Home
>
Inter-Tel
>
Communications System
>
Inter-Tel Microprocessor Key Installation And Maintenance Practices Manual
Inter-Tel Microprocessor Key Installation And Maintenance Practices Manual
Here you can view all the pages of manual Inter-Tel Microprocessor Key Installation And Maintenance Practices Manual. The Inter-Tel manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 61
INSTALLATION SECTION 340-100-300 issue 3, April 1983 BATTERY ON/OFF-- STRAP REr&gE NO MOH - INTER-TEL PRACTICES 32164 K - %inopRy RS232C PORT PROGRAMMING SWITCHES STATUS Figure 3-9. CPU PCB Page 3-16
Page 62
INTER-TEL PRACTICES INSTALLATION SECTION 340-100-300 Issue 3, April 1983 Switch Function Initial Position 1 PROGRAM Open 2 RESET Open 3 INIT Open 4 TEST Open 5 RUN (Unused) Open Figure 3-10. CPU PCB Switch Positions Switch Position Option +1 Digit 1 Dial 2 Speed Transfer 3 Off-Hook Ring 4 4 Night Station 3 -5 Full-Duplex Speakerphone 2. -6 Executive Priority I -7 Do-Not-Disturb Figure 3-11. Keyset Switch-Selectable Options NOTE: “0N”is closed or active; “OFF” is open or inactive...
Page 63
INSTALLATION SECTION 340-100-300 ?ssue 3, April 1983 KEYSET VOLTAGE ADJUSTMENT INTER-TEL PRACTICES SPEAKER LEADS 51 B od - DIP SWITCH ( 7 SWITCH) DVM ACROSS VR2 Figure 3-13. Keyset Voltage Adjustment Page 3-18
Page 64
INTER-TEL PRACTICES INSTALLATION SECTION 340-100-300 Issue 3, April 1983 (LABEL:FRoM KSU) L J L STATION Figure 3-14. DSS/BLF Connections Page 3-19
Page 65
INTER-TEL PRACTICES INSTALLATION SECTION 340-100-300 Issue 3, April 1983 WITH OPTIONAL SYSTEM BATTERY r BACK-UP. ADD THESE JUMPERS /- ADJUST VOLTAGE HERE ,-MEASURE HERE - 1 Figure 3-15. 3030D DSS/BLF (With Fast Reset) Voltage Adjustment and Optional Battery Back-Up Page 3-20
Page 66
INTER-TEL PRACTICES INSTALLATION SECTION 340-100-300 issue 3, April 1983 ADJUST VOLTAGE HERE MEASURE HERE c23 I- . RN4 1 IVIT . P”5 . . 9llx3 Ul0 nNG J” U2 ’ . n . RN3 I p”“4 VI3 . RN!0 BATTERY BACK -UP, ADD THESE JUMPERS WITH OPTIONAL SYSTEM Figure 3-16. 3532D DSS/BLF (With Fast Reset) Adjustment and Optional Battery Back-Up Page 3-21
Page 67
INSTALLATION SECTION 340-100-300 h-we 3, April 1983 INTER-TEL PRACTICES MPK TO TO KSU TERMINAL ~ RS-232 PORT (TYPICAL ) GND RCV DATA XMIT DATA CLEAR TO SEND DATA SET READY GWD CARRIER DETECT DATA TERMINAL READY > > > > > > > 20. >~> CONNECTOR TYPE AMPHENOL P/N 17-20250-I OR EQUIVALENT Figure 3-17. W-232 Cable Connection I 3 2 5 6 7 8 ~- 20 ” Page 3-22
Page 68
INTER-TEL PRACTICES INSTALLATION SECTION 340-100-300 Issue 3, April 1983 / (+ 36 VDC ) Figure 3-18. External Page Connection Page 3-23
Page 69
SECTION 340-100-300 Issue 3, April 1983 PCB CPU CNF cou STN Calculation of Battery Current QTY CurrenVPCB Total PCB Cprrent 1 0.57 0.57 1 0.13 0.13 2 0.10 0.20 4 0.64 2.56 Total Current to be drawn from battery = 3.46 amps Required Battery Back-Up Capacity System Current (amps) (amp/hours) Back-Up Time (Hrs) 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 1 2 1 3.5 1 4 1 5.5 1 6 1 8.5 1 9.5 1 10 ] 10.5 1 11 10.5 1 17 1 19 1 20 1 16 1 25 1 28 ) 30 1 21 24 27 30 32 36 37 42 34 37...
Page 70
INTER-TEL PRACTICES PROGRAMMING SECTION 340-100-400 issue 3, April 1983 . PROGRAMMING CONTENTS PAGE 1 .oo 2.00 3.00 4.00 1.00 1.01 INTRODUCTION ..................... .4-l General ............................. ..4- 1 Programming Terminal ................ .4-l ON-SITE PROGRAMMING ............ .4-l KSU Setup .......................... ..4- 1 Major Programming Areas ............. .4-l initial MPK Programming .............. .4-2 System Programming ................. .4-2 Station...