    							CHAPTER 3 SYSTEM DATA PROGRAMMING
    Digital Trunk Interface Assignment
    NEAX2000 IVS2 Data Interface System Manual    
    ND-70924 (E), Issue 1.0   Page 53
    DESCRIPTION DATA
    Specify the kind of digital data 
    transmission.
    (1)
    (2)YY=92
    00-63: Trunk Route No.
    0  :  Digital Data Transmission 
    (48 kbps)
    1  :  Digital Data Transmission 
    (56 kbps)
    2  :  Digital Data Transmission 
    (Transparent)
    3  :  Reversal of F&S Bits
    7  :  Data Transmission via ModemCM35
    C
    END 
    						
    							NEAX2000 IVS2 Data Interface System Manual    
    ND-70924 (E), Issue 1.0   Page 55
    CHAPTER 4
    OPERATION TEST
    This chapter explains the operation tests to be performed after you
    have completed the installation of the Data Interface to the PBX. 
    						
    							 NEAX2000 IVS2 Data Interface System ManualPage 56  ND-70924 (E), Issue 1.0
    CHAPTER 4 OPERATION TEST
    DPC Loopback Test
    DPC LOOPBACK TEST
    This test is the intra-office loopback test on the DPC card using a modem tester. There are two
    kinds of loopback (Loopback 1, Loopback 2) as shown in Figure 4-1. Either the Loopback 1 or
    the Loopback 2 can be selected by switch settings on the DPC card.
    Figure 4-1  DPC Loopback Tests
    V.110DPC
    V.110DPC Loopback 1
    PBX
    MODEM TESTER
    DTI
    Loopback 2
    MODEM TESTER
    DTI
    NOTE:The modem tester is locally provided. 
    						
    							CHAPTER 4 OPERATION TEST
    DPC Loopback Test
    NEAX2000 IVS2 Data Interface System Manual    
    ND-70924 (E), Issue 1.0   Page 57
    DPC Loopback 1 Test
    (1) Set the SW1 on the DPC card as shown below.
    (2) Confirm whether the LB01 lamp (for No. 0 circuit) or the LB11 lamp (for No. 1 circuit) on the 
    DPC card lights.
     If the LB01 lamp or the LB11 lamp does not light, check the switch settings on the DPC card 
    and the system data assignment.
    (3) Connect a modem tester to the DPC card as shown in Figure 4-2.
    Figure 4-2  Connection of Modem Tester
    For No. 0 CircuitFor No. 1 Circuit
    4 
    3 
    2 
    1 OFF
    ON SW1
    4 
    3 
    2 
    1 OFF
    ON SW1
    : POSITION TO BE SET
    MODEM TESTER
    DPC
    PBX
    (J) (P)
    STRAIGHT CABLEDPC V11 CABLE
    (P) (J)
    XCN0 (FOR No. 0 CIRCUIT)/
    XCN1 (FOR No. 1 CIRCUIT)
    (a)   When you use V. 11 (X.21) interface
    MODEM TESTER
    DPC
    PBX
    (J) (P)
    STRAIGHT CABLEDPC RS CABLE
    (P) (J)
    RS0 (FOR No. 0 CIRCUIT)/
    RS1 (FOR No. 1 CIRCUIT)
    (b)   When you use V. 24/V. 28 (RS-232C) interface 
    						
    							 NEAX2000 IVS2 Data Interface System ManualPage 58  ND-70924 (E), Issue 1.0
    CHAPTER 4 OPERATION TEST
    DPC Loopback Test
    (4) Set the attributes of modem tester (transmission rate, etc.).
    (5) To confirm whether the data is transmitted correctly, send the PN Pattern 9 (511 Pattern) 
    from the modem tester.
    (6) Count bit errors on the modem tester for 1 minute.
     If bit errors do not occur, the cable connection between DPC card and modem tester is 
    normal.
    (7) If bit errors occur, check the cable connection, and replace the DPC card.
    (8) After this test, set all the SW1-1 through SW1-4 on the DPC card to OFF. 
    						
