Home > Namco > Games > Namco Panic Park Operators Manual

Namco Panic Park Operators Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Namco Panic Park Operators Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 93 Namco manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							Page 51 4. Move both levers to the centre and press either the left or right start
    button.
    If initialization is successfull COMPLETED will be displayed.
    5. Slide the TEST switch OFF to return to normal game mode.I/F INITIALIZE
    DIP
    12345678[ON:OFF]
    MOVE BOTH JOYSTICKS LEFT,
    THEN PRESS BUTTON.
    [L] 0000 [R] 0000
    MOVE BOTH JOYSTICKS RIGHT,
    THEN PRESS BUTTON
    [L] 0000 [R] 0000
    MOVE BOTH JOYSTICKS CENTER,
    THEN PRESS BUTTON
    [L] 0000 [R] 0000
    COMPLETED
    EXIT
    SELECT SW : CHOOSE
    ENTER SW : ENTER 
    						
    							Page 52
    8. MAINTENANCE
    G GG G
    GAdjustment or maintenance on this machine should be carried out by
    qualified personnel only.
    D DD D
    DEinstellungen und Wartung des Gerätes dürfen nur von dafür
    qualifiziertem Fachpersonal vorgenommen werden.
    l ll l
    lJusteringer eller vedligehold af denne maskine bør kun udføres af
    kvalificeret personale.
    E EE E
    ELos ajustes y el mantenimiento de esta máquina deben ser realizados
    sólo por personal cualificado.
    F FF F
    FL’installation, le service, le réglage, ou la maintenance doivent être
    effectués uniquement par les personnes qualifiées.
    K KK K
    KÌåôáôñïðÝò Þ åðéäéïñèþóåéò óôá ìç÷áíÞìáôá ðñÝðåé íá ãßíï\
    íôáé ìüíï áðü
    åîïõóéïäïôçìÝíá Üôïìá.
    I II I
    IRegolazioni e manutenzione su questa macchina devono essere fatti
    solo da personale specializzato.
    N NN N
    NJustering eller vedlikehold på denne maskinen skall bare utføres av
    kvalifiserte personell.
    O OO O
    OAanpassingen of onderhoud aan deze machine dient alleen
    uitgevoerd te worden door bekwaam personeel.
    P PP P
    PAfinações ou manutenção nesta maquina, deverão ser efectuadas
    sómente por pessoal qualificado.
    S SS S
    SJusteringar och underhåll på denna maskin skall endast utföras av
    kvalificerad personal.
    l ll l
    lTätä laitetta saa säätää tai huoltaa vain siihen ammattipätevyyden
    omaava henkilökunta. 
    						
    							Page 53
    8-1 Greasing the Swing Lever Springs
    The Swing Lever Springs should be greased every 6 months.
    1. Remove 9off security screws (M5x12) from the control panel cover.
    2. Disconnect the connectors and remove the control panel cover.
    3. Apply grease to the positions shown in the following diagram.
    4. Reassemble in reverse order. 
    						
    							Page 54
    8-2 Checking Swing Lever Absorber Rubbers
    Check for wear every 3 months. 
    1. Remove 9off security screws (M5x12) from the control panel cover.
    2. Disconnect the connectors and remove the control panel cover. 
    3. Check the absorber rubbers for wear or damage. 
    4. Replace the rubber if worn or damaged. (see section  8-6 page  58) 
    						
    							Page 55 8-3 Replacing the Fluorescent Tube or Starter
    1. Remove the 3off pozi head screw (M5x12) and remove  the top retaining
    bracket.
    2. Remove the Header Acrylic.
    3. Replace the fluorescent tube or starter.
    4. Reassemble in the reverse order. 
    						
    							Page 56
    8-4 Replacing the Start Button or Lamp
    1. Remove the control panel cover.  (see section 8-2 page 54)
    2. Replace the micro switch. (
    Note: When replacing the switch ensure that
    the wires are replaced to the correct terminals).
    3. Remove the lamp holder from the button assembly by pulling the lamp holder out.
    4. Replace the lamp. 
    5. To replace the button assy undo the retaining nut and withdraw the butto\
    n assembly from the control panel cover. 
    						
    							Page 57
    8-5 Replacing the Potentiometers
    1. Remove the control panel cover  (see section 8-2 page 54).
    2. Disconnect the potentiometer connector. 
    3. Place the swing lever of the potentiometer to be replaced to the centre \
    of the machine.
    4. Slacken the grub screw (M4x8) and remove the potentiometer complete with mounting bracket.
    5. Replace the potentiometer.
    6. Reassemble in reverse order.
    Note: When refitting the potentiometer ensure that the locating tab of the
    potentiometer engages in the hole in the mounting bracket and the grubscrew engages on the flat of the potentiometer shaft. 
    						
    							Page 58
    8-6 Replacing the Swing Lever Absorber Rubbers
    1. Remove the control panel cover.  (see section 8-2 page 54)
    2. Remove the 2off socket head screws (M5x16) and remove the transparent cover.
    3. Remove the 4off button head screws (M4x6) and remove the absorber rubber.
    4. Replace the absorber rubber. 
    5. Reassemble in reverse order 
    						
    							Page 59 8-7 Replacing the Side Covers
    1. Remove the 2off pozi head screws (M4x10) with spring washers.
    2. Replace the side covers.
    3. Reassemble in reverse order. 
    						
    							Page 60
    8-8 Replacing the Monitor
    The monitor weighs approx 40kg. Ensure that at least two people are used\
     to 
    remove the monitor, and there is sufficient space to work safely. 
    1. Remove the control panel cover.  (see section 8-2 page 54)
    2. Loosen the 2off lower security screws (M5x12), and remove the 4off upper security screws (M5x12), and remove the monitor maintenance 
    panel from the rear of the cabinet.
    3. Disconnect the monitor connectors. 
    4. Remove the 4off hex head screws (M6x40), flat and spring washers retaining the monitor to the monitor shelf.
    5. Remove the 4off security screw (M5x12) and remove the monitor vac- form. 
    						
    All Namco manuals Comments (0)

    Related Manuals for Namco Panic Park Operators Manual