Page 51
GE MEDICAL SYSTEMS PROPRIETARY TO GE D IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARYMANUAL Chapter 2 Pre-Installation 2-1 Chapter 2 Pre-Installation Section 2-1 Overview 2-1-1 Purpose of Chapter 2 This chapter provides the information required to plan and prepare for the installation of a LOGIQ™ 9. Included are descriptions of the facility and electrical needs to be met by the purchaser of the unit. Table 2-1 Contents in Chapter 2 SectionDescriptionPage Number 2-1 Overview2-1 2-2 General...
Page 52
GE MEDICAL SYSTEMSPROPRIETARY TO GE D IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARYMANUAL 2-2 Section 2-2 - General Console Requirements Section 2-2 General Console Requirements 2-2-1 Console Environmental Requirements 2-2-1-1 Cooling The cooling requirement for the LOGIQ™ 9 is 3500 BTU/hr. This figure does not include cooling needed for lights, people, or other equipment in the room. Each person in the room places an additional 300 BTU/hr. demand on the cooling system. 2-2-1-2 Lighting...
Page 53
GE MEDICAL SYSTEMS PROPRIETARY TO GE D IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARYMANUAL Chapter 2 Pre-Installation 2-3 2-2-2-3 Site Circuit Breaker It is recommended that the branch circuit breaker for the machine be readily accessible. 2-2-2-4 Site Power Outlets A dedicated AC power outlet must be within reach of the unit without extension cords. Other adequate outlets for the external peripherals, medical and test equipment needed to support this unit must also be present within 1 m (3.2...
Page 54
GE MEDICAL SYSTEMSPROPRIETARY TO GE D IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARYMANUAL 2-4 Section 2-2 - General Console Requirements 2-2-3 EMI Limitations Ultrasound machines are susceptible to Electromagnetic Interference (EMI) from radio frequencies, magnetic fields, and transients in the air or wiring. Ultrasound machines also generate EMI. The LOGIQ™ 9 complies with limits as stated on the EMC label. However, there is no guarantee that interference will not occur in a particular...
Page 55
GE MEDICAL SYSTEMS PROPRIETARY TO GE D IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARYMANUAL Chapter 2 Pre-Installation 2-5 2-2-4 Scan Probe Environmental Requirements Operation:10° to 40° C Storage:-20° to 50° C NOTE: Temperature in degrees C. Conversion to Degrees F = (Degrees C * 9/5) + 32). 2-2-5 Time and Manpower Requirements Site preparation takes time. Begin Pre-installation checks as soon as possible. If possible, allow six weeks before delivery, for enough time to make necessary...
Page 56
GE MEDICAL SYSTEMSPROPRIETARY TO GE D IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARYMANUAL 2-6 Section 2-3 - Facility Needs Section 2-3 Facility Needs 2-3-1 Purchaser Responsibilities The work and materials needed to prepare the site is the responsibility of the purchaser. Delay, confusion, and waste of manpower can be avoided by completing pre installation work before delivery. Use the Pre installation checklist to verify that all needed steps have been taken. Purchaser responsibility...
Page 57
GE MEDICAL SYSTEMS PROPRIETARY TO GE D IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARYMANUAL Chapter 2 Pre-Installation 2-7 2-3-2 Required Features NOTE: GE Medical Systems requires a dedicated power and ground for the proper operation of its Ultrasound equipment. This dedicated power shall originate at the last distribution panel before the system. Sites with a mains power system with defined Neutral and Live: The dedicated line shall consist of one phase, a neutral (not shared with any other...
Page 58
GE MEDICAL SYSTEMSPROPRIETARY TO GE D IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARYMANUAL 2-8 Section 2-3 - Facility Needs 2-3-4 Minimal Floor Plan Suggestion Figure 2-1 Minimal Floor Plan
Page 59
GE MEDICAL SYSTEMS PROPRIETARY TO GE D IRECTION 2294854-100, REVISION 3 LOGIQ™ 9 PROPRIETARYMANUAL Chapter 2 Pre-Installation 2-9 2-3-5 Networking Pre-installation Requirements 2-3-5-1 Purpose of the DICOM Network Function DICOM services provide the operator with clinically useful features for moving images and patient information over a hospital network. Examples of DICOM services include the transfer of images to workstations for viewing or transferring images to remote printers. As an added...
Page 60