Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies Whats New In DEFINITY Enterprise Communications Server Release 8.2 Manual
Lucent Technologies Whats New In DEFINITY Enterprise Communications Server Release 8.2 Manual
Here you can view all the pages of manual Lucent Technologies Whats New In DEFINITY Enterprise Communications Server Release 8.2 Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 251
What’s New in DEFINITY ECS Release 8.2 Job Aid 555-233-754 Issue 1 April 2000 Networking Enhancements 245 Networking - ATM 2 nATM Network Duplication configurations come equipped with a simplex SPE complex in the PPN, duplicate connectivity over ATM to all PNs and duplicate ATM interfaces in each PN. nThe EPN configuration for ATM Network Duplication is the same as that for an EPN equipped for ATM critical reliability. nDuplicated paths to the ATM WAN may be through the same ATM switch,...
Page 252
What’s New in DEFINITY ECS Release 8.2 Job Aid 555-233-754 Issue 1 April 2000 Networking Enhancements 246 Networking - ATM 2 nBoth an expansion control carrier and a port carrier are required in each EPN. nEach of the two TN2305 or TN2306 ATM interfaces and tone clocks are placed in each of the two carriers. nA TN771 facility test circuit pack is required in each port network of a R8r system equipped for ATM Network Duplication. DEFINITY® system software does not prevent placement of 2 ATM...
Page 253
What’s New in DEFINITY ECS Release 8.2 Job Aid 555-233-754 Issue 1 April 2000 Networking Enhancements 247 Networking - ATM 2 nOnce the ATM Interfaces, tone clocks, and ATM B-PNC addresses have been administered for all EPNs, the change system-parameters duplication command is issued. This brings up the DUPLICATION-RELATED SYSTEM PARAMETERS form. The Enable Operation of PNC Duplication? option is then changed to y. The option for Enable Operation of SPE Duplication? must remain as n. System...
Page 254
What’s New in DEFINITY ECS Release 8.2 Job Aid 555-233-754 Issue 1 April 2000 Networking Enhancements 248 Networking - ATM 2 Duplication configuration Steps nbusyout pnc-standby nchange sys dup (turn off PNC duplication) nreplace boards on the standby PNC nchange sys dup (turn on PNC duplication) nreset pnc interchange nrepeat above with other side nsave translations Upgrades nTN2305/TN2306 ATM interfaces can be used for R8r ATM PNC capabilities. nThe TN2305/TN2306 ATM Interfaces must be used with...
Page 255
What’s New in DEFINITY ECS Release 8.2 Job Aid 555-233-754 Issue 1 April 2000 Networking Enhancements 249 Networking - ATM 2 Interworking with Bandwidth Constricted ATM Networks Conserving ATM Bandwidth Introduction This is a recommendation to allow DEFINITY® R8r systems using ATM Port Network Connectivity to perform optimally when bandwidth is at a premium. nATM bandwidth can be conserved, where possible, through optimal DEFINITY® resource allocation. — Resources that can be optimally placed can...
Page 256
What’s New in DEFINITY ECS Release 8.2 Job Aid 555-233-754 Issue 1 April 2000 Networking Enhancements 250 Networking - ATM 2 nATM-PNC operation is the same from the DEFINITY® system perspective as if OC-3 is deployed end-to-end, except when traffic exceeds the carrying capacities of the IMA links, and contention occurs. — Similar to what occurs in an ATM network arrangement where IMA is not used but bandwidth is constricted over the ATM network when congestion occurs as the result of traffic...
Page 257
What’s New in DEFINITY ECS Release 8.2 Job Aid 555-233-754 Issue 1 April 2000 Networking Enhancements 251 Networking - ATM 2 nIntegrated announcement board resources are associated with extension numbers and are often triggered by vector directory numbers (VDNs). nR8r can be traffic engineered and administered to minimize the number of the expensive SVCs using existing software. nIn a large ATM PNC system distributed over many locations, use of 15A announcement units may be preferable to the use...
Page 258
What’s New in DEFINITY ECS Release 8.2 Job Aid 555-233-754 Issue 1 April 2000 Networking Enhancements 252 Networking - ATM 2 Improved Resource Allocation nATM bandwidth can be conserved, where possible, through optimal DEFINITY® resource allocation. — Resources that can be optimally placed can include general purpose tone receivers, TN750/B/C multiple announcement boards, and TN771 maintenance test boards. nR8r can support up to 10 TN750/B/C integrated announcement boards. — SVC connection is...
Page 259
What’s New in DEFINITY ECS Release 8.2 Job Aid 555-233-754 Issue 1 April 2000 Networking Enhancements 253 Networking - ATM 2 nTechnicians should consider lowering the Activation threshold, and raising the delay time threshold. nIf an ATM-IMP becomes alarmed unnecessarily, it is preferable to raise the delay threshold rather than raising the Activation threshold. System Setup Alarms nA System SETUP alarm uses the existing MO_ATM_IMP maintenance object. — Reported as either a minor type alarm or a...
Page 260
What’s New in DEFINITY ECS Release 8.2 Job Aid 555-233-754 Issue 1 April 2000 Networking Enhancements 254 Networking - ATM 2 nThe Off board ATM Network Alarms field will appear regardless of the option for ATM PNC, but will not appear if the system is a csi or si. nThe set options command can change alarm levels. nProvides the ability to downgrade the off board ATM-NTWK alarm level from minor to warning level, or vice versa. Administration SVC SETUP Alarming Maintenance Object nAlarms generated...