) A specific RST card is involved Replace the RST card with a spare. A specific LC card is involved Replace the LC card with a spare. A specific UNIT card is involved Replace the TSW/MUX card with a spare. Entire System is involved Replace the TSW card with a spare. Reorder tone is heard after a...
Page 400
CHAPTER 6 NDA-24306 Page 372 Revision 1.0 FAULT RECOVERY DURING TESTS NAP-200-053 Sheet 2/2 Station to Station Connection Fault After the call has been answered, noise is heard or the speech path is one-way. If the fault involves one or more lines within the same LC circuit card, replace the card with a spare. If the fault involves a specific PIM, replace the MUX circuit card with a spare. If noise is heard throughout the entire system, replace the TSW circuit card with a spare. END AT T E N T I O...