Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 151
Configuration 4: R8csi R8si Gateway R8csi 131 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration > Submit the screen End Destination NodeName of the far-end node for this channel. This must be a name entered on the Node Names screen. For ppp connections, it must match the Destination Node Name entered on the ppp Data Module screen. Destination PortA value of 0 allows any available interface channel on the destination node to be used for...
Page 152
Configuration 4: R8csi R8si Gateway R8csi 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 132 Switch 1 Task — Assign Signaling Group and administered NCA TSC This task assigns a signaling group and an administered NCA TSC for the ISDN connection to Switch 2. Begin Steps> > Open the Signaling Groups form — enter ch sig n > Enter values > Press the Next Page key change signaling-group next...
Page 153
Configuration 4: R8csi R8si Gateway R8csi 133 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration > Enter values Page 2 of 5 ADMINISTERED NCA TSC ASSIGNMENT Service/Feature: __________ As-needed Inactivity Time-out (min): __ TSC Local Mach. Index Ext. Enabled Established Dest. Digits Appl. ID 1: 2951_ y permanent 1701___________ dcs____ 2_...
Page 154
Configuration 4: R8csi R8si Gateway R8csi 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 134 > Submit the screen End Dest. Digits Extension number of the ISDN interface on the Switch-2 DS1 circuit pack. Appl. Specifies that TSC #2 will carry signaling that will be converted in Switch-1 to another protocol (TCP/IP), which will then be forwarded to Switch-3. Mach ID Leave blank for gateway Field Conditions/Comments 2 of 2
Page 155
Configuration 4: R8csi R8si Gateway R8csi 135 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 1 Task — Assign ISDN-TSC Gateway This task assigns the ISDN TSC gateway channels needed for ISDN signaling between node 1 and node2 Begin Steps > Open the ISDN TSC Gateway Channel Assignment form — enter ch isdn tsc > Enter values > Submit the screen End change isdn tsc-gateway Page 1 of 2...
Page 156
Configuration 4: R8csi R8si Gateway R8csi 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 136 Switch 2 Task — Assign Signaling Group and administered NCA TSC This task assigns a signaling group and an administered NCA TSC for the ISDN connection to Switch 1. Begin Steps > Open the Signaling Groups form — enter ch sig n > Enter values change signaling-group next Page 1 of 5...
Page 157
Configuration 4: R8csi R8si Gateway R8csi 137 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration > Press the Next Page key > Enter values Page 2 of 5 ADMINISTERED NCA TSC ASSIGNMENT Service/Feature: __________ As-needed Inactivity Time-out (min): __ TSC Local Mach. Index Ext. Enabled Established Dest. Digits Appl. ID 1: 1701_ y permanent...
Page 158
Configuration 4: R8csi R8si Gateway R8csi 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 138 > Submit the screen End Dest. Digits Extension number of the ISDN interface for TSC #2on the Switch-1 DS1 circuit pack. Appl. TSC #2 carries DCS signaling between Switch 2 and Switch 1. As specified on the Switch-1 NCA TSC Assignment screen, TSC #2 is administered as a gateway on Switch 1, where the ISDN signals are converted to TCP/IP. Mach...
Page 159
Configuration 4: R8csi R8si Gateway R8csi 139 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 3 Task — Enable Bus Bridge Connectivity This task enables the bus bridge functionality on the C-LAN circuit pack to provide a path between the packet bus and the processor. Note:Bus Bridge Connectivity is used on the csi model only. This task may have been complete when the C-LAN circuit pack was installed. Begin Steps > Open the...
Page 160
Configuration 4: R8csi R8si Gateway R8csi 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 140 Switch 3 Task — Assign Node Names This task assigns node names and IP addresses to each node in the network. This screen is administered on Switch 3. A Node Names screen must be administered on each switch in the network. The node names and IP addresses in any network should be assigned in a logical and consistent manner from the point of view...