Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 System Description Instructions Manual

Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 System Description Instructions Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 System Description Instructions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							DEFINITY Enterprise Communications Server Release 8.2
    System Description  555-233-200  Issue 1
    April 2000
    Site Requirements 
    31 Floor-Plan Guidelines 
    Floor-Plan Guidelines
    DEFINITY ECS floor plans vary with the size and shape of the equipment room and the 
    extent of future growth. Future growth includes a new or upgraded system, adjuncts and 
    peripherals, and the cross-connect field. See ‘‘Cross-Connect Field’’ on page 41.
    For floor standing cabinets, reserve the area behind a cabinet for the cross-connect field 
    and the cable slack manager. For wall mounted cabinets, reserve the area beside the 
    cabinets for the cross-connect field. Figure 10 through Figure 15 show typical floor plans. 
    All dimensions are shown in inches. Refer to Table 11 for power requirements.
    Compact Modular Cabinet (CMC) 
    Configuration Guidelines
    The cross-connect field is either to the rear or right of the cabinet. To allow service 
    access, the table for the management terminal and optional printer is away from the 
    equipment area. See Figure 10 and ‘‘Table Area’’ on page 40 for requirements. In an 
    installation where no cross-connect field is present, an cross-connect field can be 
    installed in the CMC right panel. 
    The following steps are pre-installation guidelines:
    1. Locate the power outlets outside the cross-connect field area. The outlets must not 
    be controlled by a wall switch or be shared with other equipment.
    2. Locate the trunk/auxiliary field inside the cross-connect field, if desired.
    3. Ground the system. See ‘‘Approved Grounds’’ on page 62.
    4. Each cabinet requires either: NEMA 5-15R receptacle
    (or equivalent) for United States installations or local IEC 320 
    cord set (or equivalent) for non-United States installations. 
    						
    							Site Requirements 
    32 Floor-Plan Guidelines 
    DEFINITY Enterprise Communications Server Release 8.2
    System Description  555-233-200  Issue 1
    April 2000
    Figure 10. Typical Compact Modular Cabinet Floor Plan
    NOTE:
    To provide power for testing equipment and peripherals, locate electrical 
    outlets at intervals that are in accordance with local codes. Also, ensure 
    that you locate the main shutoff switch near the door in accordance with 
    local codes.
    Cross-connect field
    Electrical
    outlets
    Ta b l e
    PrinterSystem
    management
    terminalOptional SMT
    12”
    12” 12”25.5”
    48” Compact
    modular
    cabinet
    Wall
    fpdftfp4 LJK 121399 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    System Description  555-233-200  Issue 1
    April 2000
    Site Requirements 
    33 Floor-Plan Guidelines 
    Single-Carrier Cabinet Configuration Guidelines
    The cross-connect field can be directly behind the cable slack manager. To allow service 
    access, the table for the management terminal and optional printer is away from the 
    equipment area. See Figure 11 and ‘‘Table Area’’ on page 40 for requirements.
    The following steps are pre-installation guidelines:
    1. Locate the power outlets outside the cross-connect field area. The outlets must not 
    be controlled by a wall switch or be shared with other equipment.
    2. Locate the trunk/auxiliary field inside the cross-connect field, if desired.
    3. Ground the system. See ‘‘Approved Grounds’’ on page 62.
    4. For fiber connections between PNs, use a 20-foot (6.1 m) multimode fiber optic 
    cable.
    5. Install earthquake protection (if required). See ‘‘Earthquake Protection’’ on page 
    71.
    6. Each cabinet requires either: NEMA 5-15R, NEMA 5-20R receptacle (or 
    equivalent) for United States installations or local 
    cord set (or equivalent) for non-United States installations. 
    						
    							Site Requirements 
    34 Floor-Plan Guidelines 
    DEFINITY Enterprise Communications Server Release 8.2
    System Description  555-233-200  Issue 1
    April 2000
    Figure 11. Typical Single-Carrier Cabinet Floor Plan
    NOTE:
    To provide power for testing equipment and peripherals, locate electrical 
    outlets at intervals that are in accordance with local codes. Also, ensure 
    that you locate the main shutoff switch near the door in accordance with 
    local codes.
    LAN
    connectionCross-connect field
    Cable
    slack
    managerProcessor
    port
    network
    cabinet(s)
    (front)
    Electrical
    outlets
    Ta b l e
    Optional SMT
    Printer
    Wall
    38
    22
    3227
    System
    management
    terminal
    fpdfscc1 LJK 121399 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    System Description  555-233-200  Issue 1
    April 2000
    Site Requirements 
    35 Floor-Plan Guidelines 
    Multi-Carrier Cabinet Configuration 
    Guidelines
    The cross-connect field is directly behind the cable slack manager. To allow service 
    access, the table for the management terminal and optional printer is away from the 
    equipment area. See Figure 12 and ‘‘Table Area’’ on page 40 for requirements. The 
    following steps are pre-installation guidelines:
    1. Locate the power outlets outside the cross-connect field area. The outlets must not 
    be controlled by a wall switch or be shared with other equipment.
    2. For the PPN cabinets, use either a NEMA 5-50R receptacle (or equivalent) or a 
    NEMA L14-30R receptacle (or equivalent) power outlet or: 220 VAC, 50-60 Hz 
    power outlet for the Global AC Cabinet.
    3. For the Auxiliary Cabinet, use a NEMA 5-20R receptacle (or equivalent).
    4. Allow at least 3 feet (91.4cm) of space in front of the cabinet to permit the door to 
    open.
    5. Ground the system. See ‘‘Approved Grounds’’ on page 62.
    6. Install earthquake protection (if required). See ‘‘Earthquake Protection’’ on page 
    71.
    7. Locate the LAN connection field inside the cross-connect field, if desired.
    8. Fiber connections between PNs use a 20-foot (6.1 m) multimode fiber optic cable. 
    						
