NEC Neax 2400 Ipx System Operations And Maintenance Manual
Here you can view all the pages of manual NEC Neax 2400 Ipx System Operations And Maintenance Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 31
NDA-24307 CHAPTER 2 Page 3 Issue 1 CHAPTER 2 SYSTEM MAINTENANCE OUTLINE 1. GENERAL 1.1 Purpose This chapter explains the outline of fault diagnosis and duties necessary to maintain the PBX. 1.2 Administrative Management Procedures Figure 2-1 shows the work flow of the administrative management procedures. Figure 2-1 Flow of Administrative Management Procedures Administrative Management Works Expansion and Change of Station Users Management Works Diagnosis result, system message displays abnormality...
Page 32
CHAPTER 2 NDA-24307 Pag e 4 Issue 1 SYSTEM MAINTENANCE OUTLINE 1.3 How to Follow This Manual Table 2-1 provides a brief description of the contents for each chapter in this manual. 2. BASIC KNOWLEDGE This section identifies the information necessary for the system operations and maintenance procedures. 2.1 System Configuration 2.2 Line Equipment Numbers (LENS) 2.3 Local Partition (LP) Number 2.4 Assignment of Network Control Node (NCN) 2.5 System Messages 2.6 Fault Detecting Function 2.7 Range of Faults...
Page 33
NDA-24307 CHAPTER 2 Page 5 Issue 1 SYSTEM MAINTENANCE OUTLINE 2.1 System Configuration Figure 2-2 shows the system configuration of the fully expanded NEAX2400 IPX IPX-U. Figure 2-2 NEAX2400 IPX IPX-U ...... ...... LN0 ISWLN1 LN3 LN2 FRONT VIEW ISW: Inter-node Switch LN: Local Node
Page 34
CHAPTER 2 NDA-24307 Pag e 6 Issue 1 SYSTEM MAINTENANCE OUTLINE 2.1.1 Configuration of the System The NEAX2400 IPX IPX-U system (referred to in the remainder of this manual as “the system”) is configured by a single Inter-node Switch (ISW) and a maximum of 4 Local Nodes (LNs). Refer to figures in this section. The ISW and LNs are connected via the Fusion link, with Ethernet and physical PCM cables connected to each other. Figure 2-3 provides an overall image of system configuration. A two-module ISW and...
Page 35
NDA-24307 CHAPTER 2 Page 7 Issue 1 SYSTEM MAINTENANCE OUTLINE Figure 2-4 Details on Inter-node PCM Cable Connections Note: For actual cable runnings, refer to the Installation Manual. IS W BASEULPM IS W MTO PU < IS W M B ackplane > For TSWM1 For TSWM0 (17) (16) (15) (14) (07) (06) (05) (04) LN0 IM G 0 IM G 1 IM G 2 IM G 3 BASEU BASEU BASEU BASEULPM TSWM0 TSWM1 DUMMY PIM1 PIM1 PIM1 PIM1 PIM0 PIM0 PIM0 PIM0 FANU FANU FANU FANUPIM2 PIM2 PIM2 PIM2 PIM3 PIM3 PIM3 PIM3 TOPU TOPU TOPU...
Page 36
CHAPTER 2 NDA-24307 Pag e 8 Issue 1 SYSTEM MAINTENANCE OUTLINE Figure 2-5 Details on Ethernet Cable Connections (Establishment of Fusion Link) (1/2) ISW CPU1 HUB1 HUB0 PIM0 of LN0, IMG010 BASE-T Cables (Straight) 10 BASE-T Cables (Straight) 10 BASE-T Cables (Cross) CPU1 LPM PIM0CPU0 00 00 LANI HUB0 HUB1NoteNote IMG0 (LN0) From ISW From LN1 From LN2 From LN3 From ISW From LN1 From LN2 From LN3 LPM CPU1 CPU000 00 LANI ISW / IMG0 (LN1/2/3) Max. 328 ft (100m)Note 2 : 10 BASE-T connector...
Page 37
NDA-24307 CHAPTER 2 Page 9 Issue 1 SYSTEM MAINTENANCE OUTLINE Figure 2-5 Details on Ethernet Cable Connections (Establishment of Fusion Link) (2/2) [ Details on Ether Cable Connections: When Dual LANIs are used for each CPU ] When dual LANIs are used for each CPU, the whole second LANIs (external LANI: PCI slot 03) must also be connected in addition to the first LANIs explained on the previous page. This figure shows an example where the second LANIs are connected to the additional HUB2/HUB3 (PA-M96)...
Page 38
CHAPTER 2 NDA-24307 Pag e 1 0 Issue 1 SYSTEM MAINTENANCE OUTLINE Figure 2-6 Details on Ethernet Cable Connections (Using MAT via Ethernet) Note: The LANI card for MAT connection is mounted in PCI slot No. 01 of each CPR. [ Details on Ether Cable Connections: When using MAT via Ethernet ] CPU1 LPM PIM0CPU0 01 0100 00 HUB LANI IMG0 (LN1) ISW Fusion Link Ether for MATLN0 LN1 LN2 LN3 LN1IMG0 IMG1 IMG2 IMG3 MAT MAT 10 BASE-T Cable (Straight)10 BASE-T Cable (Straight) 10 BASE-T Cable...
Page 39
NDA-24307 CHAPTER 2 Page 11 Issue 1 SYSTEM MAINTENANCE OUTLINE Figure 2-7 Face Layout of ISW 03 04IOC (PH-IO24)EMA (PH-PC40) 13 14 01 02MMC (PH-M22) 00 01 02 03 04 05 06 07 08 1011 16 17 18 1915PWR0 (PH-PW14)HSW00 (PU-SW01)TSW00 (PU-SW00) IOGT0 (PH-GT10) PWR1 (PH-PW14) HSW01 (PU-SW01) TSW01 (PU-SW00) TSW02 (PU-SW00) TSW03 (PU-SW00) PLO0PLO1 00 IOGT1 (PH-GT10) TSW10 (PU-SW00) TSW11 (PU-SW00) TSW12 (PU-SW00) TSW13 (PU-SW00) HSW10 (PU-SW01)HSW11 (PU-SW01) (PH-CK16-A/17-A) (PH-CK16-A/17-A) (RES) (RES)...
Page 40
CHAPTER 2 NDA-24307 Pag e 1 2 Issue 1 SYSTEM MAINTENANCE OUTLINE Figure 2-8 Face Layout of IMG0 (Local Node) Note: The 2nd IOC card (optional) may be mounted in this slot. 000102030405060708091011121314151617181920212223 000102030405060708091011121314151617181920212223 00 00 01 01 02 02 03 03 04 04 05060708091011121314151617181920212223 000102030405060708091011121314151617181920212223 LPM PIM 0 PIM 1 FA N UPIM 2 PIM 3 TO P U BASEU PH-PC40 (EMA) PH-IO24 (IOC) PWR1 PWR0 PWR1 PWR0 PWR1 PWR0 PWR0 PWR1...