    							CHAPTER 4 OPERATION TEST
    DPC Loopback Test
    NEAX2000 IVS2 Data Interface System Manual    
    ND-70924 (E), Issue 1.0   Page 59
    DPC Loopback 2 Test
    After you complete the DPC Loopback 1 Test, do the following steps.
    (1) Set the SW1 on the DPC card as shown below.
    (2) Confirm whether the LB02 lamp (for No. 0 circuit) or the LB12 lamp (for No. 1 circuit) on the 
    DPC card lights.
     If the LB02 lamp or the LB12 lamp does not light, check the switch settings on the DPC card 
    and the system data assignment.
    (3) Connect a modem tester to the DPC card as shown in Figure 4-2  “Connection of Modem 
    Tester.”
    (4) Set the attributes of modem tester (transmission rate, etc.).
    (5) To confirm whether the data is transmitted correctly, send the PN Pattern 9 (511 Pattern) 
    from the modem tester.
    (6) Count bit errors on the modem tester for 1 minute.
     If bit errors do not occur, the DPC card is normal.
    (7) If bit errors occur, check the system data assignment, and replace the DPC card.
    (8) After this test, set all the SW1-1 through SW1-4 on DPC card to OFF.
    For No. 0 CircuitFor No. 1 Circuit
    4 
    3 
    2 
    1 OFF
    ON SW1
    4 
    3 
    2 
    1 OFF
    ON SW1
    : POSITION TO BE SET 
    						
    							 NEAX2000 IVS2 Data Interface System ManualPage 60  ND-70924 (E), Issue 1.0
    CHAPTER 4 OPERATION TEST
    Other Loopback Tests
    OTHER LOOPBACK TESTS
    Two additional forms of loopback test are shown in Figure 4-3.
    Figure 4-3  Other Loopback Tests
    V.110DPC DTI local loopback
    PBX
    DTI
    DTI hard-wired loopback
    Set DTI in local
    loopback.
    DTI
    TA
    TB
    RA
    RB
    On the MDF, connect 
    transmit leads to the 
    Receive leads to test 
    all portions of the DTI.
    V.110DPC
    MODEM TESTER
    MODEM TESTER 
    						
    							CHAPTER 4 OPERATION TEST
    Inter-Office Digital Data Transmission Test
    NEAX2000 IVS2 Data Interface System Manual    
    ND-70924 (E), Issue 1.0   Page 61
    INTER-OFFICE DIGITAL DATA TRANSMISSION TEST
    This test is the inter-office digital data transmission test using modem testers. After you complete
    the loopback tests, do the following steps.
    (1) Connect modem testers to the both PBXs as shown in Figure 4-4.
    Figure 4-4  Inter-Office Digital Data Transmission Test
    (2) Set the attributes of both modem testers (transmission rate, etc.).
    NOTE:If both the attributes do not match, this test is not available.
    (3) To confirm whether the data is transmitted correctly, send the PN Pattern 9 (511 Pattern) 
    from the modem testers.
    (4) Count bit errors on the modem testers for 1 minute.
     If bit errors do not occur, the inter-office digital data transmission is normal.
    (5) If bit errors occur, check the following items.
     System data assignment
    DTI card
     PCM digital line
     Opposite PBX
    PBXPBX
    MODEM TESTER
    DTIDPCDTIDPC
    MODEM TESTER 24/30 CHANNEL
    PCM DIGITAL LINE
    NOTE 1:For details of cable connection between the DPC card and the modem tester, see
    Figure 4-2 “Connection of Modem Tester.”  
    NOTE 2:The modem tester is locally provided.
    NOTE 1NOTE 1 
    						
    							NEAX2000 IVS2 Data Interface System Manual    
    ND-70924 (E), Issue 1.0   Page 63
    CHAPTER 5
    CIRCUIT CARD
    INFORMATION
    This chapter explains the mounting location, the meaning of lamp
    indications, and the method of switch settings of each circuit card for
    the Data Interface system. 
    						
    							 NEAX2000 IVS2 Data Interface System ManualPage 64  ND-70924 (E), Issue 1.0
    CHAPTER 5 CIRCUIT CARD INFORMATION
    How to Read This Chapter
    HOW TO READ THIS CHAPTER
    This chapter explains each circuit card used in this system for the following items. Explanations
    are given in the alphabetical order of the circuit card names within each circuit card category
    (Control, Application Processor, and Line/Trunk).
    (1) Locations of Lamps, Switches, and Connectors
    The locations of lamps, switches, and connectors of each circuit card are shown by a face 
    layout.
    (2) Lamp Indications
    The name, color, and functions of each indicator lamp equipped on each circuit card are 
    described in a table.
    (3) Switch Settings
    The name, settings, and functions of each switch equipped on each circuit card are 
    described in a table.
    Each switch setting table has a “CHECK” column. Make necessary entries in the CHECK column
    during and/or after the system installation and maintenance, and use each table as a reference
    for subsequent system maintenance and operations. 
    						
    All NEC manuals Comments (0)

    Related Manuals for NEC Neax 2000 Ivs2 Data Interface System Manual