Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 System Description Instructions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 System Description Instructions Manual
Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 System Description Instructions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
DEFINITY Enterprise Communications Server Release 8.2 System Description 555-233-200 Issue 1 April 2000 Site Requirements 31 Floor-Plan Guidelines Floor-Plan Guidelines DEFINITY ECS floor plans vary with the size and shape of the equipment room and the extent of future growth. Future growth includes a new or upgraded system, adjuncts and peripherals, and the cross-connect field. See ‘‘Cross-Connect Field’’ on page 41. For floor standing cabinets, reserve the area behind a cabinet for the cross-connect field and the cable slack manager. For wall mounted cabinets, reserve the area beside the cabinets for the cross-connect field. Figure 10 through Figure 15 show typical floor plans. All dimensions are shown in inches. Refer to Table 11 for power requirements. Compact Modular Cabinet (CMC) Configuration Guidelines The cross-connect field is either to the rear or right of the cabinet. To allow service access, the table for the management terminal and optional printer is away from the equipment area. See Figure 10 and ‘‘Table Area’’ on page 40 for requirements. In an installation where no cross-connect field is present, an cross-connect field can be installed in the CMC right panel. The following steps are pre-installation guidelines: 1. Locate the power outlets outside the cross-connect field area. The outlets must not be controlled by a wall switch or be shared with other equipment. 2. Locate the trunk/auxiliary field inside the cross-connect field, if desired. 3. Ground the system. See ‘‘Approved Grounds’’ on page 62. 4. Each cabinet requires either: NEMA 5-15R receptacle (or equivalent) for United States installations or local IEC 320 cord set (or equivalent) for non-United States installations.
Site Requirements 32 Floor-Plan Guidelines DEFINITY Enterprise Communications Server Release 8.2 System Description 555-233-200 Issue 1 April 2000 Figure 10. Typical Compact Modular Cabinet Floor Plan NOTE: To provide power for testing equipment and peripherals, locate electrical outlets at intervals that are in accordance with local codes. Also, ensure that you locate the main shutoff switch near the door in accordance with local codes. Cross-connect field Electrical outlets Ta b l e PrinterSystem management terminalOptional SMT 12” 12” 12”25.5” 48” Compact modular cabinet Wall fpdftfp4 LJK 121399
DEFINITY Enterprise Communications Server Release 8.2 System Description 555-233-200 Issue 1 April 2000 Site Requirements 33 Floor-Plan Guidelines Single-Carrier Cabinet Configuration Guidelines The cross-connect field can be directly behind the cable slack manager. To allow service access, the table for the management terminal and optional printer is away from the equipment area. See Figure 11 and ‘‘Table Area’’ on page 40 for requirements. The following steps are pre-installation guidelines: 1. Locate the power outlets outside the cross-connect field area. The outlets must not be controlled by a wall switch or be shared with other equipment. 2. Locate the trunk/auxiliary field inside the cross-connect field, if desired. 3. Ground the system. See ‘‘Approved Grounds’’ on page 62. 4. For fiber connections between PNs, use a 20-foot (6.1 m) multimode fiber optic cable. 5. Install earthquake protection (if required). See ‘‘Earthquake Protection’’ on page 71. 6. Each cabinet requires either: NEMA 5-15R, NEMA 5-20R receptacle (or equivalent) for United States installations or local cord set (or equivalent) for non-United States installations.
Site Requirements 34 Floor-Plan Guidelines DEFINITY Enterprise Communications Server Release 8.2 System Description 555-233-200 Issue 1 April 2000 Figure 11. Typical Single-Carrier Cabinet Floor Plan NOTE: To provide power for testing equipment and peripherals, locate electrical outlets at intervals that are in accordance with local codes. Also, ensure that you locate the main shutoff switch near the door in accordance with local codes. LAN connectionCross-connect field Cable slack managerProcessor port network cabinet(s) (front) Electrical outlets Ta b l e Optional SMT Printer Wall 38 22 3227 System management terminal fpdfscc1 LJK 121399
DEFINITY Enterprise Communications Server Release 8.2 System Description 555-233-200 Issue 1 April 2000 Site Requirements 35 Floor-Plan Guidelines Multi-Carrier Cabinet Configuration Guidelines The cross-connect field is directly behind the cable slack manager. To allow service access, the table for the management terminal and optional printer is away from the equipment area. See Figure 12 and ‘‘Table Area’’ on page 40 for requirements. The following steps are pre-installation guidelines: 1. Locate the power outlets outside the cross-connect field area. The outlets must not be controlled by a wall switch or be shared with other equipment. 2. For the PPN cabinets, use either a NEMA 5-50R receptacle (or equivalent) or a NEMA L14-30R receptacle (or equivalent) power outlet or: 220 VAC, 50-60 Hz power outlet for the Global AC Cabinet. 3. For the Auxiliary Cabinet, use a NEMA 5-20R receptacle (or equivalent). 4. Allow at least 3 feet (91.4cm) of space in front of the cabinet to permit the door to open. 5. Ground the system. See ‘‘Approved Grounds’’ on page 62. 6. Install earthquake protection (if required). See ‘‘Earthquake Protection’’ on page 71. 7. Locate the LAN connection field inside the cross-connect field, if desired. 8. Fiber connections between PNs use a 20-foot (6.1 m) multimode fiber optic cable.
