NEC Neax 2000 Ivs Remote Pim System Manual
Have a look at the manual NEC Neax 2000 Ivs Remote Pim System Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
ND-46550 (E) CHAPTER 3 Pag e 63 Revision 2.0 Figure 3-38 Example of DTI Cable Connection via LTC Connector 43BA14318 AA11842 BA04217 AA017 17 RA 42 RB 18 TA 43 TB 19 44 20 45 MDF PIM0 P DAIA AP0LTC1 J SEND RECEIVE TB TA RB RA TO CSU/ REMOTE PIM 34 33 32 T0-31 Á [LT10] À À LTC1 CONNECTOR 42 RB 17 RA 43 TB 18 TA 44 19 45 20 LTC (J)(P) ÁMDF CONNECTOR 31 32 33 34 35 36 37 38 39 RA RB TA TB T0
CHAPTER 3 ND-46550 (E) Pag e 6 4 Revision 2.0 (2) When using CN connector on DAIA Card Connect the cable to a CSU or directly to the Remote PIM via the CN connector on the DAIA/DAIC card as shown in Figure 3-39. Connection of DAIC cards between the Main PIM and the Remote PIM is available in the same manner as the DAIA-DIAB connection. Figure 3-39 DTI Cable Connection via CN Connector (Main Site) CSU MDF TWISTED-PAIR CABLE DAIA BWBMAIN PIM (SHIELD TYPE) CN DAIA/DAIC MDF CN TB TA RB RA TO CSU/REMOTE PIM SEND RECEIVE 4 3 2 1 BA1 AA1 BA0 AA0 TB TA RB RA CN CONNECTOR(0.65F cable) Note 1:When the Remote PIM is directly connected without CSU, maximum distance is 1312 ft. (400 m) between the Main PIM and the Remote PIM. Note 2:When the DAIA card is mounted in the MP/FP slot, be sure to connect the cable to the CN con- nector on the DAIA card. Note 1MAX.656 ft. (200 m) /DA IC
ND-46550 (E) CHAPTER 3 Pag e 65 Revision 2.0 2.3.2 DTI Connection at Remote Site Connect the cable to a CSU or directly to the Main PIM via the CN connector on the DAIB/DAIC card as shown in Figure 3-40. Connection of DAIC cards between the Main PIM and the Remote PIM is available in the same manner as the DAIA-DAIB connection. Figure 3-40 DTI Cable Connection via CN Connector (Remote Site) REMOTE PIM CSU MDF TWISTED-PAIR CABLE DAIB/ BWB (SHIELD TYPE) MAX. 656 ft. (200 m) CN DAIB/DAIC MDF CN TB TA RB RA TO CSU/MAIN PIM SEND RECEIVE 4 3 2 1 BA1 AA1 BA0 AA0 TB TA RB RA CN CONNECTOR(0.65F cable) Note:When the Remote PIM is directly connected without CSU, maximum distance is 1312 ft. (400 m) between the Main PIM and the Remote PIM. Note DAIC
CHAPTER 3 ND-46550 (E) Pag e 6 6 Revision 2.0 2.4 MP Reset After mounting all DAIC cards and connecting between the main site and the remote site, press the SW1 switch on the MP card.
ND-46550 (E) CHAPTER 4 Pag e 67 Revision 2.0 CHAPTER 4 TROUBLESHOOTING This chapter describes the method for fault diagnosis and troubleshooting when maintenance personnel detected the fault occurrence by lamp indication on DAIA, DAIB, and DAIC cards. For other system faults, refer to the Maintenance Manual. Table 4-1 shows contents of the fault and the remedial action on each lamp status. Table 4-1 Remedial Action on Each Lamp Status CARD NAME LAMP STATUS FAULT CONTENT REMEDIAL ACTION PN-DAIA (DAIA) RUN lamp is not flashing Abnormal operation of DAIA cardÀReset MB switch. (Down®Up®Down) ÁCheck setting of SW1. 1: FP No.1 2: FP No.2 3: FP No.3 0, 4-F: Not used ÂIf fault cannot be cleared, replace card. LINK lamp is not on Layer 2 link connection failure between DAIA and DAIBÀCheck whether cable between DAIA and DAIB is correctly connected. (Refer to Chapter 3, Section 2.3.) ÁReset MB switch. (Down®Up®Down) RED lamp is on PCM signal loss or Frame Alignment signal lossÀCheck whether cable between DAIA and DAIB is correctly connected. (Refer to Chapter 3, Section 2.3.) RMT lamp is on Remote alarmÀCheck whether cable between DAIA and DAIB (sending side) is correctly connected. (Refer to Chapter 3, Section 2.3.)
CHAPTER 4 ND-46550 (E) Pag e 6 8 Revision 2.0 PN-DAIB (DAIB) RUN lamp is not flashing Abnormal operation of DAIB cardÀReset MB switch. (Down®Up®Down) ÁIf fault cannot be cleared, replace card. LINK lamp is not on Layer 2 link connection failure between DAIA and DAIBÀCheck whether cable between DAIA and DAIB is correctly connected. (Refer to Chapter 3, Section 2.3.) ÁReset MB switch (Down®Up®Down) RED lamp is on PCM signal loss or Frame Alignment signal lossÀCheck whether cable between DAIA and DAIB is correctly connected. (Refer to Chapter 3, Section 2.3.) ÁReset MB switch of DAIA card on main site. (Down®Up®Down) RMT lamp is on Remote alarmÀCheck whether cable between DAIA and DAIB (sending side) is correctly connected. (Refer to Chapter 3, Section 2.3.) Table 4-1 Remedial Action on Each Lamp Status (Continued) CARD NAME LAMP STATUS FAULT CONTENT REMEDIAL ACTION
ND-46550 (E) CHAPTER 4 Pag e 69 Revision 2.0 PN-DAIC (DAIC) RUN lamp is not flashing Abnormal operation of DAIC cardÀReset MB switch. (Down®Up®Down) ÁIf the fault can not be cleared, replace card. LINK lamp is not on Layer 2 link connection failure between DAIA and DAIBÀCheck whether cable between DAIA and DAIB is correctly connected. (Refer to CHAPTER 3, Section 2.3.) ÁReset MB switch (Down®Up®Down) ®Check whether cable between DAIC cards is correctly connected. (Refer to CHAPTER 3, Section 2.3.) RED lamp is on PCM signal loss or Frame Alignment signal lossÀCheck whether cable between DAIC cards is correctly connected. (Refer to CHAPTER 3, Section 2.3.) RMT lamp is on Remote alarmÀ Check whether cable between DAIC cards (sending side) is correctly connected. (Refer to CHAPTER 3, Section 2.3.) Table 4-1 Remedial Action on Each Lamp Status (Continued) CARD NAME LAMP STATUS FAULT CONTENT REMEDIAL ACTION
CHAPTER 4 ND-46550 (E) Pag e 70 Revision 2.0 This page is for your notes.