Home > NEC > Communications System > NEC Neax 2400 Imx System Operations And Maintenance Manual

NEC Neax 2400 Imx System Operations And Maintenance Manual

Here you can view all the pages of manual NEC Neax 2400 Imx System Operations And Maintenance Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 421

CHAPTER 6 NDA-24238
Page 394
Revision 3.0
SYSTEM OPERATIONS
2.2 Display on MAT
Set Scanning to Scanning ON (default) on the Scanning PBX form to collect system messages. If any mes-
sage is collected, the information is displayed in the text box on the DFTD command form.
3. INDICATION OF LOCKOUT STATIONS
When a station is in lockout status (permanent signaling state, shorting across speech wires, etc.), it can quickly
be discovered, preventing the situation from developing into serious trouble.
3.1...

Page 422

NDA-24238 CHAPTER 6
Page 395
Revision 3.0
SYSTEM OPERATIONS
Figure 6-5  Recovery Procedure From Lockout Station (Continued)
COMMAND COMMAND FULL NAME
RLSTRelease Station/Trunk
A
RLST command
(Confirm: DT)
Hear DT?
Replace 16LC card
with a spare.Circuit may be faulty temporarily.
Observe situation for a while.Forcibly release the lockout station circuit.
Go off-hook again and confirm DT.
YES
NO 

Page 423

CHAPTER 6 NDA-24238
Page 396
Revision 3.0
SYSTEM OPERATIONS
4. LINE LOAD CONTROL
In the PBX, Line Load Control can be activated automatically or manually as a countermeasure against abnor-
mal traffic congestion.
In the case of automatic control, the system automatically monitors an overloaded situation and restricts out-
going calls from stations and incoming calls from trunks.
In the case of manual control, the operator at an Attendant/Desk Console or the MAT restricts outgoing calls
from stations and...

Page 424

NDA-24238 CHAPTER 6
Page 397
Revision 3.0
SYSTEM OPERATIONS
 Cancelling
Figure 6-7   Line Load Control Operations on ATTCON—Cancelling
Figure 6-8   Locations of Lamps (ATTCON)
 
Press LOOP key.
Press CANCEL key.Lamp (Figure 6-8) on control 
panel lights.
 System message [6-D] displays. (SST)
Dial the access code for cancelling 
Line Load Control.
LAMPNEC 

Page 425

CHAPTER 6 NDA-24238
Page 398
Revision 3.0
SYSTEM OPERATIONS
(2) Key Operations on the Desk Console (DESKCON)
By the operations on the Desk Console, restriction is applied on an outgoing call from a station having
SFC in which the SFI = 16 (Line Load Control) of ASFC command is set as RES=0 (incoming calls to
that station are allowed). For restricting incoming calls from a trunk, system data ASYD, SYS1,
INDEX59, b0=1 should be assigned.
Setting
Figure 6-9   Line Load Control Key Operations on...

Page 426

NDA-24238 CHAPTER 6
Page 399
Revision 3.0
SYSTEM OPERATIONS
Figure 6-11   Line Load Control Indication (DESKCON)
(3) Operations on the MAT
By entering ALLC command from the MAT, Line Load Control executes. The station to be controlled and
the contents of the Line Load Control executed on the MAT are the same as those in Step (1), Operations
on the Attendant Console.
(4) Automatic Setting
If the usage rate of the CPU exceeds the system data usage rate, Line Load Control is automatically set.
In this case,...

Page 427

CHAPTER 6 NDA-24238
Page 400
Revision 3.0
SYSTEM OPERATIONS
5. IOC LINE MONITOR
(1) Functional Outline
This function monitors the IOC port status. As a result of the monitoring by this function, the following
is executed:
 When the connection with a port has been disconnected, it is reported by a message.
 When the connection with a port is set up, it is reported by a message.
 The port status is stored in the memory and updated continuously.
(2) Message Judgment Criteria
Table 6-2 describes the...

Page 428

NDA-24238 CHAPTER 6
Page 401
Revision 3.0
SYSTEM OPERATIONS
6. LINE MANAGEMENT
The following explanations apply to line management:
 Make-Busy/Make-Busy Cancel of Station and Data Terminal
 Class Change and Number Change of Station and Data Terminal
 Make-Busy/Make-Busy Cancel of C.O. Line/Tie Line
6.1 Make-Busy/Make-Busy Cancel of Station and Data Terminal
Stations and data terminals can be put into make-busy state by the following operations:
(1) On each station basis using the MBST command.
Assign...

Page 429

CHAPTER 6 NDA-24238
Page 402
Revision 3.0
SYSTEM OPERATIONS
6.2 Class Change and Number Change of Station and Data Terminal
Figure 6-12 shows the procedure for class change and number change of station and data terminal.
Figure 6-12   Class Change and Number Change of Station and Data Terminal Procedure
6.3 Make-Busy/Make-Busy Cancel of C.O. Line/Tie Line
Figure 6-13 shows the procedure to make-busy/make-busy cancel of C.O. line/tie line.
Figure 6-13   Make-Busy/Make-Busy Cancel of C.O. Line/Tie Line...

Page 430

NDA-24238 CHAPTER 6
Page 403
Revision 3.0
SYSTEM OPERATIONS
6.4 Line Management Commands
7. STATION MESSAGE DETAIL RECORDING SYSTEM (SMDR)
Billing information can be managed by connecting the PBX system and an external computer (SMDR equip-
ment).
Note:The SMDR equipment and its software must be provided by the user.
The PBX system provides the SMDR equipment with the following information:
 Calling Party Information
 Called Party Number
 Call Start Time
 Call End Time
 Call Data
 Authorization...
Start reading NEC Neax 2400 Imx System Operations And Maintenance Manual

Related Manuals for NEC Neax 2400 Imx System Operations And Maintenance Manual

All NEC manuals