Mitel Sx 200 Ml Pabx Lightware 16 Instructions Guide
Here you can view all the pages of manual Mitel Sx 200 Ml Pabx Lightware 16 Instructions Guide. The Mitel manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 31
1 Introduction Installation Information Intent of this Document 1.1 This practice describes the installation procedures for the SX-200@ ML PABX, in addition to the MlTEL@ peripheral equipment designed to be used with them. Intended Audience This practice is designed for MITEL-trained installation and maintenance technicians. The System: The 96-pot-t cabinet, consisting of a single bay, holds one Main Control Card II (MCC II), a Bay Control Card, a Bay Power Supply, and up to eight Peripheral...
Page 32
Installation Information Table l-l Installation Information Part Part 2 Part 3 Part 4 Title Contents Installing System - Equipment part numbers and outlines of installation procedures. - Prepare for installation Handling Printed Circuit Cards - Unpack and handle printed circuit cards - Remove and return printed circuit cards Installing Digital Peripheral Cards Installation of: and Modules - the Universal Card - the ONS, OPS, and Digital Line Cards - the DID Trunk Card - the LS/GS Trunk...
Page 33
Introduction Chart l-l How to Use This Practice Step Action Comments install Equipment 1. Refer to the appropriate part of this document for the PABX configuration you are installing. 2. Consult the tables at the beginning of each The tables tell you what equipment is to be part. installed, and in what sequence. 3. Follow the installation charts in the sequence given in the table. install Peripheral Equipment 4. When the cabinet and circuit cards are installed, refer to the feri@era/ Devices...
Page 34
InsWa~ion Information Table l-2 Referenced MITEL Documents Practice Number Title Contains Information On 9109-098-126-NA Peripheral Devices All peripherals, including SUPERSETTM telephones, consoles, datasets, and other devices, and the installation procedures for those devices 9109-098-I 80-NA Engineering Information Configuring the system 9109-098-210-NA Customer Data Entry (CDE) Programming the PABX when hardware installation is complete 1 9109-098-350-NA 1 Troubleshooting 1 Problems during...
Page 35
2 Installing the System Installing the SX-200 ML PABX Introduction 2.1 The equipment to be installed to create the system is shown in Table 2-l. Some of the equipment listed as requiring installation may have been shipped already installed. If that is the case, the equipment should be removed and reseated during the installation procedure. Table 2-l Equipment Installed in the SX-200 ML PABX Cabinet The cabinet is shipped preconfigured with - Main Control II Card - Bay Control Card - Bay Power...
Page 36
lns~allation InformaGon ML LIGHTIMARE 16 software stem documentation Note: The SX-200 ML PABX has been evaluated and listed with Underwriter’s Laboratories lnncorpo- rated to their standard for safety 1459, ‘Telephone Equipment”, second edition. The denoted assemblies have been investigated and determined suitable for use in this product. Installation Charts Table 2-3 indicates which charts to follow in sequence to install the SX-200 ML PABX. 2-2 ls:de 1 Revision 0 March 1997
Page 37
Installing the System Table 2-3 Charts to Follow to Install the SX-200 ML System I Prepare for Installation Activity Basic Chart Prepare for Installation 1 Chart 2-l I Install Cabinet Unpack and Inspect Cabinet 1 x 1 Chatt2-2 1 Open and Close Front Door Install Cabinet (the cabinet is pre-configured with Control cards) Verify Ground Connection X Chart 2-3 X Chart 2-4 X Chart 2-5 Handle Printed Circuit Cards Unpack and Handle Printed Circuit Cards Chart 3-l I Remove and Repack Printed...
Page 38
lns~alla~ion Information Prepare for Installation 2.2 When you have completed Chart 2-i you will have: l Made sure that the site survey information is available. l Made sure that the system configuration information is available. l Assembled the material you need for the installation. l Provided additional ac outlets if required. Chart 2-l Prepare For installation Step Action Comments Prepare For Installation 1. Make sure all stations, trunks, and other equipment This information is usually...
Page 39
Installing the System Chart 2-2 Unpack and Inspect an SX-200 ML Cabinet Step Action Comments Remove Cabinet from Carton 1. Set aside all other packaged items for later unpacking and installation. 2. Unpack carton and check contents against packing list. Retain some packing material in case any items are to be returned. 3. Remove the cabinet from the carton. inspect for Transit Damage 4. Visually check that the cabinet and all atiached equipment is undamaged. 5. Open the cabinet front door....
Page 40
Installation Information Chart 2-3 Open and Close Cabinet Front Door Action Open Cabinet Front Door Pry open the two latches on the right-hand side of the black cover panel on the front door, and swing the cover panel off to the left. Loosen the two screws under the black panel to release the front door panel. Pull the top of the front door out from the cabinet and lift it off the lower front cabinet rail. Close Cabinet Front Door Lower the front door panel down over the front cabinet rail...