Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 6 Instructions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 6 Instructions Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 6 Instructions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 241
DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r Volumes 1 & 2 555-230-126 Issue 2 January 1998 Additional Maintenance Procedures Page 6-35 Analog Tie Trunk Back-to-Back Testing 6 10. Locate the Tie Trunk port terminal connections at the cross-connect field. Consult the appropriate table below for either 110-type or 66-type hardware. 11. At the cross-connect field, disconnect outside trunk facilities from the Tie Trunk ports and mark the disconnected wires for reconnecting...
Page 242
DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r Volumes 1 & 2 555-230-126 Issue 2 January 1998 Additional Maintenance Procedures Page 6-36 Analog Tie Trunk Back-to-Back Testing 6 Table 6-6. Carrier Lead Appearances MDF 110 Connecting Block Terminals CO Trunk TN747 Tie Trunk TN760 1T1T1 2R1R1 3 T11 4R11 5E1 6M1 7T2T2 8R2R2 9 T12 10 R12 11 E2 12 M2 13 T3 T3 14 R3 R3 15 T13 16 R13 17 E3 18 M3 19 T4 T4 20 R4 R4 21 T14 22 R14 23 E4 24 M4 25 T5 26 R5 27 28 Continued on next page
Page 243
DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r Volumes 1 & 2 555-230-126 Issue 2 January 1998 Additional Maintenance Procedures Page 6-37 Analog Tie Trunk Back-to-Back Testing 6 Simplex Mode Test Procedure 1. Repeat Steps 1 through 7 of the E&M Mode Test Procedure. 2. Set the dip (option) switches for each of the two ports to be tested on the Tie Trunk circuit pack to simplex mode.29 30 31 T6 32 R6 32 33 34 36 37 T7 38 R7 39 40 41 42 43 T8 44 R8 45 46 47 48 49 50 Table 6-6....
Page 244
DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r Volumes 1 & 2 555-230-126 Issue 2 January 1998 Additional Maintenance Procedures Page 6-38 Terminating Trunk Transmission Testing 6 3. Enter add trunk n to add a new (test) trunk group. Then enter information for the following fields: 4. Locate the Tie Trunk port terminal connections at the cross-connect field. Consult the appropriate table above for either 110-type or 66-type hardware. 5. At the cross-connect field,...
Page 245
DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r Volumes 1 & 2 555-230-126 Issue 2 January 1998 Additional Maintenance Procedures Page 6-39 Removing and Restoring Power 6 The three test types should have extension numbers assigned on the Maintenance-Related System Parameters Form. Test Type 100:___ Test Type 102:___ Test Type 105:___ Test Type 100 provides: n5.5 seconds of 1004 Hz tone at 0dB nQuiet until disconnect; disconnect is forced after one minute Test Type 102...
Page 246
DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r Volumes 1 & 2 555-230-126 Issue 2 January 1998 Additional Maintenance Procedures Page 6-40 Automatic Transmission Measurement System (ATMS) 6 !CAUTION: If there is an alarm or problem suspected on the Tape or Disk Circuit packs do not save translations or announcements to the affected device. If there is an alarm or problem suspected with the Host Adapter circuit, do not save data to either MSS device. Saving data under these...
Page 247
DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r Volumes 1 & 2 555-230-126 Issue 2 January 1998 Additional Maintenance Procedures Page 6-41 Automatic Transmission Measurement System (ATMS) 6 Trunk Line (TTL) on the switch at the far end of the trunk. Several different measurements of noise and attenuation are made and compared to administered thresholds. Test measurements can be viewed in the form of detailed or summary reports which are described below. ATMS test calls can...
Page 248
DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r Volumes 1 & 2 555-230-126 Issue 2 January 1998 Additional Maintenance Procedures Page 6-42 Automatic Transmission Measurement System (ATMS) 6 Running ATMS Tests (Test Analog-Testcall Command) ATMS test calls can be originated either on demand or according to the ATMS Test Schedule. Test schedules are set up with test-schedule commands which are described in DEFINITY Enterprise Communications Server Release 5.4 Administration...
Page 249
DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r Volumes 1 & 2 555-230-126 Issue 2 January 1998 Additional Maintenance Procedures Page 6-43 Automatic Transmission Measurement System (ATMS) 6 Normally you should invoke only the full or supervision tests. The other options are provided mainly for use in setting up an ATMS schedule. Which tests are run depend on the type of TTL at the far end to which the test call is made. The following table shows which tests are run for each...
Page 250
DEFINITY Enterprise Communications Server Release 6 Maintenance for R6r Volumes 1 & 2 555-230-126 Issue 2 January 1998 Additional Maintenance Procedures Page 6-44 Automatic Transmission Measurement System (ATMS) 6 Test Call Results If the test call successfully completes, and all trunks test within administered thresholds for marginal and unacceptable performance, then a PASS result is returned. If the test aborts or fails, an error code indicating the cause is returned. The error codes are...