Home > GE > Medical Equipment > GE Logiq P5 Service Manual

GE Logiq P5 Service Manual

Here you can view all the pages of manual GE Logiq P5 Service Manual. The GE manuals for Medical Equipment are available online for free. You can easily download all the documents as PDF.

Page 491

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 10-3 - Maintenance Task Schedule 10 - 3
Table 10-2 Customer Care Schedule
Service at Indicated TimeDailyMonthlyQuarterly
Per Facilities 
QA Program
Notes
Clean Probes•** or before each use
Clean Probe Holders
•
Clean Air Filter•more frequently depending on 
your environment
Inspect AC Mains Cable
•Mobile Unit Check Weekly
Inspect Cables and Connectors
•
Clean Console•
Clean Monitor and Touch Panel•
Inspect Wheels, Casters,...

Page 492

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL  
10 - 4 Section 10-3 - Maintenance Task Schedule
Section 10-4 
Tools Required
10-4-1 Standard GE Tool Kit
The following is a description of the “Standard” GE tool  kit in the USA. Not all tools are required for PMs.
Table 10-3     Overview of GE-1 Tool Kit Contents 
Tool IDDescriptionTool IDDescription
9-45358 Pliers Retaining Ring 9-XL9971MM Xcelite-hex Blade 1.27mm
9-4078 Scribe 9-XL9972MM Xcelite-hex Blade 1.5mm
9-44572 Wrench Open...

Page 493

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 10-3 - Maintenance Task Schedule 10 - 5
9-65283 Case 8.5 in. x 4.5 in. x 2 in. Deep 9-45072 Pliers 6 inch Diagonal
9-46696 Hex Keys 9-XL100X Wire Stripper/Cutter 5 inch - 100X
9-39829 Torpedo Level, Magnetic 9-XL87CG Pliers - very fine needle nose-87CG
9-38461 Hammer, Ball Peen, 4 oz 9-WEWDT-07 Weller-Soldering-Replacement Tip(1)
9-4280 Universal Joint 1/4 inch 9-WS175-E Wiss - Surgical Scissors
9-WEW60P3 Weller - Soldering...

Page 494

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL  
10 - 6 Section 10-3 - Maintenance Task Schedule
10-4-2 Special Tools, Supplies and Equipment
10-4-2-1 Specific Requirements for Care & Maintenance
Table 10-5     Overview of Requirements for Care & Maintenance
Tool Part NumberComments
Digital Volt Meter (DVM)
Electric Safety Analyzer DALE 600 46-285652G1 For 120V Unit
Electric Safety Analyzer DALE  600E 46-328406G2
For 220V Units
Leakage Current Ultrasound Kit 2113015 For 120V and...

Page 495

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 10-3 - Maintenance Task Schedule 10 - 7
Section 10-5
System Maintenance
10-5-1 Preliminary Checks
The preliminary checks take about 15 minutes to perform. refe r to the system user documentation 
whenever necessary. 
Table 10-6    System Checks
StepItemDescription
1 Ask & Listen Ask the customer if they have any  problems or questions about the equipment.
2 Paperwork Fill in the top of the Ultrasound Inspection Cert
ificate...

Page 496

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL  
10 - 8 Section 10-3 - Maintenance Task Schedule
10-5-2 Functional Checks (See Also Chapter 4)
The functional checks take about 60 minutes to  perform. refer to the system user documentation 
whenever necessary.
10-5-2-1 System Checks 
NOTE: * Some software may be considered standard depending upon system model configuration. Table 10-7    System Functional Checks
Chec
k
StepDescription
B-Mode Verify basic B-Mode (2D) operation. Check...

Page 497

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 10-3 - Maintenance Task Schedule 10 - 9
10-5-2-2 Peripheral/Option Checks
If any peripherals or options are not part of the system configuration,  the check can be omitted. refer to 
the User Manual for a list of  approved peripherals/options.
10-5-3 Input Power
10-5-3-1 Mains Cable Inspection
 
10-5-4 Cleaning
10-5-4-1 General Cleaning
 
Table 10-8    GE Approved Peripheral/Hardware Option Functional Checks...

Page 498

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL  
10 - 10 Section 10-3 - Maintenance Task Schedule
10-5-4-2 Air Filter Cleaning
NOTE: For your convenience or of the air filter is to o dirty, replacement filters are available. refer to 
Chapter 9 for the air filter replacement part number.
10-5-5 Physical Inspection 
Table 10-11    Air Filter Cleaning - frequency varies with your environment
StepItemDescription
1 Remove Filter 
Cover refer to Chapter 8 for air filter location and...

Page 499

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL 
Section 10-3 - Maintenance Task Schedule 10 - 11
10-5-6 Optional Diagnostic Checks
Optionally you can access the diagnostic software as described in Chapters 5 or 7. View the error logs 
and run desired diagnostics.
10-5-6-1 View the Logs 1.) Review the system error log for any problems.
2.) Check the temperature log to see if there are any trends that could cause problems in the future.
3.) Check the Configuration Log; update if...

Page 500

GE HEALTHCARE
DIRECTION 5394141, REVISION  1LOGIQ™ P5 SERVICE MANUAL  
10 - 12 Section 10-6 - Electrical Safety Tests
Section 10-6
Electrical Safety Tests
10-6-1 Safety Test Overview
The electrical safety tests in this section are ba sed on and conform to NFPA 99 (For USA) and IEC 
60601-1 Medical Equipment Safety Standards. They ar e intended for the electrical safety evaluation of 
cord-connected, electrically operated, patient care equipment. If additional information is needed, refer 
to the NFPA 99...
Start reading GE Logiq P5 Service Manual

Related Manuals for GE Logiq P5 Service Manual

All GE manuals