Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 381

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Cable Ductwork 
C-5  
C
Table C-2. Installation Sequence 
Step Group Remarks
1 41 Install basic  d uc twork on eac h c ab inet
2 51 Install c ross-aisle shielded  d uc twork
3 10 or 26 Install I/O c ross-aisle or c ab inet to wall c able troug h
22-25 Install I/O c ross-aisle to wall troug h d uc t
48
or
9Install I/O c ab le rac k c oup ling to rear of c ab inet
or
install I/O c ab le rac k riser to...

Page 382

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Cable Ductwork 
C-6  
C
Figure C-2. Overhead View of a Typical Ductwork LayoutFigure Notes
1. Wall
2. Space for Future Cabinet
3. Plywood Wall and Cross-Connect Field
4. I/O Cable Rack Coupling to Rear of 
Cabinet
5. AC Power Cable Duct6. Shielded Intercabinet Fiber Optic 
Cables
7. I/O Duct to Cross-Connect Field
8. I/O Cross-Isle Trough
9. Front of Cabinets 

Page 383

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Cable Ductwork 
C-7  
C
Install Intercabinet Shielded Ducts
1. Loosen (d o not remove) the four b olts holding  the d ust c over to the c ab le 
ac c ess hole in the top  of the c abinet.
Figure C-3. Dust Cover Removal
2. Remove the dust cover by sliding it in the direction shown by the arrow in 
Fi g u re  C -3
. Move the d ust c over until it c lears the b olts.
3. Set the c ab inet riser (Fi g u...

Page 384

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Cable Ductwork 
C-8  
C
Figure C-4. Assembly of Intercabinet Shielded Ducts
4. Install risers on any other c ab inets that req uire shield ed -d uc t c onnec tions.
5. Set a shield ed  troug h b etween two c abinet risers. Push d own on the 
troug h so the slots in the end s of the troug h eng age the ears at the 
c orners of the risers. The walls of the troug h g o insid e the walls of the 
risers...

Page 385

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Cable Ductwork 
C-9  
C
9. If a g iven c ab inet is to sup p ort a c ross-aisle shield ed  d uc t, set a 
c ross-aisle riser on the c ab inet riser. Otherwise set a shield ed  c oup ling  on 
the c ab inet riser. In either c ase, p osition the d evic e so the two holes on the 
b ac k wall line up  with the holes on the b ac k wall of the c ab inet riser. Bolt 
the two p iec es tog ether at the holes...

Page 386

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Cable Ductwork 
C-10  
C
Figure C-5. Assembly of Cross-Aisle Shielded Ducts
2. Install c ross-aisle troug hs on any other c abinets req uiring  suc h 
c onnec tions.
3. If there is no troug h to install in one end  of the c ross-aisle riser, press a 
c ross-aisle shield ed  end  c ap  on the unused  end  of the riser. Unlike earlier 
d uc twork, the end c ap  fits either end  of the c ross-aisle...

Page 387

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Cable Ductwork 
C-11  
C
4. Route the ap p rop riate c ab les b etween the c ab inets just c onnec ted .
5. Set the shield ed  c ross-aisle troug h c over on top  of the trough with its sid e 
walls outsid e of the walls of the trough, and  p ress it d own until it 
c omp letely c overs the troug h.
Mating Cross-Aisle Risers to Old Cabinet Risers
The new shield ed  d uc twork is c onstruc ted  so c...

Page 388

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Cable Ductwork 
C-12  
C
Mating Shielded Ducts to Risers
The new shield ed  d uc twork is c onstruc ted  so new c ross-aisle troug hs c an b e 
attac hed  to risers of the former d esig n. They fit outsid e of the old er risers.
To attac h the new shield ed  troug h to a riser, first set it und er the troug h on the 
riser and  install the other side of the trough as alread y d esc rib ed . Lift the...

Page 389

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Cable Ductwork 
C-13  
C
Figure C-8. Install Cross-Aisle I/O Ductwork or I/O Cross-Aisle to Wall 
Trough
NOTE:
If wall troug h is b eing  installed, loc ally p rovid ed  hard ware is req uired  at wall 
end  of d uc t.
Install Cross-Aisle to Wall Trough
Refer to Fi g u re  C - 9 to assemble the d uc twork:
1. Install wall mounting  b rac ket to desig nated  loc ation. Hardware to mount 
b rac ket...

Page 390

DEFINITY ECS Release 8.2 Installation and Test
for Multi-Carrier Cabinets  555-233-114  Issue 1
April 2000
Cable Ductwork 
C-14  
C
2. Use thread -forming  sc rews to attac h the 3-hole fac e of the ang le b rac ket 
to the I/O trough.
3. Attac h the ang le b rac ket to the 6-hole fac e of the c ross-aisle b rac ket using  
three 10-24 X 3/4 inc h sc rews, c onnec ted to nuts and  washers throug h the 
b ottom holes.
4. Attac h the I/O c able d uc t to the c ross-aisle b rac ket using  the 
thread...
Start reading Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual

All Lucent Technologies manuals