Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Maintenance For Survivable Remote EPN Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Maintenance For Survivable Remote EPN Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Installation And Maintenance For Survivable Remote EPN Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 41
DEFINITY® Enterprise Communications Server Release 7 Installation and Maintenance for Survivable Remote EPN 555-233-102 Issue 2 June 1999 SREPN Installation 1-19 Administer the Release 7r and SRP 1 2. Disp lay the hard ware in the SREPN b y typ ing display circuit-packs (the port network number of the SREPN) and pressing En t e r. NOTE: The p ort network numb ers d iffer b etween the Release 7r and the SRP. On the Release 7r manag ement terminal, the p ort network that you may b e d isp...
Page 42
DEFINITY® Enterprise Communications Server Release 7 Installation and Maintenance for Survivable Remote EPN 555-233-102 Issue 2 June 1999 SREPN Installation 1-20 Administer the Release 7r and SRP 1 5. Ad d all of the trunk group information (d isp layed on the Release 7r manag ement terminal) to the SRP management terminal. NOTE: The p ort network numb ers d iffer b etween the Release 7r and the SRP. On the Release 7r manag ement terminal, the p ort network that you may b e d isp laying is...
Page 43
DEFINITY® Enterprise Communications Server Release 7 Installation and Maintenance for Survivable Remote EPN 555-233-102 Issue 2 June 1999 SREPN Installation 1-21 Administer the Release 7r and SRP 1 4. On the SRP manag ement terminal, typ e add station (extension is the same station extension as ab ove) and p ress En t e r. 5. Dup lic ate all of the station information d isp layed on the Release 7r manag ement terminal to the SRP manag ement terminal. NOTE: Rememb er to ad d any ad d...
Page 44
DEFINITY® Enterprise Communications Server Release 7 Installation and Maintenance for Survivable Remote EPN 555-233-102 Issue 2 June 1999 SREPN Installation 1-22 Administer the Release 7r and SRP 1 2. Ad d the information to the SRP manag ement terminal. For examp le, typ e change feature-access-codes and press En te r. 3. Type save translation (optional) and press En te r. Administering the maintenance parameters Pag e 1 of the system-p arameters maintenanc e form c ontains 2 fields that must...
Page 45
DEFINITY® Enterprise Communications Server Release 7 Installation and Maintenance for Survivable Remote EPN 555-233-102 Issue 2 June 1999 SREPN Installation 1-23 Replace Release 7r circuit packs 1 To administer the sync sourc e for the SRP: 1. On the SRP manag ement terminal, typ e change synchronization and p ress En t e r. 2. Enter a DS1 trunk c irc uit p ac k on the SRP as the primary sync sourc e. 3. Press En t e r. NOTE: When the system is in the survive mod e, the sync hronization of...
Page 46
DEFINITY® Enterprise Communications Server Release 7 Installation and Maintenance for Survivable Remote EPN 555-233-102 Issue 2 June 1999 SREPN Installation 1-24 Replace EPN circuit packs and make cable connections 1 Connect DS1CONV cables for standard/high reliability 1. Connec t the eq uip ment as shown in Fig ure 1-10. 2. Power up the EPN. 3. Go to the ‘‘ Test the SRP’’ sec tion. Connect DS1CONV cables for critical reliability 1. Connec t the eq uip ment as shown in Fig ure 1-11. 2. Power up the...
Page 47
DEFINITY® Enterprise Communications Server Release 7 Installation and Maintenance for Survivable Remote EPN 555-233-102 Issue 2 June 1999 SREPN Installation 1-25 Replace EPN circuit packs and make cable connections 1 Figure 1-10. EPN DS1CONV standard/high reliability cable connectionsFigure Notes 1. MCC c ab inet 2. EPN c arrier A 3. DS1 c ab le from Port Network Connec tivity (PNC) A link 4. DS1CONV 2-foot (60.96 c m) Y c ab le (Tie wrap the cab le to the c ab inet.) 5. 9823A transceiver 6. 9823A...
Page 48
DEFINITY® Enterprise Communications Server Release 7 Installation and Maintenance for Survivable Remote EPN 555-233-102 Issue 2 June 1999 SREPN Installation 1-26 Replace EPN circuit packs and make cable connections 1 Figure 1-11. EPN DS1CONV critical reliability cable connectionsFigure Notes 1. MCC c ab inet 2. EPN c arrier B 3. EPN c arrier A 4. DS1 c ab les from Port Network Connec tivity (PNC) A and B links 5. DS1CONV 2-foot (60.96 c m) Y c ab le (Tie wrap the cab le to the c ab inet.) 6....
Page 49
DEFINITY® Enterprise Communications Server Release 7 Installation and Maintenance for Survivable Remote EPN 555-233-102 Issue 2 June 1999 SREPN Installation 1-27 Replace EPN circuit packs and make cable connections 1 Figure 1-12. EPN Direct fiber standard/high reliability cable connectionsFigure Notes 1. SCC cab inet 2. 9823A transceiver on the EI connec tor 3. B25A 25-p air cab le 4. Main Distrib ution Frame (MDF)5. Fib er op tic cab le 6. From the EPN A TX and RX connec tors on the rear of the...
Page 50
DEFINITY® Enterprise Communications Server Release 7 Installation and Maintenance for Survivable Remote EPN 555-233-102 Issue 2 June 1999 SREPN Installation 1-28 Replace EPN circuit packs and make cable connections 1 Figure 1-13. EPN Direct fiber critical reliability cable connectionsFigure Notes 1. MCC c ab inet 2. EPN c arrier B 3. EPN c arrier A 4. 9823A transceiver on the EI connec tor 5. Fib er op tic cab les6. From the EPN B TX and RX connec tors on the rear of the SRP 7. Main Distribution...