Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 71

Troubleshooting IP Solutions 
51
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
2  H.323 Trunks
The solution to this problem is to set up a separate signaling group for each trunk 
group, as shown in Figure 3. More generally, set up a separate signaling group for 
each set of trunk groups that have common attributes.
Figure 2. Shared signaling group
Figure 3. Separate signaling group
No MedPro resources 
available
If two switches are connected via an H.323 trunk and...

Page 72

Troubleshooting IP Solutions 2  H.323 Trunks
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
52
IP Softphone Problem Solving
Codecs used with 
NetmeetingVoice quality for the road-warrior application of DEFINITY IP softphone will vary 
depending on several factors. Poor voice quality can be caused by the use of the 
high-compression codecs (G.723 or G.729) in situations where the low-compression 
codec (G.711) should be used. This can happen unexpectedly when using...

Page 73

53Administration for Network Connectivity555-233-504 — Issue 1 — April 2000  CID: 77730
3 C-LAN Administration
This chapter describes how to administer TCP/IP data connections between DEFINITY ECS 
switches using the C-LAN circuit pack. This chapter does not cover the use of the IP Interface 
circuit pack for H.323 connectivity.
Overview
This chapter provides an update of the R7 administration procedures, which were 
described in Chapter 2, “DCS Administration,” of issue 1 of this book. The R8 
changes...

Page 74

Overview 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
54
Checklist for Prerequisite Administration
This is a checklist of things that need to be completed before you can proceed with the 
network administration tasks. Review this checklist before starting the administration 
tasks. 
4Checklist Item
The prerequisite administration needed depends on whether the system is new or 
is being upgraded from an R7 or pre-R7 system to R8. Use the...

Page 75

Overview 
55
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
3  Remove old circuit packs:
~Turn off the power.
~For the csi model, remove the Processor (TN798) circuit pack (Don’t 
remove the processor circuit pack if it is a TN798B).
~For the si model, remove the Processor (TN790), PACCON (TN778), 
and NETCON (TN777) circuit packs. If there are X.25 connections 
that the customer wants to keep, leave the PI (TN765) circuit pack in 
the switch;...

Page 76

Overview 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
56
Configurations
The task descriptions are presented in six relatively simple configurations. Each 
configuration describes how to administer either a 2-switch connection or a 3-switch 
gateway connection. The procedures for administering these configurations can be 
used either individually or in groups as “building blocks” for constructing most 
networks involving DEFINITY ECS R8 and...

Page 77

Overview 
57
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
TCP/IP connections (ppp or ethernet) require DEFINITY ECS Release 7 or later 
hardware and software. ISDN and BX.25 connections are supported on switches 
upgrading to R8 and pre-R7 switches can be connected to R8 switches via ISDN or 
BX.25. However, new systems will not be sold with X.25 connections. Therefore, all 
switches in the five configurations are assumed to be upgraded to...

Page 78

Overview 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
58
In the hardware part of the diagram, the paths for voice and signaling data are shown 
by dashed or dotted lines. The data for voice and call-setup signaling usually takes a 
different path through the switch hardware from the path for DCS and ISDN signaling 
data. These two types of data are distinguished in the hardware part of the diagram by 
the following convention.
A dashed...

Page 79

Overview 
59
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
Intuity AUDIX LAN Setup Summary
The following list summarizes the steps for setting up an Intuity AUDIX on a LAN.
1  Assign node name and IP address
2  Assign UNIX machine name, IP address, configure LAN card. 
“Networking Administration, TCP/IP Administration”
3  Assign country and switch type
“Switch Interface Administration, Switch Selection”
4  Assign extension length, Host Switch...

Page 80

Configuration 1: R8r  R8si 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
60
Configuration 1: R8r   R8si 
Configuration 1 is a ppp connection between a DEFINITY ECS R8r and a 
DEFINITY ECS R8si switch in a DCS network.
 
Task Summary
Complete the following tasks for Switch 1 and Switch 2:
1  Review prerequisite administration checklist
2  NODE 1 administration
 a  Assign node names
 b  Assign link (via a data module) to node-2
 c  Assign...
Start reading Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual

All Lucent Technologies manuals