Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation And Test For Multi-Carrier Cabinets Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 381
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Cable Ductwork C-5 C Table C-2. Installation Sequence Step Group Remarks 1 41 Install basic d uc twork on eac h c ab inet 2 51 Install c ross-aisle shielded d uc twork 3 10 or 26 Install I/O c ross-aisle or c ab inet to wall c able troug h 22-25 Install I/O c ross-aisle to wall troug h d uc t 48 or 9Install I/O c ab le rac k c oup ling to rear of c ab inet or install I/O c ab le rac k riser to...
Page 382
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Cable Ductwork C-6 C Figure C-2. Overhead View of a Typical Ductwork LayoutFigure Notes 1. Wall 2. Space for Future Cabinet 3. Plywood Wall and Cross-Connect Field 4. I/O Cable Rack Coupling to Rear of Cabinet 5. AC Power Cable Duct6. Shielded Intercabinet Fiber Optic Cables 7. I/O Duct to Cross-Connect Field 8. I/O Cross-Isle Trough 9. Front of Cabinets
Page 383
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Cable Ductwork C-7 C Install Intercabinet Shielded Ducts 1. Loosen (d o not remove) the four b olts holding the d ust c over to the c ab le ac c ess hole in the top of the c abinet. Figure C-3. Dust Cover Removal 2. Remove the dust cover by sliding it in the direction shown by the arrow in Fi g u re C -3 . Move the d ust c over until it c lears the b olts. 3. Set the c ab inet riser (Fi g u...
Page 384
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Cable Ductwork C-8 C Figure C-4. Assembly of Intercabinet Shielded Ducts 4. Install risers on any other c ab inets that req uire shield ed -d uc t c onnec tions. 5. Set a shield ed troug h b etween two c abinet risers. Push d own on the troug h so the slots in the end s of the troug h eng age the ears at the c orners of the risers. The walls of the troug h g o insid e the walls of the risers...
Page 385
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Cable Ductwork C-9 C 9. If a g iven c ab inet is to sup p ort a c ross-aisle shield ed d uc t, set a c ross-aisle riser on the c ab inet riser. Otherwise set a shield ed c oup ling on the c ab inet riser. In either c ase, p osition the d evic e so the two holes on the b ac k wall line up with the holes on the b ac k wall of the c ab inet riser. Bolt the two p iec es tog ether at the holes...
Page 386
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Cable Ductwork C-10 C Figure C-5. Assembly of Cross-Aisle Shielded Ducts 2. Install c ross-aisle troug hs on any other c abinets req uiring suc h c onnec tions. 3. If there is no troug h to install in one end of the c ross-aisle riser, press a c ross-aisle shield ed end c ap on the unused end of the riser. Unlike earlier d uc twork, the end c ap fits either end of the c ross-aisle...
Page 387
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Cable Ductwork C-11 C 4. Route the ap p rop riate c ab les b etween the c ab inets just c onnec ted . 5. Set the shield ed c ross-aisle troug h c over on top of the trough with its sid e walls outsid e of the walls of the trough, and p ress it d own until it c omp letely c overs the troug h. Mating Cross-Aisle Risers to Old Cabinet Risers The new shield ed d uc twork is c onstruc ted so c...
Page 388
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Cable Ductwork C-12 C Mating Shielded Ducts to Risers The new shield ed d uc twork is c onstruc ted so new c ross-aisle troug hs c an b e attac hed to risers of the former d esig n. They fit outsid e of the old er risers. To attac h the new shield ed troug h to a riser, first set it und er the troug h on the riser and install the other side of the trough as alread y d esc rib ed . Lift the...
Page 389
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Cable Ductwork C-13 C Figure C-8. Install Cross-Aisle I/O Ductwork or I/O Cross-Aisle to Wall Trough NOTE: If wall troug h is b eing installed, loc ally p rovid ed hard ware is req uired at wall end of d uc t. Install Cross-Aisle to Wall Trough Refer to Fi g u re C - 9 to assemble the d uc twork: 1. Install wall mounting b rac ket to desig nated loc ation. Hardware to mount b rac ket...
Page 390
DEFINITY ECS Release 8.2 Installation and Test for Multi-Carrier Cabinets 555-233-114 Issue 1 April 2000 Cable Ductwork C-14 C 2. Use thread -forming sc rews to attac h the 3-hole fac e of the ang le b rac ket to the I/O trough. 3. Attac h the ang le b rac ket to the 6-hole fac e of the c ross-aisle b rac ket using three 10-24 X 3/4 inc h sc rews, c onnec ted to nuts and washers throug h the b ottom holes. 4. Attac h the I/O c able d uc t to the c ross-aisle b rac ket using the thread...