Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual

Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual

Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 151

Configuration 4:  R8csi  R8si Gateway 
 R8csi 
131
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
> Submit the screen
End
Destination 
NodeName of the far-end node for this channel. This must be a name 
entered on the Node Names screen. For ppp connections, it must 
match the Destination Node Name entered on the ppp Data 
Module screen.
Destination 
PortA value of 0 allows any available interface channel on the 
destination node to be used for...

Page 152

Configuration 4:  R8csi  R8si Gateway 
 R8csi 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
132
Switch 1 Task — Assign Signaling Group and administered NCA TSC
This task assigns a signaling group and an administered NCA TSC for the ISDN 
connection to Switch 2.
Begin
Steps>
> Open the Signaling Groups form — enter ch sig n
> Enter values
> Press the Next Page key
change signaling-group next...

Page 153

Configuration 4:  R8csi  R8si Gateway 
 R8csi 
133
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
> Enter values
              Page 2 of 5
ADMINISTERED NCA TSC ASSIGNMENT 
Service/Feature: __________           As-needed Inactivity Time-out (min): __
 TSC   Local                                                   Mach.
Index   Ext.  Enabled Established   Dest. Digits    Appl.   ID
  1:   2951_
     y     permanent  1701___________  dcs____  2_...

Page 154

Configuration 4:  R8csi  R8si Gateway 
 R8csi 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
134
> Submit the screen
End
Dest. Digits Extension number of the ISDN interface on the Switch-2 DS1 
circuit pack.
Appl. Specifies that TSC #2 will carry signaling that will be converted in 
Switch-1 to another protocol (TCP/IP), which will then be 
forwarded to Switch-3.
Mach ID Leave blank for gateway Field Conditions/Comments
2 of 2 

Page 155

Configuration 4:  R8csi  R8si Gateway 
 R8csi 
135
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
Switch 1 Task — Assign ISDN-TSC Gateway
This task assigns the ISDN TSC gateway channels needed for ISDN signaling 
between node 1 and node2
Begin
Steps
> Open the ISDN TSC Gateway Channel Assignment form — enter  ch isdn tsc
> Enter values
> Submit the screen
End
change isdn tsc-gateway                                         Page   1 of   2...

Page 156

Configuration 4:  R8csi  R8si Gateway 
 R8csi 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
136
Switch 2 Task — Assign Signaling Group and administered NCA TSC
This task assigns a signaling group and an administered NCA TSC for the ISDN 
connection to Switch 1.
Begin
Steps
> Open the Signaling Groups form — enter ch sig n
> Enter values
change signaling-group next
                                                      Page 1 of 5...

Page 157

Configuration 4:  R8csi  R8si Gateway 
 R8csi 
137
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
> Press the Next Page key
> Enter values
              Page 2 of 5
ADMINISTERED NCA TSC ASSIGNMENT 
Service/Feature: __________           As-needed Inactivity Time-out (min): __
 TSC   Local                                                   Mach.
Index   Ext.  Enabled Established   Dest. Digits    Appl.   ID
  1:   1701_
     y     permanent...

Page 158

Configuration 4:  R8csi  R8si Gateway 
 R8csi 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
138
> Submit the screen
End
Dest. Digits Extension number of the ISDN interface for TSC #2on the 
Switch-1 DS1 circuit pack.
Appl. TSC #2 carries DCS signaling between Switch 2 and Switch 1. 
As specified on the Switch-1 NCA TSC Assignment screen, 
TSC #2 is administered as a gateway on Switch 1, where the 
ISDN signals are converted to TCP/IP.
Mach...

Page 159

Configuration 4:  R8csi  R8si Gateway 
 R8csi 
139
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
Switch 3 Task — Enable Bus Bridge Connectivity
This task enables the bus bridge functionality on the C-LAN circuit pack to provide a 
path between the packet bus and the processor.
Note:Bus Bridge Connectivity is used on the csi model only. This task may 
have been complete when the C-LAN circuit pack was installed.
Begin
Steps
> Open the...

Page 160

Configuration 4:  R8csi  R8si Gateway 
 R8csi 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
140
Switch 3 Task — Assign Node Names
This task assigns node names and IP addresses to each node in the network. This 
screen is administered on Switch 3. A Node Names screen must be administered on 
each switch in the network.
The node names and IP addresses in any network should be assigned in a logical and 
consistent manner from the point of view...
Start reading Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual

All Lucent Technologies manuals