Home > Panasonic > Communications System > Panasonic Digital Business System Section 300 Installation Guide

Panasonic Digital Business System Section 300 Installation Guide

Here you can view all the pages of manual Panasonic Digital Business System Section 300 Installation Guide. The Panasonic manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 31

Installation, Section 300 
Cabinet Installation 
Issue 2 
August 16,1993 
Installation for the DBS 40 
1. Place one battery in the top tray of the battery compartment, the other battery 
in the bottom tray. 
Rnff~ru Inmhn. nRS 4n 
I 
2. Connect the positive cable (red) to the + terminal of the top battery. 
3. Connect the connecting cable (white) to the - terminal of the top battery. 
4. Connect the negative cable (blue) to the - terminal of the bottom battery. 
5. Connect the connecting cable (white)...

Page 32

Installation, Section 300 
Issue 2 Cabinet installation 
August 
16; 1993 
Installation for the DBS 72 and 96 
1. Slide the battery compartment out and place the four batteries inside the tray. 
Figure 3-9. Baaety tray, OBS 72 and 96 
Remove Screws 
and Slide Battery 
Tray Out 
2. 
3. 
-4. Connect the positiye cable (red) to the + terminal on the frost battery. 
Connect the negative cable (blue) to the - terminal on the last battery. 
Connect the remaining positive and negative terminals with the white...

Page 33

Installation, Section 300 
Issue 2 Cabinet Installation 
August 16,1993 
Figure 3-I&Battery pack connection, DBS 72 and 96 
I 
White 
Connection 
Cables 
3-l 2  

Page 34

Installation, Section 300 
Cabinet Installation 
Issue 2 
August 16, 1993 
Kev Phone Wall Mountinq 
DBS key phones can be modified for wall mounting by reversing the wall- 
mount adaptor on the bottom of the phone. The wall-mount adaptor includes a 
small hole for attaching the phone to a screw inserted in the wall. 
1. Place the bottom edge of the telephone on a desk or other hard surface. 
2. Press the wall-mount adaptor down until it detaches from the phone (Figure 
Figure 3-11. Wall-r 
3-l 1). 
unt...

Page 35

Installation, Section 300 
Issue 2 Cabinet Installation 
August 16,1993 
3. 
Turn the wall-mount adaptor around and re-attach it to the phone. 
Figure 3-12. Wall-mo 
Wall-Mount 
Adaptor 
f 
3-l 4  

Page 36

Installation, Section 300 
Issue 2 Cabinet Installation 
August 16,1993 
4. 
Remove the handset guide with a small screwdriver, turn it over. and &insert 
_  it into the phone. 
Fimre 3-13.Handset puide insertion for wall-nwuntinn. kev ohone 
Handset 
Guide 
I I 
I I 
I 1 
I 1 
I 1 I I 
I I I 1 r 1 
L J 
r 1 
Handset 
I 
t 
L L I 
L r 
r 
I 
[ 
7 I 
I 
1 I I J 
I 
1 
I 
3-15  

Page 37

Installation, Section 300 
Issue 2 Cabinet installation 
August 16,1993 
DSLT Wall Mountinq 
Digital Single-Line Telephones (DSLTs) can be modified for wall mounting by 
removing the desk stand and mounting it on the bottom of the phone. The back 
of the DSLT and the desk stand include slots for attaching the phone to a screw 
inserted in the wall. 
1. Press the stand releases in toward the middle of the phone to release the desk 
stand (Figure 3-14). 
Figur ,ILDesk stand removal for DSLT wail munBn~...

Page 38

Installation, Section 300 
Issue 2 Cabinet Installation 
August-16, 1993 
2. Attach the desk stand to the bottom of the phone by aligning the tabs‘and tab 
guides and sliding it into place (Figure 3-15). 
_- 
Figure 45.Desk s&and attachment for DSLT wall mounting 
3-l 7  

Page 39

Installation, Section 300 
Issue 2 Cabinet installation 
August l&l993 
3. 
Remove the handset guide with a small screwdriver, turn it over, and reinsert 
it into the phone. 
3-16. Handset guide insertion for wall-mounting, 
DSLT 
Handset 
Guide 
I I I I 
I 1 
c 1 I I 
I 1 
1 
1 I ~~ 1 1 1 I I 
I 1 
1 
1 I I 1 1 
Handset 
3-l 8  

Page 40

Installation, Section 300 
Issue 2 Cabinet Installation 
August 16,1993 
Svst& Initialization 
1. Confirm that the DBS power switch is OFF. 
2. 
Plug the power cord into a dedicated 120V 15 amp AC wall outlet. 
Note: A surge protector should be installed on the power cord. 
3. Set SW1 on the CPC card to CLEAR. 
momnrw rlonr cwitrh 
4. Turn the power switch on. 
As the system loads, the bottom LED lamp on the CPC card will flash. 
5. Once the bottom LED lamp on the CPC card stops flashing, set SW 1 on the...
Start reading Panasonic Digital Business System Section 300 Installation Guide

Related Manuals for Panasonic Digital Business System Section 300 Installation Guide

All Panasonic manuals