GTE Omni Scbs Installation And Maintenance Manual
Here you can view all the pages of manual GTE Omni Scbs Installation And Maintenance Manual. The GTE manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 491
inal Instlation (Continued) GE al!avn SLBCS1 PROCEDURE 1 4.PLUG THE AC POWER SUPPLY ADAPTER INTO THE POWER OUTLET.AC ADAPTER AC ADAPTER 5.PLUG THE ROUND END OF THE AC POWER SUPPLY ADAPTER INTO THE CSD TELEPHONE. NOTE:REFER TO OPERATIONS MANUAL SUPPLIED WITH CUSTOMER- SUPPLIED DATA TERINAL FOR OPERATING INSTRUCTIONS. 4.40
Page 492
Message Waiting on SLT Instruments1 DESCRIPTION 1 eMESSAGES CAN BE LEFT AT SLT INSTRUMENTS (DIAL PULSE OR DTMF) EQUIPPED WITH MESSAGE WAITING LAMPS. lMESSAGE WAITING FEATURE FOR SLT INSTRUMENTS IS ACTIVATED THROUGH A STRAPPING OPTION ON THE RGEN CARD AND TWO DATA BASE COMMANDS.[PROCEDURE 1 1.CUT STRAPPING JUMPER ON RGEN CARD (SEE DIAGRAM) OR IF EQUIPPED, SLIDE MESSAGE WAITING SWITCH (LOCATED IN SAME PLACE) TO ON. 2.ACTIVATE MESSAGE WAITING ON SLT INSTRUMENTS FOR SYSTEM WITH CMC-102. (REFER TO PACKAGE...
Page 493
Optional External Paging Installation GUE OMNU SBCS. DIAGRAM REPRESENTS A TYPICAL EXAMPLE OF25 PAIR CDF BLOCK7TIPCROSS CONNECTIONS FOR A CUSTOMER- SUPPLIED EXTERNAL PAGING AMPLIFIER.. EXTERNAL PAGING REQUIRES ONE PAIR OF WIRES FOR ITS INTERFACE TO A 4BWC CARD (SAME AS CO TRUNK INSTALLATION). EACH 4BWC CARD HAS FOUR CIRCUITS AND ONLY EVERY OTHER PAIR OF PINS IS USED ON THE CONNECTING BLOCK.. OPERATION MAY REQUIRE 24 VOLT POWER SUPPLY (DEPENDENT ON CUSTOMER- SUPPLIED EQUIPMENT) 25 PAIR CABLE REFER TO CDF...
Page 494
Laboratory Installation1.POWER SYSTEM OFF. 2.ENSURE THAT PROPER ELECTROSTATIC GROUNDING PROCEDURES ARE FOLLOWED PRIOR TO HANDLING PCB CARDS. 3.BEGIN REPLACING AND INSTALLING THE DESIGNATED PRINTED CIRCUIT BOARDS IN CARD SLOTS IDENTIFIED BELOW (IF NOT PREVIOUSLY INSTALLED IN MODULE I). ENSURE THAT CARD COMPONENTS ARE ON LEFT SIDE OF THE BOARDS. (A)INSERT AND SEAT AN INTERFACE CARD FOR CSD/DTA INSTRUMENTS (8DTC) IN CARD SLOT 00. (B)REPLACE THE CPMA CARD IN SLOT 20 WITH THE ENHANCED CONTROL PROCESSOR MEMORY...
Page 495
/’Laboratory InstallationActivity - Package B (4.2) (Continued) 9.WIRE CROSS CONNECTION AND INSTALL EXTERNAL SPEAKER TO 4BWC CARD IN SLOT 18, CIRCUIT 3. 10.POWER SYSTEM ON AND RESET SYSTEM BY PRESSING RESTART BUTTON ON CPMB CARD WITH TOGGLE SWITCH IN CENTER POSITION.11. REPROGRAM THE ODDB. 4.44
Page 496
Review Exercise- Package B Installlation (4.2)INSTRUCTIONS:THE FOLLOWING EXERCISE CONSISTS OF MULTIPLE CHOICE, TRUE/FALSE, FILL IN THE BLANK, OR MATCHING TYPE QUESTIONS. ALL AVAILABLE RESOURCES (I.E. STUDENT WORKBOOK, NOTES AND GTEP MANUAL) MAY BE USED AS REFERENCES. SUBMIT EXERCISE TO INSTRUCTOR FOR GRADING WHEN LAST QUESTION HAS BEEN COMPLETED. 1. (TRUE OR FALSE) CPMB CAN BE INSTALLED AS A COMMON CONTROL CARD WITH SWC AND MEMA CARDS. 2. (TRUE OR FALSE) ‘REPLACING CPMB OR MEMB AUTOMATICALLY DELETES THE...
Page 497
_,-,Review Exercise -Package B Installation (4.2) (Continued) 9.What card slots may be used for 8DTC cards when CSD telephones are installed without Data Terminal Adapters? 10.Identify the correct descriptions for the RS-232-C pin configuration required for the RS-232-C port on a CSD equipped with a DTA: PINSIGNALDESCRIPTION 1FGPROTECTIVE GROUND 2TD 3RDRECEIVED DATA 4RTS 5CTS 6 DSRDATA SET READY 7SCSIGNAL GROUND 8RLSD 9_____________________________________ 14_______--_-_______________-__________...
Page 500
GIVEN:00 0 0 0 ACTION:0 0 0 CRITERIA:0 0 GTE OMNI SBCSGTE OMNI SBCS PACKAGE B EQUIPMENT AND PERIPHERALSPORTABLE MAINTENANCE PANEL OMNI SBCS COURSE AND SITE DOCUMENTATION PACKAGE REVIEW EXERCISEIDENTIFY FUNCTIONS AND APPLICATIONS OF PACKAGE B CMC COMMANDS. MODIFY PARAMETER VALUES FOR PACKAGE B CMCCOMMANDS. COMPLETE REVIEW EXERCISE.DEMONSTRATION OF ABOVE TASKS IN ACCORDANCE WITH PROCEDURES OUTLINED IN OMNI SBCS GTEP MANUAL AND OMNI SBCS STUDENT WORKBOOK. REVIEW EXERCISE WILL BE COMPLETED CORRECTLYIN...