Flir ThermovisionVoyager III Installation Guide
Have a look at the manual Flir ThermovisionVoyager III Installation Guide online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 33 Flir manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
432-0005-00-12 Rev 100 — Voyager III Installation Guide 9 Physical Installation Voyager III Bulkhead Box • Provide room for adequate service loops as depicted in the installation drawings supplied. • Using customer-supplied hardware, moun t the Voyager III bulkhead box. Refer to the bulkhead box drawings in the Voyager III ICD for detailed instructions. 203.20 mm (8.00 in.) 203.20 mm (8.00 in.) 174.61 mm (6.87 in.) 110.49 mm Recommended (4.35 in.) 323.85 mm (12.75 in.) 8X 7.92 mm (0.31 in.) Bulkhead Box Mounting Dimensions
Physical Installation 10432-0005-00-12 Rev 100 — Voyager III Installation Guide Voyager III Joystick Control Unit (JCU) The cable gland seal is designed for use with double-shielded category 5 Ethernet cable. To ensure a good seal and to maintain compliance with EMI ratings, a double-shielded cable is required. The JCU enclosure is rated IP66 above the JCU mounting surface/gasket and rated IP64 behind or below the gasket. Caution : An installation template is provided in the JCU ICD (Doc. # 500-0385- 19). If you print the te mplate from the PDF file, ensure that it was printed to the correct scale by checking the dimensions prior to cutting any holes. Standard JCU Mounting Instructions 1.Using the JCU template supplied as a guide in Doc. # 500-0385-19, mark the location of the rectangular opening that will allow the JCU to be recessed in the vessel’s control console. Ensure the corners are marked precisely and cut square. 2.Apply the adhesive side of the rubber ga sket to the back of the JCU on the surface that faces the mounting platform. The JCU comes with 4 panel mounting clamps that can be reversed when the thickness of the panel material is less than 5/16 inches (0.31 in, 0.79 cm; see instructions below). Ensure the mounting clamps are rotated inward and are recessed so the entire JCU fits into the hole. 3.Remove boots from both ends of the Ethernet cable, as it may interfere with the coupling gland. The boot may cause the RJ45 connector tab to depress, which can lead to intermittent connections. 4.Loosen or remove the cable gland nut on the JCU, and insert the Ethernet cable RJ45 connector through the gland nut. Once the Ethernet cable is connected to the JCU, replace the gland nut and turn the nut 1/4 turn beyond hand tight. 5.Insert the JCU into the hole and secure by turning the 4 corner screws clockwise. Rotate each screw one full turn and ensure the mounting clamps are rotated outward from the JCU housing. Tighten the screws to draw the mounting clamps up against the mounti ng surface and then tighten another quarter or half turn. Do not overtighten the screws. Mounting the JCU to a Thin Panel As shipped from the factory, the JCU can be mounted to dash thicknesses ranging from 0.31 – 1.750 inches (0.79 – 4.45 cm). The clamps are set with the small foot on the clamp facing away from the panel and toward the front of the JCU, as shown below.
432-0005-00-12 Rev 100 — Voyager III Installation Guide 11 Electrical Connections If you intend to mount the JCU to a panel of 0.31 inches (0.79 cm) thickness or less, remove the clamps from the mounting screws, turn them around and thread them back onto each of the four screws. In this configuration, the clamp foot faces the rear of the mounting surface and a llows the clamp to contact thinner panel surfaces while still allowing for proper co mpression of the JCU mounting gasket to form a watertight seal. Electrical Connections The following sections describe the connec tions to the Voyager III system. Refer to the NMEA 0183 Standard for details on interconnecting the Voyager III with other marine electronic devices. Caution : During installation, ensure the main sensor cable exiting the Voyager III camera body maintains a minimum bend radi us of five inches, is not in contact with sharp edges, and is not pinched be tween any mounting surface. Do not pull on the cables. Caution: It is recommended that any built-up triboelectric charge on the Ethernet cable should be discharged before connecting it to the bulkhead box and JCU. This can be accomplished simply by pressing an ungloved finger across the Ethernet RJ45 connector of the cable for a few seconds. JCU Clamp reversed for mounting JCU to thin panel
Electrical Connections 12432-0005-00-12 Rev 100 — Voyager III Installation Guide Proper Grounding Caution: Ensure the Voyager III system is properly grounded. The camera body and bulkhead box chassis grounding studs are provided for implementing the grounding scheme applicable to the vessel. Caution: If multiple analog video displays are installed, to minimize ground loops FLIR recommends using a video distribution panel for each video channel (primary and secondary) specific to the installation environment and then attaching the multiple display to the distribution panels. Main Sensor Cable After routing the main sensor cable between the Voyager III camera body and the bulkhead box, prepare it for termination inside the bulkhead box as described in the following procedures. The following tools and documents are recommended to complete the job: • The bulkhead box drawing in the Voyager III ICD (Doc. # 500-0483-19) • Ruler or measuring tape • Exacto knife • Scissors • Wire cutter • Wire stripper for 20 gauge wires • Crimping tool for BNC connector (RG-179) M5 ground stud M5 ground stud Main sensor cable connector
