NEC Neax 2000 Ivs Remote Pim System Manual
Here you can view all the pages of manual NEC Neax 2000 Ivs Remote Pim System Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 71
ND-46550 (E) CHAPTER 3 Pag e 63 Revision 2.0 Figure 3-38 Example of DTI Cable Connection via LTC Connector 43BA14318 AA11842 BA04217 AA017 17 RA 42 RB 18 TA 43 TB 19 44 20 45 MDF PIM0 P DAIA AP0LTC1 J SEND RECEIVE TB TA RB RA TO CSU/ REMOTE PIM 34 33 32 T0-31 Á [LT10] À À LTC1 CONNECTOR 42 RB 17 RA 43 TB 18 TA 44 19 45 20 LTC (J)(P) ÁMDF CONNECTOR 31 32 33 34 35 36 37 38 39 RA RB TA TB T0
Page 72
CHAPTER 3 ND-46550 (E) Pag e 6 4 Revision 2.0 (2) When using CN connector on DAIA Card Connect the cable to a CSU or directly to the Remote PIM via the CN connector on the DAIA/DAIC card as shown in Figure 3-39. Connection of DAIC cards between the Main PIM and the Remote PIM is available in the same manner as the DAIA-DIAB connection. Figure 3-39 DTI Cable Connection via CN Connector (Main Site) CSU MDF TWISTED-PAIR CABLE DAIA BWBMAIN PIM (SHIELD TYPE) CN DAIA/DAIC MDF CN TB TA RB RA TO CSU/REMOTE...
Page 73
ND-46550 (E) CHAPTER 3 Pag e 65 Revision 2.0 2.3.2 DTI Connection at Remote Site Connect the cable to a CSU or directly to the Main PIM via the CN connector on the DAIB/DAIC card as shown in Figure 3-40. Connection of DAIC cards between the Main PIM and the Remote PIM is available in the same manner as the DAIA-DAIB connection. Figure 3-40 DTI Cable Connection via CN Connector (Remote Site) REMOTE PIM CSU MDF TWISTED-PAIR CABLE DAIB/ BWB (SHIELD TYPE) MAX. 656 ft. (200 m) CN DAIB/DAIC MDF CN TB TA...
Page 74
CHAPTER 3 ND-46550 (E) Pag e 6 6 Revision 2.0 2.4 MP Reset After mounting all DAIC cards and connecting between the main site and the remote site, press the SW1 switch on the MP card.
Page 75
ND-46550 (E) CHAPTER 4 Pag e 67 Revision 2.0 CHAPTER 4 TROUBLESHOOTING This chapter describes the method for fault diagnosis and troubleshooting when maintenance personnel detected the fault occurrence by lamp indication on DAIA, DAIB, and DAIC cards. For other system faults, refer to the Maintenance Manual. Table 4-1 shows contents of the fault and the remedial action on each lamp status. Table 4-1 Remedial Action on Each Lamp Status CARD NAME LAMP STATUS FAULT CONTENT REMEDIAL ACTION PN-DAIA (DAIA)...
Page 76
CHAPTER 4 ND-46550 (E) Pag e 6 8 Revision 2.0 PN-DAIB (DAIB) RUN lamp is not flashing Abnormal operation of DAIB cardÀReset MB switch. (Down®Up®Down) ÁIf fault cannot be cleared, replace card. LINK lamp is not on Layer 2 link connection failure between DAIA and DAIBÀCheck whether cable between DAIA and DAIB is correctly connected. (Refer to Chapter 3, Section 2.3.) ÁReset MB switch (Down®Up®Down) RED lamp is on PCM signal loss or Frame Alignment signal lossÀCheck whether cable between DAIA and...
Page 77
ND-46550 (E) CHAPTER 4 Pag e 69 Revision 2.0 PN-DAIC (DAIC) RUN lamp is not flashing Abnormal operation of DAIC cardÀReset MB switch. (Down®Up®Down) ÁIf the fault can not be cleared, replace card. LINK lamp is not on Layer 2 link connection failure between DAIA and DAIBÀCheck whether cable between DAIA and DAIB is correctly connected. (Refer to CHAPTER 3, Section 2.3.) ÁReset MB switch (Down®Up®Down) ®Check whether cable between DAIC cards is correctly connected. (Refer to CHAPTER 3, Section...