Home > Namco > Games > Namco Final Furlong Operators Manual

Namco Final Furlong Operators Manual

Here you can view all the pages of manual Namco Final Furlong Operators Manual. The Namco manuals for Games are available online for free. You can easily download all the documents as PDF.

Page 51

Page 52 6-3-4 Monitor Test
1. Select “MONITOR TEST” on the menu screen to test and adjust the
Monitor. The following screen is displayed.
2. Use the Select Up/Down switch choose the required item then press the
Enter button. To return to the Monitor Test Menu from a test pattern press
the Enter button.
3. Select “EXIT” and press the Enter button to return to the menu screen.
MONITOR TEST
GRADATION PATTERN..................................... (a)
CROSSHATCH PATTERN...

Page 52

Page 53 6-3-5 Sound Test
1. Select “I/O TEST” on the menu screen to switches and lamps. The
following screen is displayed.
2. Use the Select Up/Down switch choose the required item then press the
Enter button.
3. Use the Enter button to change the setting.
4. Select “EXIT” and press the Enter button to return to the menu screen.
SOUND TEST

VOLUME LEFT SP (0~63) 40.................................... (a)
RIGHT SP (0~63) 40.................................... (b)
REQUEST SONG NO. 129
( f )...

Page 53

Page 54
6-3-7 Others
1. Select “OTHERS” on the menu screen. The following screen is displa\
yed. 
2. Use the Select Up/Down switch choose the required item then press the Enter button.
3. Select “EXIT” and press the Enter button to return to the menu scr\
een.
6-3-6 ADS Data
By selecting ADS Data from the menu screen, all of the bookkeeping detai\
ls can be reset.
OTHERS
ROM1 Ver. _
 /  _
 /  _
--:--:-- ...................................................... (a)
ROM2 Ver. _
 /  _
 /  _
--:--:--...

Page 54

Page 55
7. INITIALIZATION
Adjustments When Replacing Parts
The following adjustment must always be performed when the game is first
installed, and after replacing the Game PCB or Control Pots.
The game will not operate correctly if these adjustments are not made.
1) Ensure that the Horse and Head assemblies are in their central positions.
2) Slide the test switch ON while pressing the service switch. The following
screen will be displayed.
VOLUME ADJUST
HANDLE 7A00 7A00 0000
SWING9100 9100 0000
ENTER SW...

Page 55

Page 56
8. REMOVING AND REPLACING ASSEMBLIES AND PARTS
8-1 Replacing the Pedal Assembly
1. Remove the three M5x10 security screws and remove the stirrup cover.
2. Remove the M8 x 20 socket cap screw and washer, then remove the
stirrup safety bracket and pedal arm.
3. Replace the pedal arm with a new one then reassemble using the reverse
procedure.
Note:
When remounting the pedal arm, make sure that it is facing exactly
downwards. 

Page 56

Page 57
8-2 Replacing the Pedal Rubber
1. Remove the four security screws (M5x12) and remove the rubber
retainers.
2. Lift off the pedal rubber.
3. Refit the new pedal rubber onto the step box.
4. Insert the rubber retainers back into their original position (note short and
long end) and refit and tighten the four security screws (M5x12) 

Page 57

Page 58
8-3 Replacing the Neck Pot
1. Remove the ten security screws (M5x16) and remove the left and right
hand neck vac-forms.
2. Disconnect the control pot connector.
3. Loosen the socket set screw (M4x8) and remove the pot complete with
bracket.
4. Replace the pot and re-assemble in reverse order.
NOTE:
When replacing the potentiometer ensure that the set screw (M4x8)
engages on the flat of the pot shaft, and that the lug on the bracket
engages in the slot of the neck metal work. 

Page 58

Page 59 8-4 Replacing the Whip Button switch
1. Remove the three socket screws (M4x8), Socket screw (M4x8) and Hex
nut (M4), and remove the whip button cover.
2. Remove the connector then replace the whip button switch assembly.
3. Re-assemble in reverse order. 

Page 59

Page 60
8-5 Replacing the Rein Frame
1. Remove the left and right neck vac-forms.  (see section 8-3 (1))
2. Remove the three security screws (M5x16) securing the neck flange. 
3. Remove the four pozi head screws (M5x12),flat and spring washers then remove the neck vac-form support bracket. Temporarily slide the neck 
flange backwards.
4. Remove the three security screws (M5x16) securing the neck cup then slide the neck cup backwards.
5. Remove the connector. 

Page 60

Page 61 6. Remove the pozi head screw (M6x12) then remove the harness cover
from the left-hand side of the tip.
7. Remove the two socket button head screws (M4x16) (one each from the
left-hand and right-hand sides) then remove the bit.
8. Remove the eight socket button head screws (M6x16) (four each from the
left-hand and right-hand sides) then remove the rein levers.
9. Replace the rein frame with a new one then reassemble using the reverse
procedure. 
Start reading Namco Final Furlong Operators Manual

Related Manuals for Namco Final Furlong Operators Manual

All Namco manuals