GTE Omni Si Database Technical Practices Issue 1 Manual
Here you can view all the pages of manual GTE Omni Si Database Technical Practices Issue 1 Manual. The GTE manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 401
TL-130400-1001LIST OF TABLESTABLE PAGE PARA- - s-31 133.3S-322 34.1S-323 34.2S-324 34.3S-324 34.4S-352 36.1s-353 36.2s-354 36.3S-364 36.4TOPIC DPFIAMP, APM, SPM Description Office-Dependent Data Base Listing Table of Contents Table T2541 T2541 Description Party ldentifer/Circuit Number ICL Objectives for PABX Circuits (VNL Design) FCL and VNLP Digital Pad Switching Rules ICL and FLP Digital Pad Switching Rules Optional Pads SW 52108187 S-23
Page 403
-TL-130500-1001 GENERAL1.0 This technical practice describes the Fujitsu GTE Business Systems’ OMNI SI Digital PABX (Private Automatic Branch Exchange) manufactured by Fujitsu GTE Business System’s Inc SVR (System Version Release) 5210 incorporates packet switching data into system. This practice describes both voice and data: l System hardware components - general description - operation overview - interaction o Trunks, lines, and system capacities l Ordering procedures l Software subroutines The...
Page 405
TL-130500-1001 EQUIPMENT CABINET2.0 The equipment cabinet (Figure 2.1) contains the following: l System computer and memory0 Common control equipment l Digital time-switch network l Line, trunk, and feature circuits l Optional CD-100 or PD-200 data switching hardware The cabinet and internal chassis are constructed of high-grade steel. Universal cabinet doors can be removed for maintenance and provide for left- or right-hand door hinge mounting. Cutouts and louvers provide cooling for the equipment...
Page 406
TL-130500-1001Equipment Cabinet Placement Equipment Cabinet Cabling Cabinet ConfigurationContents of Lower Files2.1 A detailed description of cabinet placement and installation within the site can be found in TL-130300-1001. 2.2 Cable is routed through an access hole in the rear of the cabinet, near the cabinet base. The cable connects to the CDF (Combined Distribution Frame) at sites using typical central office methods. TL-130300-1001 provides information for cabinet and system cabling. 2.3 This...
Page 407
TL-130500-10010 Equipment files - Get Started File - Expansion File - PMT (Power Monitor Transfer) file * Power Supplies - 1 for Get Started and PMT Files - 1 for Expansion File (optional) l Battery Pack (optional) -available in 2-, 8-, or 14-hourholdup times; maintains memory integrity when AC power is lost. l Ring Generator standard 20 watt FILE XEXPANSION FILEI FILE Y GET STARTED FILEEXPANSION PWR SUP ,-I(REAR) r------------IiGETSTARTED PWR SUP (REAR) DISK DRIVEl Floppy Disk Drive -8 megabyte...
Page 408
TL-130500-1001Get Started2.3.2 The Get Started File includes the following: Filel Equipment that provides common system monitoring and control l Digital time-switching network for all lines, trunks, and features used in the system l Line, trunk, and feature cards as welt as their interface control Expansion2.3.3 Figure 2.3 shows the Get Started and Expansion FileFiles.l The two files provide a total of: 256 lines, 64 trunks, l’20 low speed data ports, 30 high speed data ports, or some combination...
Page 409
FILE XEXPANSION FILE FILE Y GET STARTED FILEGET STARTEDPWR SUP. (REAR) FLOPPY DISK DRIVEHARD DISK DRIVEEXPANSION PWR SUP (REAR)r------------ I BATTERY TRANSFER COMMON CONTROLFigure 2.3 OMNI SI SW 52108187
Page 410
TL-130500-1001S-32Table 2.1 System Trade-Offs Lines (Cards)Trunks (Cards)I 160 (20)I56 (14)I 136 (17) 60 (15) 128 (16)64 (16) * 120 (15)8 (2) 24 (3) 0 (0) * = software limit 40 (10) 8187SVR 5210