GE I210c Manual
Here you can view all the pages of manual GE I210c Manual. The GE manuals for Electronics are available online for free. You can easily download all the documents as PDF.
Page 51
GE Energy GE I-210+cElectronic Meter Product Description and Operation, Maintenance,and Upgrade Instructions GEH-7101-2.00-151 Table 6 Batter Failure & Power Outage Error Code Display Date & TimeLost Load Profile recording: Stopped Register Function: Remains TOU, but operates as a demand meterwith a default TOU rate Program: OK TOU schedule: Stopped TOU calendar: Stopped Billing Data: Total summations and max. Demands are OK (rolling billing period demand if enabled will cease, and traditional demand...
Page 52
GE I-210+cElectronic Meter Product Description and Operation, Maintenance,and Upgrade Instructions GE Energy 52GEH-7101-2.00-1 Table 8 Er 000200—Non-volatile Data Error Date & Time: OK Load Profile recording: May be corrupt Register Functions: Unchanged Program: May be corrupt TOU schedule: May be corrupt TOU calendar: May be corrupt Billing Data: May be corrupt 4.13.1.4 Er 001000—Firmware Code Error The Firmware Code error indicates a failure in the memory used to store firmware. When the meter is not...
Page 53
GE Energy GE I-210+cElectronic Meter Product Description and Operation, Maintenance,and Upgrade Instructions GEH-7101-2.00-153 4.13.2 Caution Reporting The meter also checks other conditions that are of concern but do not indicate a problem with the meter hardware. The meter reports these as cautions. Individual cautions may be enabled or disabled selectively. If a caution is enabled, it can be configured to be displayed and optionally freeze the display. Table 11 Caution Code Display Caution...
Page 54
GE I-210+cElectronic Meter Product Description and Operation, Maintenance,and Upgrade Instructions GE Energy 54GEH-7101-2.00-1 4.13.2.1 CA 000001—Low Battery The Low Battery caution indicates a weak or missing battery. The meter periodically tests the battery. The meter sets the Low Battery caution if the battery voltage is low. The Low Battery caution is cleared when the battery test passes. The meter tests the battery under the following conditions: Power up 1st of each month (00:16) Activation...
Page 55
GE Energy GE I-210+cElectronic Meter Product Description and Operation, Maintenance,and Upgrade Instructions GEH-7101-2.00-155 4.13.2.6 CA 000400—Low Potential The Low Potential caution indicates that measured voltage falls below the programmed tolerance. The voltage is tested every five seconds using the voltage from the previous second. The meter sets the Low Potential caution when the test fails three consecutive times. The meter automatically clears the Low Potential caution when all active phases...
Page 56
GE I-210+cElectronic Meter Product Description and Operation, Maintenance,and Upgrade Instructions GE Energy 56GEH-7101-2.00-1 Table 12 Fault Symptoms Without Codes Caution DisplayProbable CauseRemedy High/low demand registration a. Socket wiring error b. Meter internal wiring defective c. Defective sensor a. Rewire according to applicable diagram. b. Check that voltage and currentconnectors are seated properly. Check the leads for damage. c. Replace meter. Meter overheats a. Meter socket has...
Page 57
GE Energy GE I-210+cElectronic Meter Product Description and Operation, Maintenance,and Upgrade Instructions GEH-7101-2.00-157 5 Upgrading 5.1 General Warning:The GE I-210+c™meter contains lethal voltages. The meter must be completely disconnected from any external circuits before disassembly is attempted. Failure to observe this practice can result in serious injury or death. For instructions on how to install and enable software, refer to theMeterMate™MMCOMM Instruction Book(GEH-5084S or most current...
Page 58
GE I-210+cElectronic Meter Product Description and Operation, Maintenance,and Upgrade Instructions GE Energy 58GEH-7101-2.00-1 5.2.2 Event Log—E2 Softswitch The Event Log softswitch allows the meter to track the most recent 200 events. Use MeterMate™Program Manager, Diagnostics Editor, to select the event types to be logged and how many occurrences should be tracked, up to a maximum of 200 events. Date and time stamps are included on logged events for Demand/LP or TOU meters. Logged events include the...
Page 59
GE Energy GE I-210+cElectronic Meter Product Description and Operation, Maintenance,and Upgrade Instructions GEH-7101-2.00-159 5.2.5 Power Quality Measurements—Q2 Softswitch The Power Quality Measurements softswitch enables the following: Voltage (L-N): VA (max, min, store) for summations, demand, and load profile recording RMS voltage measurement for reading and display Low potential caution 5.2.6 Basic Recording—R2 Softswitch The Basic Recording Softswitch enables up to four channels of load...
Page 60
GE I-210+cElectronic Meter Product Description and Operation, Maintenance,and Upgrade Instructions GE Energy 60GEH-7101-2.00-1 Interval LengthNumber of Channels 1234 Expanded Memory 1 25.9313.079.807.13days 2 51.8726.1319.6014.27days 3 77.8039.2029.4021.40days 4 103.7352.2739.2028.53days 5 129.6765.3349.0035.67days 6 155.6078.4058.8042.80days 10 259.33130.6798.0071.33days 12 311.20156.80117.6085.60days 15 389.00196.00147.00107.00days 20 518.67261.33196.00142.67days 30 778.00392.00294.00214.00days 60...
All GE manuals