Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 71
Troubleshooting IP Solutions 51 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 2 H.323 Trunks The solution to this problem is to set up a separate signaling group for each trunk group, as shown in Figure 3. More generally, set up a separate signaling group for each set of trunk groups that have common attributes. Figure 2. Shared signaling group Figure 3. Separate signaling group No MedPro resources available If two switches are connected via an H.323 trunk and...
Page 72
Troubleshooting IP Solutions 2 H.323 Trunks Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 52 IP Softphone Problem Solving Codecs used with NetmeetingVoice quality for the road-warrior application of DEFINITY IP softphone will vary depending on several factors. Poor voice quality can be caused by the use of the high-compression codecs (G.723 or G.729) in situations where the low-compression codec (G.711) should be used. This can happen unexpectedly when using...
Page 73
53Administration for Network Connectivity555-233-504 — Issue 1 — April 2000 CID: 77730 3 C-LAN Administration This chapter describes how to administer TCP/IP data connections between DEFINITY ECS switches using the C-LAN circuit pack. This chapter does not cover the use of the IP Interface circuit pack for H.323 connectivity. Overview This chapter provides an update of the R7 administration procedures, which were described in Chapter 2, “DCS Administration,” of issue 1 of this book. The R8 changes...
Page 74
Overview 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 54 Checklist for Prerequisite Administration This is a checklist of things that need to be completed before you can proceed with the network administration tasks. Review this checklist before starting the administration tasks. 4Checklist Item The prerequisite administration needed depends on whether the system is new or is being upgraded from an R7 or pre-R7 system to R8. Use the...
Page 75
Overview 55 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration 3 Remove old circuit packs: ~Turn off the power. ~For the csi model, remove the Processor (TN798) circuit pack (Don’t remove the processor circuit pack if it is a TN798B). ~For the si model, remove the Processor (TN790), PACCON (TN778), and NETCON (TN777) circuit packs. If there are X.25 connections that the customer wants to keep, leave the PI (TN765) circuit pack in the switch;...
Page 76
Overview 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 56 Configurations The task descriptions are presented in six relatively simple configurations. Each configuration describes how to administer either a 2-switch connection or a 3-switch gateway connection. The procedures for administering these configurations can be used either individually or in groups as “building blocks” for constructing most networks involving DEFINITY ECS R8 and...
Page 77
Overview 57 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration TCP/IP connections (ppp or ethernet) require DEFINITY ECS Release 7 or later hardware and software. ISDN and BX.25 connections are supported on switches upgrading to R8 and pre-R7 switches can be connected to R8 switches via ISDN or BX.25. However, new systems will not be sold with X.25 connections. Therefore, all switches in the five configurations are assumed to be upgraded to...
Page 78
Overview 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 58 In the hardware part of the diagram, the paths for voice and signaling data are shown by dashed or dotted lines. The data for voice and call-setup signaling usually takes a different path through the switch hardware from the path for DCS and ISDN signaling data. These two types of data are distinguished in the hardware part of the diagram by the following convention. A dashed...
Page 79
Overview 59 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Intuity AUDIX LAN Setup Summary The following list summarizes the steps for setting up an Intuity AUDIX on a LAN. 1 Assign node name and IP address 2 Assign UNIX machine name, IP address, configure LAN card. “Networking Administration, TCP/IP Administration” 3 Assign country and switch type “Switch Interface Administration, Switch Selection” 4 Assign extension length, Host Switch...
Page 80
Configuration 1: R8r R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 60 Configuration 1: R8r R8si Configuration 1 is a ppp connection between a DEFINITY ECS R8r and a DEFINITY ECS R8si switch in a DCS network. Task Summary Complete the following tasks for Switch 1 and Switch 2: 1 Review prerequisite administration checklist 2 NODE 1 administration a Assign node names b Assign link (via a data module) to node-2 c Assign...