Home > Namco > Games > Namco Rapid River Operators Manual

Namco Rapid River Operators Manual

Here you can view all the pages of manual Namco Rapid River Operators Manual . The Namco manuals for Games are available online for free. You can easily download all the documents as PDF.

Page 51

Page 52 6-3-3-2 Ride Test
1. Select “Ride Test” on the I/O menu screen and press enter to test the
ride air springs. The following screen is displayed.
2. Press the start switch to begin the test.
3. The air springs are operated to move the seat in the following
sequence:-
Front up -
> Rear up -
> Left up -
> Right up -
>
After checking the seat movement, ‘CHECK END’ appears on the
screen. If all movement is correct ‘OK’ appears on the screen.
Otherwise ‘NG’ appears on the screen.
4. To cancel the test...

Page 52

Page 53 6-3-4 Monitor Test
1. Select “MONITOR TEST” on the menu screen to test and adjust the
Monitor. The following screen is displayed.
2. Use the Select Up/Down switch to choose the required item, (the selected
item will flash), then press the Enter button. To return to the Monitor Test
Menu from a test pattern press the Enter button.
3. Select “EXIT” and press the Enter button to return to the menu screen.
Note:
Items (b) and (h) are not used on this game.
GRADATION...

Page 53

Page 54 6-3-5 Sound Test
1. Select “Sound Test” on the menu screen to set the sound volume levels.
The following screen is displayed.
2. Use the Select Up/Down switch to choose the required item, (the selected
item will flash), then press the Enter button.
3. Use the Select Up/Down switch to change the setting, then press Enter to
store the change.
4. Select “EXIT” and press the Enter button to return to the menu screen.
(a) Volume setting during game play. Settable from 0 ~ 64 with 0
quietest and 64...

Page 54

Page 55
6-3-6 ADS Data
By selecting ADS Data from the menu screen, all of the bookkeeping 
details can be read and/or reset.
6-3-7 Others 1. Select “OTHERS” on the menu screen. The following screen is displa\
yed. 
2. Use the Select Up/Down switch to choose the required item, (the selecte\
d item will flash), then press the Enter button.
3. Select “EXIT” and press the Enter button to return to the menu scr\
een. 
(a,) Displays game software version. 
(b), (c), (d) Used to test the PCB.
(e) Used to...

Page 55

Page 56
7. INITIALATION
Adjustments after Replacing Parts. 
1. Display the ‘OTHERS’ test screen.To display the test screen, perform either of the following operations :-
•Select ‘VOLUME ADJUST’ on the ‘OTHERS’ menu  (see 6-3-7 page 54)
•Press and hold the service switch and slide the test switch ON.
2. Rotate the paddle two or three times around it’s full movable area to set the control potentiometer levels.
3. Press the enter button to store the new values.
4. Slide the test switch off to exit and...

Page 56

Page 57
8. MAINTENANCE.
G GG G
GAdjustment or maintenance on this machine should be carried out by
qualified personnel only.
Do not make any alterations on this machine without prior approval.
Doing so could cause unforeseeable danger.
If performing work not described in this manual, be sure to contact
your distributor for instructions, as no responsibility will be
accepted for damage or injury
D DD D
DEinstellungen und Wartung des Gerätes dürfen nur von dafür
qualifiziertem Fachpersonal vorgenommen...

Page 57

Page 58
I II I
IRegolazioni e manutenzione su questa macchina devono essere fatti
solo da personale specializzato.
Non apporre alcuna modifica alla macchina senza autorizzazione
preventiva. Il fare questo può causare un pericolo non prevedibile.
Se state per iniziare un lavoro non descritto in questo manuale,
contattate il vostro distributore per instruzioni poichè non si accetta
alcuna responsabilità per danni o ferite.
N NN N
NJustering eller vedlikehold på denne maskinen skall bare utføres av...

Page 58

Page 59
8-1 Checking the Condensate Bottle
The condensate bottle collects any water generated within the compressor\
, 
and should be checked WEEKLY, and emptied (if neccessary). 
1. Ensure that the machine is switched off.
2. Remove the back door on the monitor cabinet to gain access to the condensate bottle.
3. Remove the Pozi head screw (M6x25) and remove the bottle complete with bracket.
4. Unscrew the bottle from the cap and discard the water.
Note :Ensure that any water in the condensate bottle is...

Page 59

Page 60
8-3 Removing the Seat Assy1. Remove 8off Hex head screw (M10x30), and remove the seat assy.
8-4 Replacing the Base Control Potentiometers
The Base assy is fitted with four (4) potentiometers. All controls are\
 removed and replaced in the following manner .
1. Remove the seat ass y.  (see section 8-3  above)
2. Disconnect the connector. 

Page 60

Page 61
3. Loosen the grub screw (M4x6), and remove the control potentiometer
complete with bracket.
4. Remove the control from the bracket, and replace the potentiometer.
When refitting the potentiometer ensure that locating tag on the potentiometer is fitted into the hole in the bracket, the bracket is fit\
ted inthe correct position, and that the grub screw engages on the flat of the\
potentiometer shaft.
Note :After re-assembly and refitting in to the ride, ensure that the game
is re-initialized...
Start reading Namco Rapid River Operators Manual

Related Manuals for Namco Rapid River Operators Manual

All Namco manuals