    							Site Requirements 
    36 Floor-Plan Guidelines 
    DEFINITY Enterprise Communications Server Release 8.2
    System Description  555-233-200  Issue 1
    April 2000
    Figure 12. Typical Multi-Carrier Cabinet Floorplan
    NOTE:
    To provide power for testing equipment and peripherals, locate electrical 
    outlets at intervals that are in accordance with local codes. Also, ensure 
    that you locate the main shutoff switch near the door in accordance with 
    local codes.
    Cross-connect field
    Cable
    slack
    manager
    (optional) Cable
    slack
    manager
    Por t
    network
    cabinet
    (front)Auxiliary
    cabinet
    (optional)
    Electrical
    outlets Electrical
    outlet
    Ta b l e
    Printer
    Wall
    38
    2828
    3232
    LAN connection
    fpdfmcc1 LJK 121399
    System
    management
    terminal
    Optional SMT 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    System Description  555-233-200  Issue 1
    April 2000
    Site Requirements 
    37 Floor-Plan Guidelines 
    Additional Floor Plans
    The following floor plans illustrate recommendations for other possible installations. See 
    Figure 13, Figure 14, Figure 15, and Figure 16.
    Figure 13. Typical Floor Plan with EPN and Auxiliary Cabinet
    NOTE:
    To provide power for testing equipment and peripherals, locate electrical 
    outlets at intervals that are in accordance with local codes. Also, ensure 
    that you locate the main shutoff switch near the door in accordance with 
    local codes.
    LAN connectionCross-connect field
    Cable
    slack
    manager
    (optional)Cable
    slack
    manager
    (optional) Cable
    slack
    manager
    PPN
    cabinet
    (front)EPN
    cabinet
    (optional)Auxiliary
    cabinet
    (optional)
    Electrical
    outlet
    Ta b l e
    Printer
    Wall
    38
    2828
    323232
    fpdftfp1 LJK 121399
    System
    management
    terminal
    Optional SMT 
    						
    							Site Requirements 
    38 Floor-Plan Guidelines 
    DEFINITY Enterprise Communications Server Release 8.2
    System Description  555-233-200  Issue 1
    April 2000
    Figure 14. Typical Floor Plan with an additional EPN and Auxiliary Cabinets
    NOTE:
    To provide power for testing equipment and peripherals, locate electrical 
    outlets at intervals that are in accordance with local codes. Also, ensure 
    that you locate the main shutoff switch near the door in accordance with 
    local codes.
    LAN connectionCross-connect field
    Ta b l e
    Printer
    Wall
    38
    28
    Cable
    slack
    manager
    (optional) Cable
    slack
    manager
    PPN
    cabinet
    (front)EPN
    cabinets
    (optional)28
    32
    Cable
    slack
    manager
    (optional)
    Auxiliary
    cabinet
    (optional)
    32
    Cable
    slack
    manager
    (optional)
    Auxiliary
    cabinet
    (optional)
    3232
    fpdftfp3 LJK 121399
    System
    management
    terminalElectrical
    outlets Electrical
    outlet
    Optional SMT 
    						
    							DEFINITY Enterprise Communications Server Release 8.2
    System Description  555-233-200  Issue 1
    April 2000
    Site Requirements 
    39 Floor-Plan Guidelines 
    Figure 15. Typical Floor Plan with Battery Cabinets
    NOTE:
    To provide power for testing equipment and peripherals, locate electrical 
    outlets at intervals that are in accordance with local codes. Also, ensure 
    that you locate the main shutoff switch near the door in accordance with 
    local codes.
    LAN connectionCross-connect field
    Cable
    slack
    manager
    (optional)Cable
    slack
    manager
    (optional) Cable
    slack
    manager
    PPN
    cabinet
    (front)
    Battery
    cabinet
    (optional)Battery
    cabinet
    (optional) EPN
    cabinet
    (optional)Auxiliary
    cabinet
    (optional)
    Electrical
    outlet
    Ta b l e
    Printer
    38
    2828
    21
    323232
    5555
    fpdftfp5 LJK 121399
    System
    management
    terminal
    Wall
    Optional SMT 
    						
    							Site Requirements 
    40 Floor-Plan Guidelines 
    DEFINITY Enterprise Communications Server Release 8.2
    System Description  555-233-200  Issue 1
    April 2000
    Figure 16. Typical Floor Plan with ATM Switch (Category A only)
    NOTE:
    To provide power for testing equipment and peripherals, locate electrical 
    outlets at intervals that are in accordance with local codes. Also, ensure 
    that you locate the main shutoff switch near the door in accordance with 
    local codes.
    Ta b l e  A r e a
    Reserve the table area in the equipment room for the management terminal and optional 
    printer, if so equipped. Terminals require approximately 3.2 square feet (0.3 square m) of 
    area. 
    LAN connection
    AT M
    switchCross-connect field
    Cable
    slack
    manager
    (optional)Cable
    slack
    manager
    (optional) Cable
    slack
    manager
    PPN
    cabinet
    (front)EPN
    cabinet
    (optional)Auxiliary
    cabinet
    (optional)
    Electrical
    outlet
    Ta b l e
    Printer
    Wall
    38
    2828
    323232
    fpdftfp6 LJK 121399
    System
    management
    terminal
    Optional SMT 
    						
    All Lucent Technologies manuals Comments (0)

    Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 System Description Instructions Manual