Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual

Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual

Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 141

Configuration 3:R8si R8r Gateway 
 R8si 
121
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
Switch 3 Task — Assign Processor Channels 
This task associates data links (hardware) with processor channels (software) on 
Switch 3.
Begin
Steps
> Open Processor Channel Assignment form — enter  ch com p
Note:The Processor Channel number, the Interface Channel number, and the 
Local and Remote Session numbers do not need to be the same number 
but...

Page 142

Configuration 3:R8si R8r Gateway 
 R8si 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
122
> Submit the screen the screen
End
Destination Port The Destination Port number must match the Interface 
Channel number for this connection on the Switch-1 
Processor Channel screen.
Session - Local The Local and Remote Session numbers can be any value 
between 1 and 256 (si model) or 384 (r model), but they 
must be consistent between endpoints. For...

Page 143

Configuration 3:R8si R8r Gateway 
 R8si 
123
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
Enable links and processor channels
You must enable links and processor channels before the connections can be used.
To enable a link, open its data module screen (ch da [ext]) and set the Enable 
Link? field to y. 
[note: to view a list of assigned data modules and their extensions, enter the “list 
data-module” command (l da)]
To enable the processor...

Page 144

Configuration 4:  R8csi  R8si Gateway 
 R8csi 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
124
Configuration 4:  R8csi  R8si Gateway  R8csi 
In this configuration, a DEFINITY ECS R8r provides gateway conversion between 
ISDN and TCP/IP.
Task Summary
The following tasks need to be completed for Switch 1, Switch 2, and Switch 3:
1  Review checklist
2  Switch 1 administration
 a  Assign node names
 b  Assign signaling group and administered...

Page 145

Configuration 4:  R8csi  R8si Gateway 
 R8csi 
125
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
Prerequisite Administration
There are some system administration tasks that need to be completed before you can 
proceed with the connectivity administration described in this section.
Review the checklist of prerequisite administration tasks in Checklist for Prerequisite 
Administration  (page 54), before proceeding with the connectivity...

Page 146

Configuration 4:  R8csi  R8si Gateway 
 R8csi 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
126
Switch 1 Task — Assign Node Names
This task assigns node names and IP addresses to each node in the network. This 
screen is administered on Switch 1. A Node Names screen must be administered on 
each switch in the network.
The node names and IP addresses in any network should be assigned in a logical and 
consistent manner from the point of view...

Page 147

Configuration 4:  R8csi  R8si Gateway 
 R8csi 
127
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
Switch 1 Task — Assign Link via ppp Data Module to Switch 3
This task administers a ppp data module for the ppp connection to node 3. The data 
module associates a link number with a port address, extension number, and node 
name for the C-LAN port used for this connection.
Begin
Steps
> 
Open Data Module form — enter ad da 5803
[This data module...

Page 148

Configuration 4:  R8csi  R8si Gateway 
 R8csi 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
128
> Submit the screen
End
BCC: Bearer Capability Class. This is a display-only field.
COS
The values for these fields will be specified by the system 
administrator. COR:
TN:
Node Name: The node name for the interface defined by this data module. 
This must be a name entered on the Node Names screen.
Establish 
Connection?y means that this switch...

Page 149

Configuration 4:  R8csi  R8si Gateway 
 R8csi 
129
Administration for Network Connectivity
555-233-504— Issue 1 — April 2000 CID: 77730
3  C-LAN Administration
Switch 1 Task — Assign Processor Channels
This task associates data links (hardware) with processor channels (software) on the 
node 1 switch.
Begin
Steps
> Open the Processor Channel Assignment form — enter  ch com p
> Enter values
change communications-interface processor-channels...

Page 150

Configuration 4:  R8csi  R8si Gateway 
 R8csi 3  C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
130
Destination 
NodeName of the far-end node for this channel. This must be a name 
entered on the Node Names screen. For ppp connections, it must 
match the Destination Node Name entered on the ppp Data 
Module screen.
Destination 
PortA value of 0 allows any available interface channel on the 
destination node to be used for this connection. The...
Start reading Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual

All Lucent Technologies manuals