Site Requirements 36 Floor-Plan Guidelines DEFINITY Enterprise Communications Server Release 8.2 System Description 555-233-200 Issue 1 April 2000 Figure 12. Typical Multi-Carrier Cabinet Floorplan NOTE: To provide power for testing equipment and peripherals, locate electrical outlets at intervals that are in accordance with local codes. Also, ensure that you locate the main shutoff switch near the door in accordance with local codes. Cross-connect field Cable slack manager (optional) Cable slack manager Por t network cabinet (front)Auxiliary cabinet (optional) Electrical outlets Electrical outlet Ta b l e Printer Wall 38 2828 3232 LAN connection fpdfmcc1 LJK 121399 System management terminal Optional SMT
DEFINITY Enterprise Communications Server Release 8.2 System Description 555-233-200 Issue 1 April 2000 Site Requirements 37 Floor-Plan Guidelines Additional Floor Plans The following floor plans illustrate recommendations for other possible installations. See Figure 13, Figure 14, Figure 15, and Figure 16. Figure 13. Typical Floor Plan with EPN and Auxiliary Cabinet NOTE: To provide power for testing equipment and peripherals, locate electrical outlets at intervals that are in accordance with local codes. Also, ensure that you locate the main shutoff switch near the door in accordance with local codes. LAN connectionCross-connect field Cable slack manager (optional)Cable slack manager (optional) Cable slack manager PPN cabinet (front)EPN cabinet (optional)Auxiliary cabinet (optional) Electrical outlet Ta b l e Printer Wall 38 2828 323232 fpdftfp1 LJK 121399 System management terminal Optional SMT
Site Requirements 38 Floor-Plan Guidelines DEFINITY Enterprise Communications Server Release 8.2 System Description 555-233-200 Issue 1 April 2000 Figure 14. Typical Floor Plan with an additional EPN and Auxiliary Cabinets NOTE: To provide power for testing equipment and peripherals, locate electrical outlets at intervals that are in accordance with local codes. Also, ensure that you locate the main shutoff switch near the door in accordance with local codes. LAN connectionCross-connect field Ta b l e Printer Wall 38 28 Cable slack manager (optional) Cable slack manager PPN cabinet (front)EPN cabinets (optional)28 32 Cable slack manager (optional) Auxiliary cabinet (optional) 32 Cable slack manager (optional) Auxiliary cabinet (optional) 3232 fpdftfp3 LJK 121399 System management terminalElectrical outlets Electrical outlet Optional SMT
DEFINITY Enterprise Communications Server Release 8.2 System Description 555-233-200 Issue 1 April 2000 Site Requirements 39 Floor-Plan Guidelines Figure 15. Typical Floor Plan with Battery Cabinets NOTE: To provide power for testing equipment and peripherals, locate electrical outlets at intervals that are in accordance with local codes. Also, ensure that you locate the main shutoff switch near the door in accordance with local codes. LAN connectionCross-connect field Cable slack manager (optional)Cable slack manager (optional) Cable slack manager PPN cabinet (front) Battery cabinet (optional)Battery cabinet (optional) EPN cabinet (optional)Auxiliary cabinet (optional) Electrical outlet Ta b l e Printer 38 2828 21 323232 5555 fpdftfp5 LJK 121399 System management terminal Wall Optional SMT
Site Requirements 40 Floor-Plan Guidelines DEFINITY Enterprise Communications Server Release 8.2 System Description 555-233-200 Issue 1 April 2000 Figure 16. Typical Floor Plan with ATM Switch (Category A only) NOTE: To provide power for testing equipment and peripherals, locate electrical outlets at intervals that are in accordance with local codes. Also, ensure that you locate the main shutoff switch near the door in accordance with local codes. Ta b l e A r e a Reserve the table area in the equipment room for the management terminal and optional printer, if so equipped. Terminals require approximately 3.2 square feet (0.3 square m) of area. LAN connection AT M switchCross-connect field Cable slack manager (optional)Cable slack manager (optional) Cable slack manager PPN cabinet (front)EPN cabinet (optional)Auxiliary cabinet (optional) Electrical outlet Ta b l e Printer Wall 38 2828 323232 fpdftfp6 LJK 121399 System management terminal Optional SMT