Home > Panasonic > Notebook > Panasonic Cf30 Service Manual

Panasonic Cf30 Service Manual

Here you can view all the pages of manual Panasonic Cf30 Service Manual. The Panasonic manuals for Notebook are available online for free. You can easily download all the documents as PDF.

Page 41

9-19
24. Fix the Screw. 
25. Attach the TOP Screws.
Note: Tighten the Screws in the numbered order (No1 to No8).
Tighten the Screws in the numbered order (No1 to No6).
Screws : DRQT26+D4FKL
Screws : DRSB26+10HKL
Screws : DFHE5025XA
Screws : DRQT26+E5FKL
Screws : DRQT26+E6FKL
Screws : DRSB26+8FKL
Screws : DXQT2+E12FNL
 TOP Screw Sheet 
Connector
  (CN17) Connector
  (CN27) 

Page 42

9-20
Q
 Assembly of LAN, Modem and MDC
Q  Assembly of Main PCB
Safety Working 
MDC
5    1
15    1
Tighten of 
Screw  
Tighten of 
Screw  
Tighten of 
Screw   Tighten of 
Screw  
LAN Cable 
is installed.
Modem Cable 
is installed. Modem LAN Case
is installed.
Cable
Coil
Attach the DMD Cable Sheet
Order of fixing
Screw Screw
* Notes:
1. Apply the load when attaching the parts.   20N to 30N (2 to 3Kgf)/c\
m2
Pass the Cable to the back 
from the hole of the A side. (Remove  2 places)Match to the edge of the...

Page 43

9-21
9.2.11. Setting the PAD PCB
1. Fix the PAD PCB using the 2 Screws. 
2. Attach the TP PCB Screw Sheet.
3. Connect the Cable to the Connector. (CN802)
4. Connect the Cable to the Connector (CN801) and attach
the Tape.
Screws : DRQT26+D3FKL
Q  Assembly of PAD PCB


Pad PCB
Connector
 (CN802)
Connector
 (CN801)
Tape
TP PCB Screw Sheet
Safety Working 
Safety Working 
Safety Working 
Safety Working 
Safety Working 
Safety Working 
Attach the 
Cable Sheet0    2
LED PCB
Attach the Touch Pad INS Sheet
0...

Page 44

9-22
9.2.12. Setting the FPC HDD  BAT
1. Fix the FPC HDD BAT using the Screw. 
2. Connect the 2 Cables to the 2 Connectors. (CN7,CN8)
3. Connect the Cable to the Connector. (CN800)
4. Attach the PAD Protect Sheet.
5. Connect the Cable to the Connector. (CN9)
6. Attach the Tape.
7. Connect the 2 Cables to the 2 Connectors. (CN10,CN26)
8. Attach the Tape.
9. Attach the Antenna Cable Sheet on the Main PCB.
10. Fix the HDD FPC BAT using the 5 Screws.  No1 to
No5
Note: Tighten the Screws in the numbered order...

Page 45

9-23
Tighten of Screw  Tighten of 
Screw 
Tighten of 
Screw 
HDD Guide is set
Battery HDD Connector 
Angle is set FPC HDD Battery is set
Direction A
View
A
B C
Direction C
View
Direction B
1. Set HDD Guide and fix with Screw.
2. Fix with Screw.
3. Apply tetra coating to each connector pin.
This Connector does not need tetra coating.
Do not Fold. 
(R1    4)
View 

Page 46

9-24
9.2.13. Setting the USB PCB and Antenna PCB
1. Open the Connector Cover.
2. Fix the Antenna PCB using the 2 Screws. 
3. Connect the 2 white Cables.
4. Fix the USB PCB using the Screws. 
5. Connect the Cable to the Connector. (CN100)
6. Attach the Tape.
Screws : DRQT2+G6FKL
Screws : DRQT26+D4FKL
FPC
The attention of folding   : Breakage countermeasure.
1,The bending inside is R0.5   1
2,Don’t mistake a bending direction. Don’t use a mistaken thing.
(R0.5   1)
NGOK
Figure seen from direction of arrow...

Page 47

9-25
Q
 Assembly  of  USB PCB and Antenna PCB
Tighten of 
Screw  
Tighten of 
Screw  
Tighten of Screw
EXT Antenna PCB 
is setW-LAN Cable 
Connection
Safety Working Safety Working 
Attach the Tape
Attach the Antenna Cable Sheet
Antenna Cable 
Plate is set
Order of fixingScrew Screw
* Notes:
1. Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2\
Connect the coaxial cable from LCD.
Set on the top. Process the cable from LCD.Fit to the groove.  
Difference : 1 or less
Along the groove
Pull...

Page 48

9-26
9.2.14. Setting the DIMM  Cover and Bottom Cover
1. Set the Bottom Cover.
2. Fix the Bottom Cover using the 6 Screws.  No1 to No6
3. Fix the Bottom Cover using the 13 Screws.  No1 to
No13
4. Set the DIMM memory card.
5. Attach the DIMM Heat Plate.
6. Fix the DIMM Stopper Base using the 2 Screws. 
7. Fix the DIMM Cover using the 5 Screws. 
Screws : DRHM0002ZA
Screws : DRQT26+D4FKL
Screws : DRQT26+E4FKL
Screws : DRSB3+8FKL
Note: Tighten the Screws in the numbered order (No1 to No6).
Tighten the Screws...

Page 49

9-27
Q
 Preparation of DIMM Cover
LCD Cable Cover is set Keyboard Cable Cover is installed
Attach the LCD Cable Cover Cushion Attach the Keyboard Cable Cover Cushion
Safety Working 
Safety Working 
Attach the CD Edge Sheet Attach the CD Edge Sheet
4    6mm
4    6mm
0    1mm
1.5    2.5mm
* Notes:
1. Apply the load when attaching the attaching parts. 20N to 30N (2 to \
3Kgf)/cm2
0    0.5mm
0    0.5mm
0    0.5mm
0    0.5mm
DIMM Cover is set
Attach the DIMM Cover Cushion
Attach the DIMM Cover Spacer
*...

Page 50

9-28
9.2.15. Setting the GPS PCB and Bluetooth PCB
1. Fix the GPS BT Angle and GPS PCB using the 2 Screws.

2. Connect the Cable to the Connector on GPS PCB.
3. Fix the GPS Ass’y using the 4 Screws. 
4. Connect the Cable to the Connector. (CN25)
Screws : DFHE5025XA
Screws : DXQT2+F3FNL
Q  Cautions for Setting GPS ASSY and BT PCB ASSY
GPS PCB
Bluetooth
PCB
Connector(CN25)
 
GPS BT Angle



to Connector
(CN25)
Safety Working 
Safety Working 
Safety Working 
8   1
10    2
Main Antenna
Sub Antenna
Bluetooth...
Start reading Panasonic Cf30 Service Manual

Related Manuals for Panasonic Cf30 Service Manual

All Panasonic manuals