Home > Lucent Technologies > Communications System > Lucent Technologies Whats New In DEFINITY Enterprise Communications Server Release 8.2 Manual

Lucent Technologies Whats New In DEFINITY Enterprise Communications Server Release 8.2 Manual

Here you can view all the pages of manual Lucent Technologies Whats New In DEFINITY Enterprise Communications Server Release 8.2 Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 251

What’s New in DEFINITY ECS
Release 8.2 Job Aid  555-233-754  Issue 1
April 2000
Networking Enhancements 
245 Networking - ATM 
2
nATM Network Duplication configurations come equipped with a simplex 
SPE complex in the PPN, duplicate connectivity over ATM to all PNs and 
duplicate ATM interfaces in each PN. 
nThe EPN configuration for ATM Network Duplication is the same as that for 
an EPN equipped for ATM critical reliability.
nDuplicated paths to the ATM WAN may be through the same ATM switch,...

Page 252

What’s New in DEFINITY ECS
Release 8.2 Job Aid  555-233-754  Issue 1
April 2000
Networking Enhancements 
246 Networking - ATM 
2
nBoth an expansion control carrier and a port carrier are required in each 
EPN. 
nEach of the two TN2305 or TN2306 ATM interfaces and tone clocks are 
placed in each of the two carriers. 
nA TN771 facility test circuit pack is required in each port network of a R8r 
system equipped for ATM Network Duplication. DEFINITY® system 
software does not prevent placement of 2 ATM...

Page 253

What’s New in DEFINITY ECS
Release 8.2 Job Aid  555-233-754  Issue 1
April 2000
Networking Enhancements 
247 Networking - ATM 
2
nOnce the ATM Interfaces, tone clocks, and ATM B-PNC addresses have 
been administered for all EPNs, the change system-parameters duplication 
command is issued. This brings up the DUPLICATION-RELATED SYSTEM 
PARAMETERS form. The Enable Operation of PNC Duplication? option is 
then changed to y. The option for Enable Operation of SPE Duplication? 
must remain as n.
System...

Page 254

What’s New in DEFINITY ECS
Release 8.2 Job Aid  555-233-754  Issue 1
April 2000
Networking Enhancements 
248 Networking - ATM 
2
Duplication configuration
Steps
nbusyout pnc-standby
nchange sys dup (turn off PNC duplication)
nreplace boards on the standby PNC
nchange sys dup (turn on PNC duplication)
nreset pnc interchange
nrepeat above with other side
nsave translations
Upgrades
nTN2305/TN2306 ATM interfaces can be used for R8r ATM PNC 
capabilities. 
nThe TN2305/TN2306 ATM Interfaces must be used with...

Page 255

What’s New in DEFINITY ECS
Release 8.2 Job Aid  555-233-754  Issue 1
April 2000
Networking Enhancements 
249 Networking - ATM 
2
Interworking with Bandwidth Constricted ATM 
Networks
Conserving ATM Bandwidth Introduction
This is a recommendation to allow DEFINITY® R8r systems using ATM Port 
Network Connectivity to perform optimally when bandwidth is at a premium. 
nATM bandwidth can be conserved, where possible, through optimal 
DEFINITY® resource allocation.
— Resources that can be optimally placed can...

Page 256

What’s New in DEFINITY ECS
Release 8.2 Job Aid  555-233-754  Issue 1
April 2000
Networking Enhancements 
250 Networking - ATM 
2
nATM-PNC operation is the same from the DEFINITY® system perspective 
as if OC-3 is deployed end-to-end, except when traffic exceeds the carrying 
capacities of the IMA links, and contention occurs. 
— Similar to what occurs in an ATM network arrangement where IMA is 
not used but bandwidth is constricted over the ATM network when 
congestion occurs as the result of traffic...

Page 257

What’s New in DEFINITY ECS
Release 8.2 Job Aid  555-233-754  Issue 1
April 2000
Networking Enhancements 
251 Networking - ATM 
2
nIntegrated announcement board resources are associated with extension 
numbers and are often triggered by vector directory numbers (VDNs). 
nR8r can be traffic engineered and administered to minimize the number of 
the expensive SVCs using existing software.
nIn a large ATM PNC system distributed over many locations, use of 15A 
announcement units may be preferable to the use...

Page 258

What’s New in DEFINITY ECS
Release 8.2 Job Aid  555-233-754  Issue 1
April 2000
Networking Enhancements 
252 Networking - ATM 
2
Improved Resource Allocation
nATM bandwidth can be conserved, where possible, through optimal 
DEFINITY® resource allocation. 
— Resources that can be optimally placed can include general 
purpose tone receivers, TN750/B/C multiple announcement boards, 
and TN771 maintenance test boards. 
nR8r can support up to 10 TN750/B/C integrated announcement boards. 
— SVC connection is...

Page 259

What’s New in DEFINITY ECS
Release 8.2 Job Aid  555-233-754  Issue 1
April 2000
Networking Enhancements 
253 Networking - ATM 
2
nTechnicians should consider lowering the Activation threshold, and raising 
the delay time threshold. 
nIf an ATM-IMP becomes alarmed unnecessarily, it is preferable to raise the 
delay threshold rather than raising the Activation threshold.
System Setup Alarms
nA System SETUP alarm uses the existing MO_ATM_IMP maintenance 
object. 
— Reported as either a minor type alarm or a...

Page 260

What’s New in DEFINITY ECS
Release 8.2 Job Aid  555-233-754  Issue 1
April 2000
Networking Enhancements 
254 Networking - ATM 
2
nThe Off board ATM Network Alarms field will appear regardless of the 
option for ATM PNC, but will not appear if the system is a csi or si.
nThe set options command can change alarm levels. 
nProvides the ability to downgrade the off board ATM-NTWK alarm level 
from minor to warning level, or vice versa.
Administration
SVC SETUP Alarming Maintenance Object
nAlarms generated...
Start reading Lucent Technologies Whats New In DEFINITY Enterprise Communications Server Release 8.2 Manual

Related Manuals for Lucent Technologies Whats New In DEFINITY Enterprise Communications Server Release 8.2 Manual

All Lucent Technologies manuals