Page 41
Installation Manual • • • KSU Installation Page 27A6-506000-642-01 Wall Mounting the KSU Before wall mounting the KSU, it is recommended that the wall mounting screws be attached to the piece of plywood (13 mm thick or more) or attached to a sturdy wall. 1. Using two of the four screws (provided with the KSU) attach the wall mount template to the wall. (Refer to Figure 2-3:: Attaching the Wall Mounting Bracket for the KSU to the Wall, Pg 27.) 2. While holding the KSU, hang the upper two openings...
Page 42
Page 28KSU Installation • • • Installation Manual A6-506000-642-01 3. Using the other two provided screws, secure the KSU to the wall mount template by screwing the lower two openings located in the KSU base. (Refer to Figure 2-5:: Securing the KSU to the Wall Mount Template, Pg 28.) Installing or Replacing the Internal Backup Batteries These batteries provide power for the system in case of a power outage. Fully charged batteries provide power for approximately 30 minutes. 1. Be sure the system is...
Page 43
Installation Manual • • • KSU Installation Page 29A6-506000-642-01 6. Replace the metal plate on top of the new batteries. Place the grounding cable on top of the hole and tighten the screw using a philips head screwdriver. 7. Attach the battery connectors to CN3 (BATT1) and CN4 (BATT2) battery terminals. Insert the battery connectors over either battery terminal. The connector tab should be placed over the terminal tab. There is only one direction the tabs can be placed into the connector...
Page 44
Page 30KSU Installation • • • Installation Manual A6-506000-642-01 Connecting External Backup Batteries 1. Disconnect the Built-in Backup Battery Cables from CN3 and CN4 on the Power Supply. Position the loose battery cables safely inside the KSU. 2. Mount the external battery into the External Battery Cabinet (AKB-A-ZD KTU), as follows: Note:Two batteries must be connected per KSU and each cabinet houses just one battery. a.) Remove the four cover screws. b.) Pass the battery cables through the...
Page 45
Installation Manual • • • KSU Installation Page 31A6-506000-642-01 3. Mount the two External Battery Cabinets close to the KSU using the wood screws supplied and replace the cover using the four screws. (Refer to Figure 2-11:: Mounting the External Battery Cabinet, Pg 31.) 4. Connect the two external cable assemblies to CN3 and CN4 on the power supply. (Refer to Figure 2-12:: Connecting External Batteries, Pg 31.) Figure 2-11: Mounting the External Battery Cabinet Figure 2-12: Connecting External...
Page 46
Page 32KSU Installation • • • Installation Manual A6-506000-642-01 Grounding Requirements The KSU must be properly grounded. This can be achieved by a correctly wired AC outlet. If there is any uncertainty, obtain advice from a licensed electrical contractor. Where a ground (other than conduit ground) is used, a grounding terminal is provided on a B614-B13 KSU. (Refer to Figure 2-13:: KSU Grounding, Pg 32.) Connecting the B614-B13 KSU The CPU is the central processing unit (CPU). An 8-bit...
Page 47
Installation Manual • • • KSU Installation Page 33A6-506000-642-01 4. After waiting at least 30 seconds, change SW1 to HOLD position. Table 2-1 KSU Switches and Connections Figure 2-14: KSU Switch Settings NameDefault SettingDescription/Purpose SW1 CN1 CN2 CN3 CN4 CN5 CN6 CN7 CN8 CN9 CN11 CN12 CN13 CN14 CN15 CN16 CN17 CN18 CN20CLEAR ST 16 EXT.SPK MOH/BGM CO 12 FAX/PFT 12 RLY ESI DPH VRS VMS TRF PBR External ROM MIF SLI COI BRT COI BRT CID PSUSystem Memory Battery Backup (Hold/Clear) ESI Station...
Page 48
Page 34KSU Installation • • • Installation Manual A6-506000-642-01 Telephone Connections The B614-B13 ETU supports the connection of 6 digital extensions via CN1. Each port requires a single twisted pair cable and the connection is not polarity conscious. (Refer to Figure 2-15:: Telephone Connection, Pg 34) Figure 2-15: Telephone Connection Exchange Line connection The B614-B13 ETU supports the connection of 2 analogue exchange lines (Central Office or PABX) via CN2. This 2-wire connection is not...
Page 49
Installation Manual • • • KSU Installation Page 35A6-506000-642-01 If not required as power fail telephone ports, the FAX/PFT ports of CN2 can be used to connect other analogue equipment such as faxes and modems. These devices can make and receive calls as per the normal operation, when the associated trunks are not in used by other users of the system. Note that each device is dedicated to a trunk (CO1 or CO2) as indicated above. Any activity by these devices will be shown as a busy trunk status on...
Page 50
Page 36KSU Installation • • • Installation Manual A6-506000-642-01 If a Paging Alert Tone is required to precede each External Paging message, Memory Block 002-3 must be set. The paging equipment terminates onto the EXT.SPK connector of CN1 using a Special Connector. If amplifier on/off control is required, this terminates onto the General Purpose Relay connector (CN3-RLY), again using a Special Connector. Connection of this equipment must be via a Line Isolation Unit with a Telecommunications...