432-0005-00-12 Rev 100 — Voyager III Installation Guide 13 Electrical Connections • Channel locks • 2 mm flathead screw driver Install the Main Sensor Cable Gland Seal Step 1.Remove the main sensor cable feed-through gland seal (A) by unscrewing the lock nut (B) on the inside of the bulkhead box. Step 2.Unscrew the squeeze nut (C) from the gland body (D), as shown above, to expose the gland barrel (E). Step 3.Remove the gland barrel from the gland body by inserting a finger and pulling it out. Step 4.Slide the squeeze nut (C), gland barrel (E), and gland body (D) over the cable and out of the way of preparing the main cable for attachment to the bulkhead box. Step 5.As shipped, the standard cables have flying leads that are labeled and grouped for additional preparation. Refer to the Voyager III bulkhead box description in the ICD. ABCD E M5 ground stud DCE
Electrical Connections 14432-0005-00-12 Rev 100 — Voyager III Installation Guide Step 6.Measure a minimum of 15.75 in. (40 cm) from the end of the cable, carefully cut around the outer black cable jacket until you can slide it off, and remove it. Be careful not to cut into the metal braid beneath the outer jacket. Step 7.Slide the black outer jacket off the c able, exposing the inner metal braid. Step 8.Push the braid back over the black outer jacket an inch or two, creating an area of slack in the braid. Step 9.Carefully insert scissor tips into the braid, and cut all the way around it. Slide the excess braid off the cable and discard it. Step 10.Working with the shorter length of braid, trim it so that only 1inch extends beyond the black outer jacket. Step 11.Slide the gland barrel up the cable so that the front edge just lines up with the end of the black outer cable jacket as shown below. Step 12.Carefully fold the metal braid back over the gland barrel as shown. Step 13.Trim the metal braid so that the braid is 2 mm past the black O-ring. 2 mm
432-0005-00-12 Rev 100 — Voyager III Installation Guide 15 Electrical Connections Step 14.Slide the gland body over the gland barrel; capturing the metal braid between the two. Step 15.Screw and tighten the squeeze nut onto the gland body as shown. You are now ready to prepare the cable ends for connection to the bulkhead box’s internal terminal blocks and connectors. Refer to the Voyager III bulkhead box description in the ICD. Note: All trim lengths are terminated wire lengths—the wire and the specific termination are included in the length. Install the Main Sensor Cable Step 1.Spread apart the individual wire bundles to make them easier to identify and work with. Cut and terminate the cables to the lengths as defined in the Voyager III bulkhead box description in the ICD. Step 2.Ethernet cable —Terminate to RJ45 connector per TIA/EIA-568B standard. If you are unsure how to terminate this type of connector, contact FLIR for additional information. Step 3.Video cables —Two RG-179 video cables terminate to crimpable 75 ohm BNC connectors (provided). If you are unsure how to terminate this type of connector, contact FLIR for additional information. Step 4.Relabel the video cables using flag-type labels: Video 1 becomes Primary Video In Video 2 becomes Secondary Video In Step 5.System power and pan/tilt power —Four twisted pairs terminate to terminal block J5. Step 6.Communication ports —Six conductor (five are used) with braid terminate to terminal block J6.
Electrical Connections 16432-0005-00-12 Rev 100 — Voyager III Installation Guide Step 7.The wires for J5 and J6 will need to be prepared in a fashion similar to the following progression. Carefully meas ure, cut, and strip each wire as described in the Voyager III bulkhead box description in the ICD. Slide the outer insulation off. Separate the inner wires. When this is done, they are ready for termination to the terminal block plugs for J5 and J6. Note: You can terminate the wires at J5 and J6 after the cable is installed into the bulkhead box to increase the clearance around the cable leads while inserting them into the bulkhead box.
432-0005-00-12 Rev 100 — Voyager III Installation Guide 17 Electrical Connections Step 8.The finished cable, shown below, has the RJ45 connector, two BNC video connectors, and all other leads termi nated at the terminal block plugs. Step 9.Carefully slide all of the prepared wires and the video cables through the hole in the bulkhead box. Step 10.Slide the locknut over the wires and tighten to secure the cable gland seal to the bulkhead box. Step 11.If you have not done so already, connect the wires from the main sensor cable to the terminal block plugs at J5 and J6. Step 12.Make the following connections: The Ethernet plug to E1 Primary Video In to J9 Secondary Video In to J10 Refer to the ICD for details of the bulkhead box connections or review the following graphic (also inside the cover door of the bulkhead box) for a color-coded guide. Terminated Main Sensor Cable J5 J6 BNC VideoRJ45 Install heat shrink tubing as shown.
Electrical Connections 18432-0005-00-12 Rev 100 — Voyager III Installation Guide Note:Use the Video Tracker PCB, PN 250-0404-00, at connector J7 if the Video Tracker module is removed from the bulkhead box for service or repair and you want to continue using the camera system without it. The PCB is provided in a separate bag in the bulkhead box.