Home
>
Panasonic
>
Communications System
>
Panasonic Digital Business System Section 300 Installation Guide
Panasonic Digital Business System Section 300 Installation Guide
Here you can view all the pages of manual Panasonic Digital Business System Section 300 Installation Guide. The Panasonic manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 21
Installation, Section 300 Issue 2 System Overview August 30, 1993 Printed circuit cards are installed in dedicated slots within the DBS cabinet: Table 2-3 shows the cards that can be installed in each slot. Figure 2-3 on page 2-8 illustrates slot labels. Table 2-3. Printed circuit package slot usage Card Type Card Acceptable Slots Analog Trunks 1 DID Digital Trunks l-1-1 Digital Lines 1 DEC Analog Lines f AEC Service Circuits SCC-A SCC-B Processor Cards 1 CPC-A 1 CPC-B TRK or EC/TRK...
Page 22
Installation, Section 300 Issue 2 System Overview August 30,1993 Figure 2, / Slot Labels (DBS 96) i Processor Description DBS call-processing is controlled by the Call Processor Card (CPC). Two CPC models are available: CPC-A and CPC-B. In most cases, the features provided with the DBS depend on the model and software version of the CPC. However, the availability of some features also depends on the model and version of the Service Circuit Card (SCC). i’ The following table shows some of...
Page 23
Installation, Section 300 Issue 2 Cabinet Installation August 16, 1993 Chapter 3. Cabinet Installation This chapter explains how to install and power up the cabinet. Before you begin installation, be sure to read the “Requirements” chapter, which begins on page l-l. 3-l
Page 24
Installation, Section 300 Issue 2 ..1^ Wall-Mountina the Cabinet Guidelines Cabinet installation August 16; 1993 CAUTION: Always turn the power switch OFF before beginning installation. l The DBS is shipped with the cover installed to protect components. Before wall-mounting the cabinet, remove the cover. l Handle the cabinet carefully to avoid damage. Installation 1. Remove the eight screws from the front and sides of the cabinet. 2. Take the front cover off by pulling it from the bottom...
Page 25
Installation, Section 300 Issue 2 Cabinet Ins!allation August 16, 1993 4. Attach the mounting brackets to the four comers of the back side of the cabinet. Figure 3-2. Cabinet mounting bracket I Metal Mounting Bracket 5. Lnstall four screws in the wall studs according to the dimensions given in Figure 3-3. (Note that the width dimension is different for the DBS 40.) The screws are used to attach the mounting brackets to the wall. The screws should protrude from the wall 5/16 in. Figure 3-3....
Page 26
Installation, Section 300 Issue 2 Cabinet Installation August 16,1993 Groundinq Guidelines l Before grounding the DBS, read the “Lightning Protection/Grounding” requirements beginning on page l-4. l The ground cable must be at least 18 AWG. l Resistance to ground must be 10 Ohms or less. Installation 1. Attach the ground cable to the ground screw on the front of the power supply. Figure 3-4. I 2. Connect the ground cable to the building ground. binet mound screw --- -- ------ 8....
Page 27
Installation, Section 300 Issue 2 Card Installation Guidelines Cabinet Installation August 16, 1993 CAUTION: Before handling printed circuit cards, discharge static electricity by grounding yourself. Static electricity can damage components. Turn off the power before installing cards. Installing cards with the power on can damage components. l Install the cards in the following order: - TRK - DEC - AEC or API - see - CPC - MFRorCBL l If you’re installing a CPC-A card with a SCC-B card,...
Page 28
Installation, Section 300 Cabinet installation Issue 2 August 16,1993 l Before installing the CPC card, determine if the DBS will be used as a‘KSU or PBX. To use as a PBX, cut Strap S 1 on the CPC. Cutting this strap allows use of pooled trunks as opposed to line appearances. l Install cards only in their dedicated slots. The slot type is marked on the cabinet directly above each slot. 3-7
Page 29
Installation, Section 300 Issue 2 lnstalla tion Cabinet Installation August 16, 1993 1. With the lettering on the card pointed up, position the card within the slot guides. (See Figure 3-7.) 2. Hold the card on the top and bottom edges with both hands and carefully push the card into the slot. 3. When the connector at the far end of the card touches the corresponding connector on the backplane, press the card in until it is firmly seated. rre 3-7. Printed circuit card installation Guide c...
Page 30
Installation, Section 300 Issue 2 Cabinet Installation August 16,1993 Batterv Backup Guidelines . The DBS 40 uses two 12-volt batteries; the DBS 72 and 96 use four &volt batteries. The following table includes the part numbers for the battery packages. Table 3.1. Battery backup packages for the DBS 40, 72, and 96 The backup batteries are connected in a series circuit, using cables provided with the DBS. With maximum traffic, the backup batteries last up to 40 minutes for the DBS 40 and 72, up...