Home > GE > Medical Equipment > GE Logiq 9 User Manual

GE Logiq 9 User Manual

Here you can view all the pages of manual GE Logiq 9 User Manual. The GE manuals for Medical Equipment are available online for free. You can easily download all the documents as PDF.

Page 21

Console Overview
LOGIQ E9 User Guide 1-11
Direction 5180302-100 Rev. 1
Monitor Display
 Figure 1-7. Monitor Display Tour
1.  Institution/Hospital Name, Date, Time, Operator 
Identification.
2.  Patient Name, Patient Identification.
3. Power Output Readout
4.  GE Symbol: Probe Orientation Marker.
5. Worksheet/Direct Report 
6. Measurement Summary Window.
7. Gray/Color Bar.
8. Image.
9. Measurement Calipers.
10. Measurement Results Window. 
11. Image Preview.
12. Image Clipboard.
13.  Probe Identifier....

Page 22

Getting Started
1-12 LOGIQ E9 User Guide
Direction 5180302-100 Rev. 1
Brightness 
Adjusting the monitors brightness is one of the most important 
factors for proper image quality. If these controls are set 
incorrectly, the Gain, TGC, Dynamic Range and even Power 
Output may have to be changed more often than necessary to 
compensate.
The proper setup displays a complete gray scale. The lowest 
level of black should just disappear into the background and the 
highest white should be bright, but not...

Page 23

Moving the System
LOGIQ E9 User Guide 1-13
Direction 5180302-100 Rev. 1
Moving the System
Before moving the system
1. Press the Power On/Off switch to power off the system. 
See ‘Power Off’ on page 1-19 for more information.
2.  Unplug the power cord.
3.  All cables from off-board peripheral devices (external Color 
Digital/Report printer, etc.) must be disconnected from the 
console.
4.  Ensure that no loose items are left on the console.
5.  Wind the power cable around the cable hook below the rear...

Page 24

Getting Started
1-14 LOGIQ E9 User Guide
Direction 5180302-100 Rev. 1
Before moving the system (continued)
8.  Store sufficient gel and other essential accessories in the 
provided space.
9.  Adjust the LCD monitor and control panel to their lowest 
positions by using the up/down switch on the front of the 
operator panel. Make sure the operator panel is locked in 
place.
10.  Unlock the wheels.
CAUTIONDO NOT place probes into the front pocket storage area 
when moving the system. This is not a storage...

Page 25

Moving the System
LOGIQ E9 User Guide 1-15
Direction 5180302-100 Rev. 1
When moving the system
1.  Always use the rear handle grips to move the system.
2.  Take extra care when moving the system long distances and 
on inclines. Ask for help if necessary.
Avoid ramps that are steeper than ten degrees to avoid 
tipping over the
 system. 
NOTE:  Wheel chair ramps are usually less than five degrees. 
Utilize additional care and personnel when moving on a 
steep incline (>5 degrees) or loading the system into...

Page 26

Getting Started
1-16 LOGIQ E9 User Guide
Direction 5180302-100 Rev. 1
Operator Panel Movement Controls
The system Operator Panel can be freely moved in all 
directions. The vertical displacement of the Operator Panel is 
motor driven. The control buttons are located adjacent to the 
handles. 
Figure 1-9. Operator Panel Movement Controls
To move the operator panel sideways, press and hold down the 
left button to release and move the Operator Panel sideways 
until it is in the desired position.
To park...

Page 27

Moving the System
LOGIQ E9 User Guide 1-17
Direction 5180302-100 Rev. 1
Setting the front wheels lock
The pedal is located between the front wheels of the unit and 
enables the user to control the movement of the wheels.
 Figure 1-10. Front Pedal
Table 1-3:  Front Pedal Functions
Pedal positionFunction
1.  Left—Swivel Lock Swivel Lock. To move the system, press the Swivel Lock to set 
the wheels in a forward-to-back position. First move the system 
in the direction you will be going, then press the...

Page 28

Getting Started
1-18 LOGIQ E9 User Guide
Direction 5180302-100 Rev. 1
System Start-Up
Power On 
Login
Personal IDs and associated passwords can be preset on the 
LOGIQ E9. 
If the Use Auto Logon preset is blank, you are prompted to login. 
Figure 1-11. Operator Login Window
1. Operator: Select the Operator.
2. Password: Enter Operator’s password (optional).
3.  Select type of Logon or Cancel.
• OK: Standard logon
• Cancel: Cancel logon
CAUTIONPress the Power On/Off switch to turn the power on. The...

Page 29

System Start-Up
LOGIQ E9 User Guide 1-19
Direction 5180302-100 Rev. 1
Power Off
To power off the system:
1.  When you shutdown the system, enter the scan screen and 
lightly press the Power On/Off switch at the front of the 
system once. The System-Exit window is displayed.
NOTE:  DO NOT press and hold down the Power On/Off switch to 
shutdown the system. Instead, lightly press the Power On/
Off switch and select Shutdown.
2. Using the Trackball, select Shutdown.
The shutdown process takes a few seconds...

Page 30

Getting Started
1-20 LOGIQ E9 User Guide
Direction 5180302-100 Rev. 1
Circuit breaker 
The Circuit Breaker is located at the rear panel of the system. 
When set to On, the Circuit Break supplies main power to all 
internal systems. When set to Off, the Circuit Breaker removes 
main power from all internal systems. The circuit breaker 
automatically shuts off power to the system in case of a power 
overload.
If a power overload occurs:
1.  Turn off all peripheral devices.
2.  Reactivate the Circuit...
Start reading GE Logiq 9 User Manual

Related Manuals for GE Logiq 9 User Manual

All GE manuals