Page 11

432-0005-00-12 Rev 100 — Voyager III Installation Guide 9
Physical Installation
Voyager III Bulkhead Box 
• Provide room for adequate service loops as depicted in the installation drawings supplied.
• Using customer-supplied hardware, moun t the Voyager III bulkhead box. Refer 
to the bulkhead box drawings in the Voyager III ICD for detailed instructions.
203.20 mm (8.00 in.)
203.20 mm (8.00 in.)
174.61 mm
(6.87 in.)
110.49 mm
Recommended
(4.35 in.)
323.85 mm
(12.75 in.) 8X 7.92 mm (0.31 in.)
Bulkhead...

Page 12

Physical Installation
10432-0005-00-12 Rev 100 — Voyager III Installation Guide 
Voyager III Joystick Control Unit (JCU) 
The cable gland seal is designed for use with double-shielded category 5 
Ethernet cable. To ensure a good seal and to maintain compliance with EMI 
ratings, a double-shielded cable is required.
The JCU enclosure is rated IP66 above the JCU mounting surface/gasket and 
rated IP64 behind or below the gasket.
Caution : An installation template is provided in the JCU ICD (Doc. #...

Page 13

432-0005-00-12 Rev 100 — Voyager III Installation Guide 11
Electrical Connections
If you intend to mount the JCU to a panel of 0.31 inches (0.79 cm) thickness or 
less, remove the clamps from the mounting screws, turn them around and thread 
them back onto each of the four screws. In this configuration, the clamp foot faces 
the rear of the mounting surface and a llows the clamp to contact thinner panel 
surfaces while still allowing for proper co mpression of the JCU mounting gasket to 
form a...

Page 14

Electrical Connections
12432-0005-00-12 Rev 100 — Voyager III Installation Guide 
Proper Grounding
Caution: Ensure the Voyager III system is properly grounded. The camera body 
and bulkhead box chassis grounding studs are provided for implementing the 
grounding scheme applicable to the vessel.
Caution:  If multiple analog video displays are installed, to minimize ground loops 
FLIR recommends using a video distribution panel for each video channel 
(primary and secondary) specific to the installation...

Page 15

432-0005-00-12 Rev 100 — Voyager III Installation Guide 13
Electrical Connections
• Channel locks 
• 2 mm flathead screw driver 
Install the Main Sensor Cable Gland Seal
Step 1.Remove the main sensor cable feed-through gland seal (A) by 
unscrewing the lock nut (B) on the inside of the bulkhead box.
Step 2.Unscrew the squeeze nut (C) from the gland body (D), as shown above, 
to expose the gland barrel (E).
Step 3.Remove the gland barrel from the gland body by inserting a finger and 
pulling it out.
Step...

Page 16

Electrical Connections
14432-0005-00-12 Rev 100 — Voyager III Installation Guide 
Step 6.Measure a minimum of 15.75 in. (40 cm) from the end of the cable, 
carefully cut around the outer black cable jacket until you can slide it off, 
and remove it. Be careful not to cut into the metal braid beneath the outer 
jacket.
Step 7.Slide the black outer jacket off the c able, exposing the inner metal braid. 
Step 8.Push the braid back over the black outer jacket an inch or two, creating 
an area of slack in the...

Page 17

432-0005-00-12 Rev 100 — Voyager III Installation Guide 15
Electrical Connections
Step 14.Slide the gland body over the gland barrel; capturing the metal braid 
between the two.
Step 15.Screw and tighten the squeeze nut  onto the gland body as shown. 
You are now ready to prepare the cable ends for connection to the bulkhead box’s 
internal terminal blocks and connectors. Refer to the Voyager III bulkhead box 
description in the ICD.
Note: All trim lengths are terminated wire lengths—the wire and the...

Page 18

Electrical Connections
16432-0005-00-12 Rev 100 — Voyager III Installation Guide 
Step 7.The wires for J5 and J6 will need to be prepared in a fashion similar to 
the following progression. Carefully meas ure, cut, and strip each wire as 
described in the Voyager III bulkhead box description in the ICD. 
Slide the outer insulation off. 
Separate the inner wires.
When this is done, they are ready for termination to the terminal block 
plugs for J5 and J6.
Note: You can terminate the wires at J5 and J6...

Page 19

432-0005-00-12 Rev 100 — Voyager III Installation Guide 17
Electrical Connections
Step 8.The finished cable, shown below, has the RJ45 connector, two BNC video 
connectors, and all other leads termi nated at the terminal block plugs.
Step 9.Carefully slide all of the prepared 
wires and the video cables through 
the hole in the bulkhead box. 
Step 10.Slide the locknut over the wires 
and tighten to secure the cable 
gland seal to the bulkhead box.
Step 11.If you have not done so already, 
connect the...

Page 20

Electrical Connections
18432-0005-00-12 Rev 100 — Voyager III Installation Guide 
Note:Use the Video Tracker PCB, PN 250-0404-00, at connector J7 if the 
Video Tracker module is removed from the bulkhead box for service or repair and 
you want to continue using the camera system without it. The PCB is provided in 
a separate bag in the bulkhead box. 