GTE Omni Scbs Installation And Maintenance Manual
Here you can view all the pages of manual GTE Omni Scbs Installation And Maintenance Manual. The GTE manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 573
Data Switching Internal and External Interfaces I PABX co WATS FX DID/DISA CENTREX I DATA INTERF WITH DATADATATERMINAL ADAPTER TERl!.fllNALMODEM 5.38
Page 574
Package C Data Communications Configuration ASSOCIATED WITH DIU DATADATADATADATADATADATA TERMINALTERMINALTERMINALTERMINALTERMINALTERMINAL .SUPPORTS SIX CSD TELEPHONES WITH DATA TERMINAL ADAPTERS AND TWO DATA INTERFACE UNITS (OR TWO VOICE ONLY CSD TELEPHONES). 5.39
Page 576
Review Exercise- Package C Overview (5.1) INSTRUCTIONS:THE FOLLOWING EXERCISE CONSISTS OF MULTIPLE CHOICE, TRUE/FALSE, FILL IN THE BLANK, OR MATCHING TYPE QUESTIONS. ALL AVAILABLE RESOURCES (I.E., STUDENT WORKBOOK, NOTES, AND GTEP MANUAL) MAY BE USED AS REFERENCES. SUBMIT EXERCISE TO INSTRUCTOR FOR GRADING WHEN LAST QUESTION HAS BEEN COMPLETED. 1. 2. 3. 4. 5. 6.PACKAGE C EXPANDS THE SYSTEM TO INCLUDE THE FOLLOWING SYSTEM APPLICATIONS: A.HOTEL/MOTEL, KEY SYSTEM FEATURES, AUTOMATIC CALL DISTRIBUTION, AND...
Page 577
7.(TRUE OR FALSE)THE DATA INTERFACE UNIT (DIU) CAN SERVE AS A STANDALONE UNIT FOR INTERFACE WITH A MODEM OR PRINTER. 8.MATCH EACH OF THE FOLLOWING HOTEL/MOTEL FEATURES WITH ITS CORRECT DEFINITION: DO NOT DISTURB AUTOMATIC WAKE-UP WITH PRINTERROOM STATUS MESSAGE REGISTRATION VACANT ROOM RESTRBCTIONA. B. C. D. E.RESTRICTS INCOMING AND/OR OUTGOING CALLS WHILE ROOM IS IN VACANT STATUSALLOWS FRONT DESK CONSOLE EQUIPPED WITH BLF/DSS MODULE TO DISPLAY INDICATION FOR VACANT, OCCUPIED, NEEDS CLEAN-UP, DO NOT...
Page 579
GIVEN:e 0 0 GTE OMNI SBCS (PREVIOUSLY INSTALLED) GTE OMNI SBCS PACKAGE C EQUIPMENT AND PERIPtiERALS -CPMC, MEMC, 4CHT, SWB, SWE, AND PFE CARDS: - ATTENDANT CONSOLE - HOTEL/MOTEL PRINTER -DATA INTERFACE UNIT (DIU) GTE OMNB SBCS COURSE AND SITE DOCUMENTATIO STANDARD ilNSTALLATlON TOOLS REVIEW EXERCISE QUIREDFOREXPANDED SYSTE INSTALLATION COMPLETE REVIEW EXERCISE 9.44
Page 580
Package C Card InstallationYBASIC CABINET POWERSUPPLY YEXPANSION CABINET 1.GROUND YOURSELF PRIOR TO HANDLING CARDS. 2.SINCE SYSTEM POWER MUST BE TURNED OFF WHEN INSTALLING OR REPLACING CPMC OR MEMC CARDS, OFFICE DEPENDENT DATA BASE WILL BE DELETED AND CUSTOMIZED DATA BASE MUST BE REPROGRAMMED. 3.IF POWER FAIL TRANSFER IS REQUIRED IT WILL BE NECESSARY TO INSTALL A 6PFE CARD IN SLOT 22 OF THE EXPANSION CABINET USING THE CORRECT TOGGLE OPTION. CROSS CONNECT THE APPROPRIATE CONTROL LEADS BETWEEN THE BASIC...